E6-7700. City of Ottumwa, IA; Notice of Application Tendered for Filing With the Commission, Soliciting Additional Study Requests, and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments
-
Start Preamble
May 12, 2006.
Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.
a. Type of Application: New License.
b. Project No.: 925-010.
c. Date Filed: April 26, 2006.
d. Applicant: City of Ottumwa, Iowa.
e. Name of Project: Ottumwa Hydroelectric Project.
f. Location: On the Des Moines River in the City of Ottumwa, Wapello Start Printed Page 29331County, Iowa. The project does not occupy Federal lands.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Richard Wilcox, Ottumwa Water and Hydro, 230 Turner Drive, Ottumwa, Iowa 52501, (641) 684-4606.
i. FERC Contact: Timothy Konnert, (202) 502-6359 or timothy.konnert@ferc.gov.
j. Cooperating agencies: We are asking Federal, state, local, and tribal agencies with jurisdiction and/or special expertise with respect to environmental issues to cooperate with us in the preparation of the environmental document. Agencies who would like to request cooperating status should follow the instructions for filing comments described in item l below.
k. Pursuant to § 4.32(b)(7) of 18 CFR of the Commission's regulations, if any resource agency, Indian Tribe, or person believes that an additional scientific study should be conducted in order to form an adequate factual basis for a complete analysis of the application on its merit, the resource agency, Indian Tribe, or person must file a request for a study with the Commission not later than 60 days from the date of filing of the application, and serve a copy of the request on the applicant.
l. Deadline for filing additional study requests and requests for cooperating agency status: June 26, 2006.
All documents (original and eight copies) should be filed with: Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.
Additional study requests and requests for cooperating agency status may be filed electronically via the Internet in lieu of paper. The Commission strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site (http://www.ferc.gov) under the “eFiling” link.
m. This application is not ready for environmental analysis at this time.
n. The existing Ottumwa Project consists of: (1) An 18-foot-high dam with a 641-foot-long spillway section equipped with eight Taintor gates and one bascule gate; (2) a 125-acre reservoir with a normal water surface elevation of 638.5 feet msl; (3) a powerhouse integral to the dam containing three generating units, unit 1 and unit 3 each rated at 1,000 kW and unit 2 rated at 1,250 kW; and (4) appurtenant facilities. The applicant estimates that the average annual generation would be 10,261,920 kilowatt hours using the three generating units with a combined capacity of 3,250 kW.
o. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's Web site at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for TTY, (202) 502-8659. A copy is also available for inspection and reproduction at the address in item h above.
You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support.
p. With this notice, we are initiating consultation with the Iowa State Historic Preservation Officer (SHPO), as required by section 106, National Historic Preservation Act, and the regulations of the Advisory Council on Historic Preservation, 36 CFR 800.4.
q. Procedural schedule and final amendments: The application will be processed according to the following Hydro Licensing Schedule. Revisions to the schedule will be made as appropriate. The Commission staff proposes to issue one environmental assessment rather than issue a draft and final EA. Comments, terms and conditions, recommendations, prescriptions, and reply comments, if any, will be addressed in an EA. Staff intents to give at least 30 days for entities to comment on the EA, and will take into consideration all comments received on the EA before final action is taken on the license application.
Issue Acceptance or Deficiency Letter: June 2006.
Issue Scoping Document: July 2006.
Notice of application is ready for environmental analysis: September 2006.
Notice of the availability of the EA: March 2007.
Ready for Commission's decision on the application: May 2007.
Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis.
Start SignatureMagalie R. Salas,
Secretary.
[FR Doc. E6-7700 Filed 5-19-06; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 05/22/2006
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- E6-7700
- Pages:
- 29330-29331 (2 pages)
- Docket Numbers:
- Project No. 925-010
- EOCitation:
- of 2006-05-12
- PDF File:
- e6-7700.pdf