    DEPARTMENT OF DEFENSE
    Federal Energy Regulatory Commission
    [Docket No. ER92-809-003, et al.]
    
     
    
    Illinois Power Co., et al.; Electric Rate and Corporate 
    Regulation Filings
    
    May 16, 1994.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. Illinois Power Co.
    
    [Docket No. ER92-809-003]
    
        Take notice that on April 29, 1994, Illinois Power Company 
    (Illinois) tendered for filing its compliance filing in the above-
    referenced docket. In addition, on May 5, 1994 Illinois filed revised 
    pages to its April 29, 1994 filing in the above-referenced docket.
        Comment date: May 31, 1994, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    2. AES Power, Inc.
    
    [Docket No. ER94-890-001]
    
        Take notice that on April 28, 1994, AES Power Inc. filed certain 
    information as required by the Commission's April 8, 1994 letter order 
    in Docket No. ER94-890-000. Copies of AES Power, Inc.'s informational 
    filing are on file with the Commission and are available for public 
    inspection.
    
    3. New York State Electric & Gas Corp.
    
    [Docket No. ER94-9-000]
    
        Take notice that on New York State Electric & Gas Corporation 
    (NYSEG) on May 9, 1994, tendered for filing an amendment to its initial 
    rate schedule that was filed on October 6, 1993 in the above-referenced 
    docket. NYSEG's filing in this docket pertains to an Agreement between 
    NYSEG and Consolidated Edison Company of New York, Inc. (Con Edison), 
    under which NYSEG may sell and Con Edison may purchase energy only or 
    electric generating capacity and associated energy, as the parties may 
    mutually agree from time to time. The current filing is being made at 
    Commission's Staff's request, and explains various aspects of the 
    agreement.
        NYSEG requests that October 7, 1993 be allowed as the effective 
    date of this filing and requests waiver of the 60-day notice 
    requirement for good cause shown.
        NYSEG served copies of the filing upon the New York State Public 
    Service Commission and Con Edison.
        Comment date: May 31, 1994, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    4. North American Energy Conservation, Inc.
    
    [Docket No. ER94-152-001]
    
        Take notice that on April 28, 1994, North American Energy 
    Conservation, Inc. filed certain information as required by the 
    Commission's February 10, 1994 letter order in Docket No. ER94-152-000. 
    Copies of North American Energy Conservation, Inc.'s informational 
    filing are on file with the Commission and are available for public 
    inspection.
    
    5. CATEX Vitol Electric Inc.
    
    [Docket No. ER94-155-001]
    
        Take notice that on May 2, 1994, CATEX Vitol Electric Inc. filed 
    certain information as required by the Commission's January 14, 1994 
    letter order in Docket No. ER94-155-000. Copies of CATEX Vitol Electric 
    Inc.'s informational filing are on file with the Commission and are 
    available for public inspection.
    
    6. Howell Power Systems, Inc.
    
    [Docket No. ER94-178-001]
    
        Take notice that on May 2, 1994, Howell Power Systems, Inc. filed 
    certain information as required by the Commission's January 14, 1994 
    letter order in Docket No. ER94-178-000. Copies of Howell Power 
    Systems, Inc.'s informational filing are on file with the Commission 
    and are available for public inspection.
    
    7. Florida Power & Light Co.
    
    [Docket No. ER94-914-000]
    
        Take notice that on May 6, 1994, Florida Power & Light Company 
    filed an amendment to the agreement for the sale of power to Tennessee 
    Valley Authority in the above-captioned docket.
        Comment date: May 31, 1994, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    8. PowerNet G.P.
    
    [Docket No. ER94-931-001]
    
        Take notice that on April 28, 1994, PowerNet G.P. filed certain 
    information as required by the Commission's April 22, 1994 letter order 
    in Docket No. ER94-931-000. Copies of PowerNet G.P.'s informational 
    filing are on file with the Commission and are available for public 
    inspection.
    
    9. Electric Clearinghouse, Inc.
    
    [Docket No. ER94-968-001]
    
        Take notice that on April 28, 1994, Electric Clearinghouse, Inc. 
    filed certain information as required by the Commission's April 7, 1994 
    letter order in Docket No. ER94-968-000. Copies of Electric 
    Clearinghouse, Inc.'s informational filing are on file with the 
    Commission and are available for public inspection.
    
    10. Virginia Electric and Power Co.
    
    [Docket No. ER94-1043-000]
    
        Take notice that Virginia Electric and Power Company (the Company) 
    on May 6, 1994 tendered for filing supplemental cost support 
    information in connection with its proposed Rate Schedule No. TFC-1, 
    Clover Transmission Facilities Charges, which is a rate schedule 
    applicable to Old Dominion Electric Cooperative.
        Copies of the filing were served upon Old Dominion and its counsel, 
    the Virginia State Corporation Commission and the North Carolina 
    Utilities Commission.
        Comment date: May 31, 1994, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    11. New England Power Co.
    
    [Docket No. ER94-1056-000]
    
        Take notice that on May 2, 1994, New England Power Company tendered 
    for filing an amendment in the above-referenced docket.
        Comment date: May 31, 1994, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    Standard Paragraphs
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 825 North Capitol Street, NE., Washington, DC 
    20426, in accordance with Rules 211 and 214 of the Commission's Rules 
    of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of this filing are on file with the 
    Commission and are available for public inspection.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 94-12522 Filed 5-20-94; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
05/23/1994
Department:
Federal Energy Regulatory Commission
Entry Type:
Uncategorized Document
Document Number:
94-12522
Dates:
May 31, 1994, in accordance with Standard Paragraph E at the end of this notice.
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: May 23, 1994, Docket No. ER92-809-003, et al.