95-12525. NorAm Gas Transmission Company; Notice of Request Under Blanket Authorization
[Federal Register Volume 60, Number 99 (Tuesday, May 23, 1995)]
[Notices]
[Page 27281]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-12525]
[[Page 27281]]
DEPARTMENT OF ENERGY
[Docket No. CP95-495-000]
NorAm Gas Transmission Company; Notice of Request Under Blanket
Authorization
May 17, 1995.
Take notice that on May 12, 1995, NorAm Gas Transmission Company
(NGT), 1600 Smith Street, Houston, Texas 77002, filed in Docket No.
CP95-495-000 a request pursuant to Secs. 157.205 and 157.211 and 216 of
the Commission's Regulations under the Natural Gas Act (18 CFR 157.205,
157.211 and 216) for authorization to abandon, replace, and relocate
certain facilities on Line 3, 4-H, and 4-14 under NGT's blanket
certificate issued in Docket No. CP82-384-000, et al., pursuant to
Section 7 of the Natural Gas Act, all as more fully set forth in the
request that is on file with the Commission and open to public
inspection.
Specifically, NGT proposes to:
(1) Abandon twenty eight 1-inch rural domestic taps on Lines 3 and
4-H and to install three taps on Line 4-1-4 at a construction cost of
$4,454;
(2) Abandon the Hunter Town Border Station on Line 3 and relocate
it on Line 4-14 at a construction cost of $28,540;
(3) Abandon and relocate the Garber Regulator Station on Line 4-A
at a construction cost of $17,673; and
(4) Abandon the Pond Creek Regulator Station on Line 4-1-4 and
replace and relocate it on Line 4-B (Extension) at a construction cost
of $14,672.
Arkla will reimburse NGT for the costs associated with the taps to
be installed on Line 4-1-4.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Sec. 157.205 of the
Regulations under the Natural Gas Act (18 CFR 157.205) a protest to the
request. If no protest is filed within the time allowed therefor, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
Lois D. Cashell,
Secretary.
[FR Doc. 95-12525 Filed 5-22-95; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 05/23/1995
- Department:
- Energy Department
- Entry Type:
- Notice
- Document Number:
- 95-12525
- Pages:
- 27281-27281 (1 pages)
- Docket Numbers:
- Docket No. CP95-495-000
- PDF File:
-
95-12525.pdf