96-12923. UtiliCorp United Inc., et al.; Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 61, Number 101 (Thursday, May 23, 1996)]
    [Notices]
    [Pages 25859-25863]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-12923]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. ER96-1725-000, et al.]
    
    
    UtiliCorp United Inc., et al.; Electric Rate and Corporate 
    Regulation Filings
    
    May 16, 1996.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. UtiliCorp United Inc.
    
    [Docket No. ER96-1725-000]
    
        Take notice that on May 3, 1996, UtiliCorp United Inc., tendered 
    for filing on behalf of its operating division, WestPlains Energy 
    Kansas, a Service Agreement under its Power Sales Tariff, FERC Electric 
    Tariff Original Volume No. 12, with Wisconsin Public Service 
    Corporation. The Service Agreement provides for the sale of capacity 
    and energy by WestPlains Energy-Kansas to Wisconsin Public Service 
    Corporation pursuant to the tariff.
        UtiliCorp also has tendered for filing a Certificate of Concurrence 
    by Wisconsin Public Service Corporation.
        UtiliCorp requests waiver of the Commission's regulations to permit 
    the Service Agreement to become effective in accordance with its terms.
        Comment date: May 30, 1996, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    2. UtiliCorp United Inc.
    
    [Docket No. ER96-1726-000]
    
        Take notice that on May 3, 1996, UtiliCorp United Inc., tendered 
    for filing on behalf of its operating division, WestPlains Energy-
    Colorado, a Service Agreement under its Power Sales Tariff, FERC 
    Electric Tariff Original Volume No. 11, with Wisconsin Public Service 
    Corporation. The Service Agreement provides for the sale of capacity 
    and energy by WestPlains Energy-Colorado to Wisconsin Public Service 
    Corporation pursuant to the tariff.
        UtiliCorp also has tendered for filing a Certificate of Concurrence 
    by Wisconsin Public Service Corporation.
        UtiliCorp requests waiver of the Commission's Regulations to permit 
    the Service Agreement to become effective in accordance with its terms.
        Comment date: May 30, 1996, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    3. UtiliCorp United Inc.
    
    [Docket No. ER96-1727-000]
    
        Take notice that on May 3, 1996, UtiliCorp United Inc., tendered 
    for filing on behalf of its operating division, Missouri Public 
    Service, a Service Agreement under its Power Sales Tariff, FERC 
    Electric Tariff Original Volume No. 10, with Wisconsin Public Service 
    Corporation. The Service Agreement provides for the sale of capacity 
    and energy by Missouri Public Service to Wisconsin Public Service 
    Corporation pursuant to the tariff.
        UtiliCorp also has tendered for filing a Certificate of Concurrence 
    by Wisconsin Public Service Corporation.
        UtiliCorp requests waiver of the Commission's Regulations to permit 
    the Service Agreement to become effective in accordance with its terms.
        Comment date: May 30, 1996, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    4. Western Resources, Inc.
    
    [Docket No. ER96-1728-000]
    
        Take notice that on May 3, 1996, Western Resources, Inc., tendered 
    for filing revised Exhibits 4A to the Transmission Agreement with 
    Kansas Gas and Electric Company, WestPlains Energy, a division of 
    UtiliCorp United, Inc., and Missouri Public Service, a division of 
    UtiliCorp United, Inc. Western Resources states that the revised 
    exhibits reflect updated loss amounts associated with transmission 
    services rendered to each party with respect to each party's ownership 
    in the Jeffrey Energy Center under various load conditions. Western 
    Resources has requested that the revised exhibits become effective on 
    June 1, 1996.
        Copies of the filing were served upon Kansas Gas and Electric 
    Company, WestPlains Energy, a division of UtiliCorp United, Inc., 
    Missouri Public Services, a division of UtiliCorp United, Inc., and the 
    State Corporation Commission of the State of Kansas.
        Comment date: May 30, 1996, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    [[Page 25860]]
    
    5. Milford Power Limited Partnership
    
    [Docket No. ER96-1729-000]
    
        Take notice that on May 3, 1996, Milford Power Limited Partnership 
    submitted for filing under Sec. 205 of the Federal Power Act (16 U.S.C. 
    824d) and Part 35 of the Commission's Regulations (18 CFR Part 35) an 
    Amended and Restated Power Purchase Agreement between New England Power 
    Company and Milford Power Limited Partnership (Exhibit A) and certain 
    earlier amendments to that Power Purchase Agreement. Copies of the 
    filing have been served on the Massachusetts Department of Public 
    Utilities and New England Power Company.
        Comment date: May 30, 1996, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    6. Houston Lighting & Power Company
    
    [Docket No. ER96-1730-000]
    
        Take notice that on May 3, 1996, Houston Lighting & Power Company 
    (HL&P), tendered for filing executed transmission service agreements 
    (TSAs) under HL&P's FERC Electric Tariff, Original Volume No. 1, for 
    Transmission Service To, From and Over Certain HVDC Interconnections. 
    The filing consists of economy energy and emergency power TSAs with (1) 
    Koch Power Services, Inc. (Koch) and (2) Federal Energy Sales, Inc. 
    (FES) providing for the transmission of energy to be scheduled over the 
    East HVDC Interconnection. HL&P has requested an effective date of May 
    3, 1996.
        Copies of the filing were served on Koch, FES and the Public 
    Utility Commission of Texas.
        Comment date: May 30, 1996, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    7. Engineered Energy Systems Corporation
    
    [Docket No. ER96-1731-000]
    
        Take notice that on May 6, 1996, Engineered Energy Systems 
    Corporation (EESCOR), petitioned the Commission for (1) blanket 
    authorization to sell electricity at market-based rates; (2) a 
    disclaimer of jurisdiction over EESCOR's power brokering activities; 
    (3) acceptance of EESCOR's Rate Schedule FERC No. 1; (4) waiver of 
    certain Commission Regulations; and (5) such other waivers and 
    authorizations as have been granted to other power marketers, all as 
    more fully set forth in EESCOR's petition on file with the Commission.
        EESCOR states that it intends to engage in electric power 
    transactions as a broker and as a marketer. In transactions where 
    EESCOR acts as a marketer, it proposes to make such sales on rates, 
    terms and conditions to be mutually agreed to with purchasing parties.
        Comment date: May 30, 1996, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    8. MidAmerican Energy Company
    
    [Docket No. ER96-1732-000]
    
        Take notice that on May 6, 1996, MidAmerican Energy Company 
    (MidAmerican), 106 East Second Street, Davenport, Iowa 52801, filed 
    with the Commission Firm Transmission Service Agreements with Utilicorp 
    United Inc. (Utilicorp) dated April 5, 1996, Western Power Services, 
    Inc. (Western Power) dated April 22, 1996, and Illinova Power 
    Marketing, Inc. (Illinova) dated April 26, 1996, and Non-Firm 
    Transmission Service Agreements with Utilicorp dated April 5, 1996, 
    Western Power dated April 22, 1996, and Illinova dated April 26, 1996, 
    entered into pursuant to MidAmerican's Point-to-Point Transmission 
    Service Tariff, FERC Electric Tariff, Original Volume No. 4.
        MidAmerican requests an effective date of April 5, 1996 for the 
    Agreements with Utilicorp, April 22, 1996 for the Agreements with 
    Western Power, and April 26, 1996 for the Agreements with Illinova, and 
    accordingly seeks a waiver of the Commission's notice requirement. 
    MidAmerican has served a copy of the filing on Utilicorp, Western 
    Power, Illinova, the Iowa Utilities Board, the Illinois Commerce 
    Commission and the South Dakota Public Utilities Commission.
        Comment date: May 30, 1996, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    9. Wisconsin Power and Light Company
    
    [Docket No. ER96-1733-000]
    
        Take notice that on May 6, 1996, Wisconsin Power and Light Company 
    (WP&L), tendered for filing a Joint Operating and Maintenance Agreement 
    between itself and Madison Gas and Electric Company (MG&E).
        The Agreement documents the procedures for constructing, operating, 
    and maintaining transmission and distribution facilities in Dane 
    County. The parties request an effective date of February 14, 1996 and 
    accordingly seek waiver of the Commission's notice requirements.
        Copies of this filing have been served upon MG&E and the Public 
    Service Commission of Wisconsin.
        Comment date: May 30, 1996, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    10. Public Service Company of Colorado
    
    [Docket No. ER96-1734-000]
    
        Take notice that on May 6, 1996, Public Service Company of Colorado 
    (Public Service), tendered for filing a Letter Agreement to its Power 
    Supply Agreement (PSA) with Holy Cross Electric Association, Inc. (Holy 
    Cross) designated as Public Service Rate Schedule FERC No. 52. This 
    Letter Agreement allows Public Service and Holy Cross to use the loss 
    percentage specified in Schedule 2 of the Network Transmission Service 
    Tariff designated as Public Service's FERC Electric Tariff, Original 
    Volume No. 4. Public Service requests that this filing be made 
    effective January 1, 1996.
        Copies of the filing were served upon Holy Cross Electric 
    Association, Inc., the Colorado Public Utilities Commission, and the 
    Colorado Office of Consumer Counsel.
        Comment date: May 30, 1996, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    11. GDK Corporation
    
    [Docket No. ER96-1735-000]
    
        Take notice that on May 6, 1996, GDK Corporation (GDK), tendered 
    for filing, pursuant to Rule 207 of the Commission's Rules and 
    Regulations, 18 CFR 385.207, a Petition for Order Approving Rate 
    Schedule and Granting Waivers. GDK requests that its proposed FERC Rate 
    Schedule No. 1 be made effective July 1, 1996.
        The proposed rate schedule would allow GDK to charge market-based 
    rates for the sales it intends to make to purchasers for resale. GDK 
    also asks the Commission to waive certain of its regulatory and 
    reporting requirements.
        Comment date: May 30, 1996, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    12. Kansas City Power & Light Company
    
    [Docket No. ER96-1736-000]
    
        Take notice that on May 6, 1996, Kansas City Power & Light Company 
    (KCPL), tendered for filing Amendatory Agreement No. 2 to Wholesale 
    Firm Power Agreement between KCPL and the Missouri Public Service, a 
    division of Utilicorp United, Inc., dated April 22, 1996, and 
    associated Service Schedule. KCPL states that the Amendatory Agreement 
    revises the Agreement pursuant to KCPL's Open Season.
        KCPL request waiver of the Commission's notice requirements.
        Comment date: May 30, 1996, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    [[Page 25861]]
    
    13. South Carolina Electric & Gas Company
    
    [Docket No. ER96-1737-000]
    
        Take notice that on May 6, 1996, South Carolina Electric & Gas 
    Company, tendered for filing proposed Contract for Purchases and Sales 
    of Power and Energy between South Carolina Electric & Gas Company and 
    NORAM Energy Services, Inc. (NORAM).
        Under the proposed contract, the parties will purchase and sell 
    electric energy and power between themselves. South Carolina Electric & 
    Gas Company also requested waiver of notice in order that the contract 
    be effective on May 15, 1996.
        Copies of this filing were served upon NORAM Energy Services, Inc.
        Comment date: May 30, 1996, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    14. Northeast Utilities Service Company
    
    [Docket No. ER96-1738-000]
    
        Take notice that on May 6, 1996, Northeast Utilities Service 
    Company (NU), on behalf of Public Service Company of New Hampshire 
    (PSNH) and the other Northeast Utilities system operating companies (NU 
    System Companies), tendered for filing with the Federal Energy 
    Regulatory Commission rate schedules in connection with a two-year 
    program initiated by the New Hampshire Public Utilities Commission 
    (NHPUC), known as the New Hampshire Retail Competition Pilot Program.
        NUSCO requests an effective date for the rate schedules of May 28, 
    1996, or such other later date that is consistent with Section 11 of a 
    Joint Recommendation between PSNH and the Staff of the NHPUC. NUSCO 
    requests that the Commission waive the 60-day notice requirement in 
    Sec. 205 of the Federal Power Act as necessary to permit these rate 
    schedules to be placed into effect on such date.
        Comment date: May 30, 1996, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    15. Cinergy Services, Inc.
    
    [Docket No. ER96-1739-000]
    
        Take notice that on May 6, 1996, Cinergy Services, Inc. (Cinergy), 
    tendered for filing on behalf of its operating companies, The 
    Cincinnati Gas & Electric Company (CG&E) and PSI Energy, Inc. (PSI), an 
    Interchange Agreement, dated April 1, 1996 between Cinergy, CG&E, PSI 
    and Eastex Power Marketing, Inc. (EPMI).
        The Interchange Agreement provides for the following service 
    between Cinergy and EPMI:
    
    1. Exhibit A--Power Sales by EPMI
    2. Exhibit B--Power Sales by Cinergy
    
        Cinergy and EPMI have requested an effective date of May 13, 1996.
        Copies of the filing were served on Eastex Power Marketing, Inc., 
    the Texas Public Utility Commission, the Kentucky Public Service 
    Commission, the Public Utilities Commission of Ohio and the Indiana 
    Utility Regulatory Commission.
        Comment date: May 30, 1996, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    16. Cinergy Services, Inc.
    
    [Docket No. ER96-1740-000]
    
        Take notice that on May 7, 1996, Cinergy Services, Inc. (Cinergy), 
    tendered for filing on behalf of its operating companies, The 
    Cincinnati Gas & Electric Company (CG&E) and PSI Energy, Inc. (PSI), an 
    Interchange Agreement, dated April 15, 1996 between Cinergy, CG&E, PSI 
    and DuPont Power Marketing, Inc. (DuPont).
        The Interchange Agreement provides for the following service 
    between Cinergy and DuPont:
    
    1. Exhibit A--Power Sales by DuPont
    2. Exhibit B--Power Sales by Cinergy
    
        Cinergy and DuPont have requested an effective date of May 13, 
    1996.
        Copies of the filing were served on DuPont Power Marketing, Inc., 
    the Texas Public Utility Commission, the Kentucky Public Service 
    Commission, the Public Utilities Commission of Ohio and the Indiana 
    Utility Regulatory Commission.
        Comment date: May 30, 1996, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    17. Montaup Electric Company
    
    [Docket No. ER96-1741-000]
    
        Take notice that on May 7, 1996, Montaup Electric Company 
    (Montaup), filed (1) an Exhibit A for Montaup's transmission of a 
    short-term energy purchase by Taunton Municipal Lighting Plant 
    (Taunton) from Central Vermont Public Service Corporation and (2) 
    Notices of Cancellation of service agreements under Original Volume No. 
    2 which have expired by their terms.
        The Taunton transaction became effective on March 16, 1996 and 
    terminated on March 31, 1996. The Exhibit A was filed pursuant to 
    Montaup's service agreement with Taunton under Montaup's FERC Electric 
    Tariff, Original Volume No. 2.
        Montaup requests waiver of the 60-day notice requirement so that 
    the Exhibit A may be allowed to become effective March 16, 1996. 
    Montaup seeks such waiver on the ground that the filing provides for 
    terms and conditions of a transaction pursuant to a service agreement.
        Montaup requests that the Notices of Cancellation by allowed to 
    become effective upon the expiration dates of the agreements stated in 
    the Notices. Future service is available under Montaup's open access 
    tariffs which became effective April 21, 1996.
        Comment date: May 30, 1996, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    18. Long Island Lighting Company
    
    [Docket No. ER96-1743-000]
    
        Take notice that on May 7, 1996, Long Island Lighting Company 
    (LILCO), tendered for filing service agreements entered into as of the 
    following dates by LILCO and the following parties:
    
    ------------------------------------------------------------------------
                      Date                              Purchaser           
    ------------------------------------------------------------------------
    2/8/96.................................  Enron Power Marketing, Inc.    
    2/13/96................................  Coastal Electric Services      
                                              Company                       
    2/13/96................................  New York Power Authority       
    2/23/96................................  CNG Power Services Corporation 
    2/23/96................................  PECO Energy Company--Power Team
    2/23/96................................  Phibro, Inc.                   
    2/23/96................................  KCS Power Marketing, Inc.      
    2/29/96................................  Sonat Power Marketing Inc.     
    3/4/96.................................  Aquila Power Corporation       
    3/4/96.................................  Maine Public Service Company   
    3/26/96................................  LG&E Power Marketing Inc.      
    3/27/96................................  Rainbow Energy Marketing       
                                              Corporation                   
    3/28/96................................  KN Marketing, Inc.             
    4/10/96................................  Village of Greenport           
    4/19/96................................  Inc. Village of Rockville      
                                              Centre                        
    5/1/96.................................  Vitol Gas & Electric LLC       
    ------------------------------------------------------------------------
    
        These service agreements supplement a Power Sales umbrella tariff 
    accepted for filing on April 4, 1996 and made effective August 11, 1995 
    by the Commission in Docket No. ER95-1518-000.
        In accordance with the policy set forth in Prior Notice and Filing 
    Requirements Under Part II of the Federal Power Act, 64 FERC para. 
    61,081 (1993), LILCO requests the Commission to make the Agreements 
    effective as of April 10, 1996, because service will be provided under 
    an umbrella tariff and each service agreement is filed within 30 days 
    after the commencement of service. In accordance with 18 CFR 35.11, 
    LILCO has requested waiver of the sixty-day notice period in 18 CFR 
    35.2(e).
        A copy of this filing was provided to the customers involved and to 
    the New York State Public Service Commission.
        Comment date: May 30, 1996, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    [[Page 25862]]
    
    19. Indeck Pepperell Power Associates, Inc.
    
    [Docket No. ER96-1744-000]
    
        Take notice that on May 7, 1996, Indeck Pepperell Power Associates, 
    Inc. (Indeck Pepperell) submitted for filing an Amendment (Amendment) 
    to the April 17, 1996 Short-Term Power Purchase Contract between New 
    England Power Company (NEP) and Indeck Pepperell.
        Indeck Pepperell states that its filing is in accordance with Part 
    35 of the Commission's regulations. Indeck Pepperell requests a waiver 
    of the Commission's notice requirements so that the Amendment may 
    become effective on May 8, 1996.
        Comment date: May 30, 1996, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    20. Allegheny Power Service Corporation, on behalf of Monongahela Power 
    Company, The Potomac Edison Company and West Penn Power Company 
    (Allegheny Power)
    
    [Docket No. ER96-1745-000]
    
        Take notice that on May 8, 1996, Allegheny Power Service 
    Corporation on behalf of Monongahela Power Company, The Potomac Edison 
    Company and West Penn Power Company (Allegheny Power) filed Supplement 
    No. 10 to add two (2) new Customers to the Standard Generation Service 
    Rate Schedule under which Allegheny Power offers standard generation 
    and emergency service on an hourly, daily, weekly, monthly or yearly 
    basis. Allegheny Power requests a waiver of notice requirements to make 
    service available as of May 1, 1996 to The Cleveland Electric 
    Illuminating Company and Toledo Edison Company.
        Copies of the filing have been provided to the Public Utilities 
    Commission of Ohio, the Pennsylvania Public Utility Commission, the 
    Maryland Public Service Commission, the Virginia State Corporation 
    Commission, the West Virginia Public Service Commission, and all 
    parties of record.
        Comment date: May 30, 1996, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    21. Allegheny Power Service Corporation, on behalf of Monongahela Power 
    Company The Potomac Edison Company, and West Penn Power Company 
    (Allegheny Power)
    
    [Docket No. ER96-1746-000]
    
        Take notice that on May 8, 1996, Allegheny Power Service 
    Corporation on behalf of Monongahela Power Company, The Potomac Edison 
    Company and West Penn Power Company (Allegheny Power), filed Service 
    Agreements to add Federal Energy Sales, Inc. and IGM, Inc. as Customers 
    under Allegheny Power's Point-to-Point Transmission Service Tariff 
    which has been accepted for filing by the Federal Energy Regulatory 
    Commission. Allegheny Power proposes to make service available to 
    Federal Energy Sales, Inc. and IGM, Inc. as of May 1, 1996.
        Copies of the filing have been provided to the Public Utilities 
    Commission of Ohio, the Pennsylvania Public Utility Commission, the 
    Maryland Public Service Commission, the Virginia State Corporation 
    Commission, and the West Virginia Public Service Commission.
        Comment date: May 30, 1996, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    22. New England Power Pool
    
    [Docket No. ER96-1747-000]
    
        Take notice that on May 8, 1996, the New England Power Pool 
    Executive Committee filed a signature page to the NEPOOL Agreement 
    dated September 1, 1971, as amended, signed by ANP Energy Direct 
    company (ANP), Multi-Energies U.S.A., Inc. (Multi-Energies) and Working 
    Assets Funding Service, Inc. (Working Assets). The New England Power 
    Pool Agreement, as amended, has been designated NEPOOL FPC No. 2.
        The Executive Committee states that acceptance of the signature 
    pages would permit ANP, Multi-Energies and Working Assets to join the 
    approximately 80 Participants that already participate in the Pool. 
    NEPOOL further states that the filed signature pages do not change the 
    NEPOOL Agreement in any manner, other than to make ANP, Multi-Energies 
    and Working Assets Participants in the Pool. NEPOOL requests an 
    effective date on or before May 28, 1996 for commencement of 
    participation in the Pool by ANP, Multi-Energies and Working Assets.
        Comment date: May 30, 1996, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    23. Portland General Electric Company
    
    [Docket No. ER96-1750-000]
    
        Take notice that on May 7, 1996, Portland General Electric Company 
    (PGE), tendered for filing under FERC Electric Tariff, Original Volume 
    No. 5, an executed Service Agreement between PGE and Eugene Water & 
    Electric Board.
        Pursuant to 18 CFR 35.11 and the Commission's order issued July 30, 
    1995 (Docket NO. PL93-2-002), PGE respectfully requests the Commission 
    grant a waiver of the notice requirements of 18 CFR 35.3 to allow the 
    executed Service Agreement to become effective April 9, 1996.
        Copies of this filing were served upon Eugene Water & Electric 
    Board.
        Comment date: May 30, 1996, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    24. Illinois Power Company
    
    [Docket No. ER96-1751-000]
    
        Take notice that on May 8, 1996, Illinois Power Company (Illinois 
    Power), 500 South 27th Street, Decatur, Illinois 62526, tendered for 
    filing firm transmission agreements under which Bridgestone Firestone, 
    Inc. will take transmission service pursuant to its open access 
    transmission tariff. The agreements are based on the Form of Service 
    Agreement in Illinois Power's tariff.
        Illinois Power has requested an effective date of May 1, 1996.
        Comment date: May 30, 1996, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    25. Illinois Power Company
    
    [Docket No. ER96-1752-000]
    
        Take notice that on May 8, 1996, Illinois Power Company (Illinois 
    Power), 500 South 27th Street, Decatur, Illinois 62526, tendered for 
    filing firm transmission agreements under which Caterpillar, Inc. will 
    take transmission service pursuant to its open access transmission 
    tariff. The agreements are based on the Form of Service Agreement in 
    Illinois Power's tariff.
        Illinois Power has requested an effective date of May 1, 1996.
        Comment date: May 30, 1996, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    26. Consolidated Edison Company of New York, Inc.
    
    [Docket No. ER96-1753-000]
    
        Take notice that on May 8, 1996, Consolidated Edison Company of New 
    York, Inc. (Con Edison), tendered for filing an agreement with KCS 
    Power Marketing, Inc. (KCS) to provide for the sale of energy and 
    capacity. For energy the ceiling rate is 100 percent of the incremental 
    energy cost plus up to 10 percent of the SIC (where such 10 percent is 
    limited to 1 mill per KWhr when the SIC in the hour reflects a 
    purchased power resource). The ceiling rate for capacity is $7.70 per 
    megawatt hour. Energy and capacity sold by KCS will be at market-based 
    rates.
        Con Edison states that a copy of this filing has been served by 
    mail upon KCS.
    
    [[Page 25863]]
    
        Comment date: May 30, 1996, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    27. Duke Power Company
    
    [Docket No. ER96-1755-000]
    
        Take notice that on May 8, 1996, Duke Power Company (Duke), 
    tendered for filing a Schedule MR Transaction Sheet under Service 
    Agreement No. 3 of Duke's FERC Electric Tariff, Original Volume No. 3.
        Comment date: May 30, 1996, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    28. Duke Power Company
    
    [Docket No. ER96-1756-000]
    
        Take notice that on May 8, 1996, Duke Power Company (Duke), 
    tendered for filing a Schedule MR Transaction Sheet supplementing the 
    Service Agreement for Market Rate (Schedule MR) Sales between Duke and 
    Entergy Services, Inc. under Duke's FERC Electric Tariff, Original 
    Volume No. 3.
        Comment date: May 30, 1996, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    29. Duke Power Company
    
    [Docket No. ER96-1757-000]
    
        Take notice that on May 8, 1996, Duke Power Company (Duke), 
    tendered for filing a Service Agreement for Market Rate (Schedule MR) 
    Sales between Duke and LG&E Power Marketing Inc. and a Schedule MR 
    Transaction Sheet thereunder.
        Comment date: May 30, 1996, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    30. Duke Power Company
    
    [Docket No. ER96-1758-000]
    
        Take notice that on May 8, 1996, Duke Power Company (Duke), 
    tendered for filing a Schedule MR Transaction Agreement and Transaction 
    Sheet under Service Agreement No. 4 of Duke's FERC Electric Tariff, 
    Original Volume No. 3.
        Comment date: May 30, 1996, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    31. NRG Generating (Parlin) Cogeneration Inc.
    
    [Docket No. ES96-27-000]
    
        Take notice that on May 9, 1996, NRG Generation (Parlin) 
    Cogeneration Inc. filed an application, under Sec. 204 of the Federal 
    Power Act, seeking authorization to issue a term note in an aggregate 
    principal amount not to exceed $155 million and debt service line of 
    credit notes in an aggregate principal amount not to exceed $5 million 
    at any one time outstanding. The final maturity would be fifteen (15) 
    years from the date of initial issuance of the term note.
        Comment date: June 4, 1996, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    Standard Paragraph
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426, 
    in accordance with Rules 211 and 214 of the Commission's Rules of 
    Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of this filing are on file with the 
    Commission and are available for public inspection.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 96-12923 Filed 5-22-96; 8:45 am]
    BILLING CODE 6717-01-P
    
    

Document Information

Published:
05/23/1996
Department:
Energy Department
Entry Type:
Notice
Document Number:
96-12923
Dates:
May 30, 1996, in accordance with Standard Paragraph E at the end of this notice.
Pages:
25859-25863 (5 pages)
Docket Numbers:
Docket No. ER96-1725-000, et al.
PDF File:
96-12923.pdf