96-12973. Summary of Decisions Granting in Whole or in Part Petitions for Modification  

  • [Federal Register Volume 61, Number 101 (Thursday, May 23, 1996)]
    [Notices]
    [Pages 25913-25918]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-12973]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF LABOR
    Mine Safety and Health Administration
    
    
    Summary of Decisions Granting in Whole or in Part Petitions for 
    Modification
    
    AGENCY: Mine Safety and Health Administration (MSHA), Labor.
    
    ACTION: Notice of affirmative decisions issued by the Administrators 
    for Coal Mine Safety and Health and Metal and Nonmetal Mine Safety and 
    Health on petitions for modification of the application of mandatory 
    safety standards.
    
    -----------------------------------------------------------------------
    
    SUMMARY: Under section 101(c) of the Federal Mine Safety and Health Act 
    of 1977, the Secretary of Labor may modify the application of a 
    mandatory safety standard to a mine if the Secretary determines either 
    that an alternate method exists at a specific mine that will guarantee 
    no less protection for the miners affected than that provided by the 
    standard, or that the application of the standard at a specific mine 
    will result in a diminution of safety to the affected miners.
        Summaries of petitions received by the Secretary appear 
    periodically in the Federal Register. Final decisions on these 
    petitions are based upon the petitioner's statements, comments and 
    information submitted by interested persons, and a field investigation 
    of the conditions at the mine. MSHA has granted or partially granted 
    the requests for modification submitted by the petitioners listed 
    below. In some instances, the decisions are conditioned upon compliance 
    with stipulations stated in the decision.
    
    FOR FURTHER INFORMATION CONTACT: Petitions and copies of the final 
    decisions are available for examination by the public in the Office of 
    Standards, Regulations, and Variances, MSHA, Room 627, 4015 Wilson 
    Boulevard, Arlington, Virginia 22203. Contact Barbara Barron at 703-
    235-1910.
        Dated: May 14, 1996.
    Patricia W. Silvey,
    Director, Office of Standards, Regulations and Variances.
    
    Affirmative Decisions on Petitions for Modification
    
        Docket No.: M-93-024-C.
        FR Notice: 58 FR 13805.
        Petitioner: Peabody Coal Company.
        Reg Affected: 30 CFR 77.900.
        Summary of Findings: Petitioner's proposal to use a magnetic motor 
    starter instead of tripping a circuit breaker for ground phase 
    protection and undervoltage protection, use a circuit breaker for short 
    circuit protection, and use the magnetic motor starter and circuit 
    breaker for overload protection for serving portable or mobile phase 
    alternating current equipment considered acceptable alternative method. 
    Granted Hawthorn Mine with conditions.
    
        Docket No.: M-93-087-C.
        FR Notice: 58 FR 39236.
        Petitioner: Neumeister Coal Company.
        Reg Affected: 30 CFR 75.360(b)(5).
        Summary of Findings: Petitioner's proposal to examine each seal for 
    physical damage from the slope gunboat during the preshift examination 
    after an air quantity reading is taken in by the intake portal, to test 
    for the quantity and quality of air at the intake air split locations 
    off the slope in the gangway portion of the working section and 
    physically examine the entire length of the slope once a month 
    considered acceptable alternative method. Granted for No. 2 Slope Mine 
    with conditions for examinations of seals in the intake air haulage 
    slope of this mine.
    
        Docket No.: M-93-089-C.
        FR Notice: 58 FR 39236.
        Petitioner: Neumeister Coal Company.
        Reg Affected: 30 CFR 75.1002-1(a).
        Summary of Findings: Petitioner's proposal to use nonpermissible 
    electric equipment within 150 feet of the pillar line and to suspend 
    equipment operation anytime the methane concentration at the equipment 
    reaches 0.25 percent, either during operation or a preshift examination 
    considered acceptable alternative method. Granted for No. 2 Slope Mine 
    with conditions for the use of nonpermissible electric drags and 
    associated nonpermissible electric components located within 150 feet 
    from pillar workings.
    
        Docket No.: M-93-090-C.
        FR Notice: 58 FR 39236.
        Petitioner: Neumeister Coal Company.
        Reg Affected: 30 CFR 75.1100-2(a)(2).
        Summary of Findings: Petitioner's proposal to use only portable 
    fire extinguishers to replace existing requirements where rock dust, 
    water cars, and other water storage are not practical considered 
    acceptable alternative method. Granted for No. 2 Slope Mine with 
    conditions for firefighting equipment in the working section.
    
        Docket No.: M-93-091-C.
        FR Notice: 58 FR 39236.
        Petitioner: Neumeister Coal Company.
        Reg Affected: 30 CFR 75.1200 (d), (h), and (i).
        Summary of Findings: Petitioner's proposal to use cross-sections 
    instead of contour lines through the intake slope, at locations of rock 
    tunnel connections between veins, and at 1,000 feet intervals of 
    advance from the intake slope and to limit the mapping of mine workings 
    above and below to those present within 100 feet of the vein being 
    mined except when veins are interconnected to other veins beyond the 
    100 feet limit through rock tunnels considered acceptable alternative 
    method. Granted for No. 2 Slope Mine with conditions for the use of 
    cross-sections, in lieu of contour lines, limiting the mapping of mines 
    above or below this mine to those within 100 feet of the vein being 
    mined.
    
        Docket No.: M-93-092-C.
        FR Notice: 58 FR 39236.
        Petitioner: Neumeister Coal Company.
        Reg Affected: 30 CFR 75.1202-1(a).
        Summary of Findings: Petitioner's proposal to revise and supplement 
    mine maps on an annual basis instead of the required 6 month interval 
    and to update maps daily by hand notations considered acceptable 
    alternative method. Granted for No. 2 Slope Mine with conditions for 
    annual revisions and supplements of the mine map.
    
        Docket No.: M-93-099-C.
        FR Notice: 58 FR 39237.
        Petitioner: E & E Fuels Coal Company.
        Reg Affected: 30 CFR 75.1100-2(a)(2).
        Summary of Findings: Petitioner's proposal to use only portable 
    fire extinguishers to replace existing requirements where rock dust, 
    water cars, and other water storage are not practical considered 
    acceptable alternative method. Granted for Orchard Slope Mine with 
    conditions for firefighting equipment in the working section.
    
        Docket No.: M-93-100-C.
        FR Notice: 58 FR 39237.
        Petitioner: E & E Fuels Coal Company.
        Reg Affected: 30 CFR 75.1200 (d), (h), and (i).
        Summary of Findings: Petitioner's proposal to use cross-sections 
    instead of contour lines through the intake slope, at locations of rock 
    tunnel connections between veins, and at 1,000 feet
    
    [[Page 25914]]
    
    intervals of advance from the intake slope and to limit the mapping of 
    mine workings above and below to those present within 100 feet of the 
    vein being mined except when veins are interconnected to other veins 
    beyond the 100 feet limit through rock tunnels considered acceptable 
    alternative method. Granted for Orchard Slope Mine with conditions for 
    the use of cross-sections, in lieu of contour lines, limiting the 
    mapping of mines above or below this mine to those within 100 feet of 
    the vein being mined.
    
        Docket No.: M-93-101-C.
        FR Notice: 58 FR 39237.
        Petitioner: E & E Fuels Coal Company.
        Reg Affected: 30 CFR 75.1202-1(a).
        Summary of Findings: Petitioner's proposal to revise and supplement 
    mine maps on an annual basis instead of the required 6 month interval 
    and to update maps daily by hand notations considered acceptable 
    alternative method. Granted for Orchard Slope Mine with conditions for 
    annual revisions and supplements of the mine maps.
    
        Docket No.: M-93-109-C.
        FR Notice: 58 FR 39238.
        Petitioner: Wenrich Coal Company.
        Reg Affected: 30 CFR 75.360(b)(5).
        Summary of Findings: Petitioner's proposal to examine each seal for 
    physical damage from the slope gunboat during the preshift examination 
    after an air quantity reading is taken in by the intake portal, to test 
    for the quantity and quality of air at the intake air split locations 
    off the slop in the gangway portion of the working section, and to 
    physically examine the entire length of the slope once a month 
    considered acceptable alternative method. Granted for Buck Mountain 
    Slope Mine with conditions for examinations of seals in the intake air 
    haulage slope of this mine.
    
        Docket No.: M-93-111-C.
        FR Notice: 58 FR 39238.
        Petitioner: Wenrich Coal Company.
        Reg Affected: 30 CFR 75.1100-2(a)(2).
        Summary of Findings: Petitioner's proposal to use only portable 
    fire extinguishers to replace existing requirements where rock dust, 
    water cars, and other water storage are not practical considered 
    acceptable alternative method. Granted for Buck Mountain Slope Mine 
    with conditions for firefighting equipment in the working section.
    
        Docket No.: M-93-119-C.
        FR Notice: 58 FR 39239.
        Petitioner: R. and D. Coal Company.
        Reg Affected: 30 CFR 75.1200 (d), (h), and (i).
        Summary of Findings: Petitioner's proposal to use cross sections 
    instead of contour lines through the intake slope, at locations of rock 
    tunnel connections between veins, and at 1,000 feet intervals of 
    advance from the intake slope and to limit the mapping of mine workings 
    above and below to those present within 100 feet of the vein being 
    mined except when veins are interconnected to other veins beyond the 
    100 feet limit through rock tunnels considered acceptable alternative 
    method. Granted for Buck Mountain Slope Mine with conditions for the 
    use of cross-sections, in lieu of contour lines, limiting the mapping 
    of miner above or below this mine to those within 100 feet of the vein 
    being mined.
    
        Docket No.: M-93-120-C.
        FR Notice: 58 FR 39239.
        Petitioner: R. and D. Coal Company.
        Reg Affected: 30 CFR 1202-1(a).
        Summary of Findings: Petitioner's proposal to revise and supplement 
    mine maps on an annual basis instead of the required 6 month interval 
    and to update maps daily by hand notations considered acceptable 
    alternative method. Granted for Buck Mountain Slope Mine with 
    conditions for annual revisions and supplements of the mine map.
    
        Docket No.: M-93-124-C.
        FR Notice: 58 FR 39240.
        Petitioner: Kintzel Coal Company.
        Reg Affected: 30 CFR 75.360(b)(5).
        Summary of Findings: Petitioner's proposal to examine each seal for 
    physical damage from the slope gunboat during the preshift examination 
    after an air quantity reading is taken inby the intake portal, to test 
    for the quantity and quality of air at the intake air split locations 
    off the slope in the gangway portion of the working section, and to 
    physically examine the entire length of the slope once a month 
    considered acceptable alternative method. Granted for Lykens No. 6 Mine 
    with conditions for examinations of seals in the intake air haulage 
    slope of this mine.
    
        Docket No.: M-93-127-C.
        FR Notice: 58 FR 39240.
        Petitioner: Kintzel Coal Company.
        Reg Affected: 30 CFR 75.1100-2(a)(2).
        Summary of Findings: Petitioner's proposal to use only portable 
    fire extinguishers to replace existing requirements where rock dust, 
    water cars, and other water storage are not practical considered 
    acceptable alternative method. Granted for Lykens No. 6 Mine with 
    conditions for firefighting equipment in the working section.
    
        Docket No.: M-93-128-C.
        FR Notice: 58 FR 39240
        Petitioner: Kintzel Coal Company.
        Reg Affected: 30 CFR 75.1200 (d), (h), and (i).
        Summary of Findings: Petitioner's proposal to use cross-sections 
    instead of contour lines through the intake slope, at locations of rock 
    tunnel connections between veins, and at 1,000 feet intervals of 
    advance from the intake slope and to limit the mapping of mine workings 
    above and below to those present within 100 feet of the vein being 
    mined except when veins are interconnected to other veins beyond the 
    100 feet limit through rock tunnels considered acceptable alternative 
    method. Granted for Lykens No. 6 Mine with conditions for the use of 
    cross-sections, in lieu of contour lines, limiting the mapping of mines 
    above or below this mine to those within 100 feet of the vein being 
    mined.
    
        Docket No.: M-93-129-C.
        FR Notice: 58 FR 39240.
        Petitioner: Kintzel Coal Company.
        Reg Affected: 30 CFR 75.1202-1(a).
        Summary of Findings: Petitioner's proposal to revise and supplement 
    mine maps on an annual basis instead of the required 6 month interval 
    and to update maps daily by hand notations considered acceptable 
    alternative method. Granted for Lykens No. 6 Mine with conditions for 
    annual revisions and supplements of the mine map.
    
        Docket No.: M-93-134-C.
        FR Notice: 58 FR 39241.
        Petitioner: M & S Coal Company.
        Reg Affected: 30 CFR 75.1002-1(a).
        Summary of Findings: Petitioner's proposal to use nonpermissible 
    electric equipment within 150 feet of the pillar line and to suspend 
    equipment operation anytime the methane concentration at the equipment 
    reaches 0.25 percent, either during operation or a preshift examination 
    considered acceptable alternative method. Granted for Buck Mountain 
    Slope Mine with conditions for the use of nonpermissible electric drags 
    and associated nonpermissible electric components located within 150 
    feet from pillar workings.
    
        Docket No.: M-93-135-C.
        FR Notice: 58 FR 39241.
        Petitioner: M & S Coal Company.
        Reg Affected: 30 CFR 75.1100-2(a)(2).
        Summary of Findings: Petitioner's proposal to use only portable 
    fire extinguishers to replace existing requirements where rock dust, 
    water cars, and other water storage are not practical considered 
    acceptable alternative method. Granted for Buck Mountain Slope Mine 
    with conditions for firefighting equipment in the working section.
    
        Docket No.: M-93-136-C.
        FR Notice: 58 FR 39241.
        Petitioner: M & S Coal Company.
    
    [[Page 25915]]
    
        Reg Affected: 30 CFR 75.1200 (d), (h), and (i).
        Summary of Findings: Petitioner's proposal to use cross-sections 
    instead of contour lines through the intake slope, at locations of rock 
    tunnel connections between veins, and at 1,000 feet intervals of 
    advance from the intake slope and to limit the mapping of mine workings 
    above and below to those present within 100 feet of the vein being 
    mined except when veins are interconnected to other veins beyond the 
    100 feet limit through rock tunnels considered acceptable alternative 
    method. Granted for Buck Mountain Slope Mine with conditions for the 
    use of cross-sections, in lieu of contour lines, limiting the mapping 
    of mines above or below this mine to those within 100 feet of the vein 
    being mined.
    
        Docket No.: M-93-138-C.
        FR Notice: 58 FR 39241.
        Petitioner: Jeff Coal Company.
        Reg Affected: 30 CFR 75.1002-1(a).
        Summary of Findings: Petitioner's proposal to use nonpermissible 
    electric equipment within 150 feet of the pillar line and to suspend 
    equipment operation anytime the methane concentration at the equipment 
    reaches 0.25 percent, either during operation or a preshift examination 
    considered acceptable alternative method. Granted for Tracy Vein Slope 
    Mine with conditions for use of nonpermissible battery-powered 
    locomotives located within 150 feet from pillar workings.
    
        Docket No.: M-93-139-C.
        FR Notice: 58 FR 39241.
        Petitioner: Jeff Coal Company.
        Reg Affected: 30 CFR 75.1100-2(a)(2).
        Summary of Findings: Petitioner's proposal to use only portable 
    fire extinguishers where rock dust, water cars, and other water storage 
    are not practical considered acceptable alternative method. Granted for 
    Tracy Vein Slope Mine with conditions for firefighting equipment in the 
    working section.
    
        Docket No.: M-93-140-C.
        FR Notice: 58 FR 39242.
        Petitioner: Jeff Coal Company.
        Reg Affected: 30 CFR 1200 (d), (h), and (i).
        Summary of Findings: Petitioner's proposal to use cross-sections 
    instead of contour lines through the intake slope, at locations of rock 
    tunnel connections between veins, and at 1,000 feet intervals of 
    advance from the intake slope and to limit the mapping of mine workings 
    above and below to those present within 100 feet of the vein being 
    mined except when veins are interconnected to other veins beyond the 
    100 feet limit through rock tunnels considered acceptable alternative 
    method. Granted for Tracy Vein Slope Mine with conditions for the use 
    of cross-sections, in lieu of contour lines, limiting the mapping of 
    mines above or below this mine to those within 100 feet of the vein 
    being mined.
    
        Docket No.: M-93-141-C.
        FR Notice: 58 FR 39242.
        Petitioner: Jeff Coal Company.
        Reg Affected: 30 CFR 75.1202-1(a).
        Summary of Findings: Petitioner's proposal to revise and supplement 
    mine maps on an annual basis instead of the required 6 month interval 
    and to update maps daily by hand notations considered acceptable 
    alternative method. Granted for Tracy Vein Slope Mine with conditions 
    for annual revisions and supplements of the mine map.
    
        Docket No.: M-93-155-C.
        FR Notice: 58 FR 39570.
        Petitioner: Little Rock Coal Company.
        Reg Affected: 30 CFR 75.1200 (d), (h), and (i).
        Summary of Findings: Petitioner's proposal to use cross-sections 
    instead of contour lines through the intake slope, at locations of rock 
    tunnel connections between veins, and at 1,000 feet intervals of 
    advance from the intake slope and to limit the mapping of mine workings 
    above and below to those present within 100 feet of the vein being 
    mined except when veins are interconnected to other veins beyond the 
    100 feet limit through rock tunnels considered acceptable alternative 
    method. Granted for No. 1 Slope Mine with conditions for the use of 
    cross-sections, in lieu of contour lines, limiting the mapping of mines 
    above or below this mine to those within 100 feet of the vein being 
    mined.
    
        Docket No.: M-93-156-C.
        FR Notice: 58 FR 39570.
        Petitioner: Little Rock Coal Company.
        Reg Affected: 30 CFR 75.1202-1(a).
        Summary of Findings: Petitioner's proposal to revise and supplement 
    mine maps on an annual basis instead of the required 6 month interval 
    and to update maps daily by hand notations considered acceptable 
    alternative method. Granted for No. 1 Slope Mine with conditions for 
    annual revisions and supplement of the mine map.
    
        Docket No.: M-93-163-C.
        FR Notice: 58 FR 41295.
        Petitioner: Nowacki Coal Company.
        Reg Affected: 30 CFR 75.1100-2(a)(2).
        Summary of Findings: Petitioner's proposal to use only portable 
    fire extinguishers where rock dust, water cars, and other water storage 
    are not practical considered acceptable alternative method. Granted for 
    Nowacki Coal Company Slope Mine with conditions for firefighting 
    equipment in the working section.
    
        Docket No.: M-93-164-C.
        FR Notice: 58 FR 41295.
        Petitioner: Nowacki Coal Company.
        Reg Affected: 30 CFR 75.1200 (d), (h), and (i).
        Summary of Findings: Petitioner's proposal to use cross-sections 
    instead of contour lines through the intake slope, at locations of rock 
    tunnel connections between veins, and at 1,000 feet intervals of 
    advance from the intake slope and to limit the mapping of mine workings 
    above and below to those present within 100 feet of the vein being 
    mined except when veins are interconnected to other veins beyond the 
    100 feet limit through rock tunnels considered acceptable alternative 
    method. Granted for Nowacki Coal Company Slope Mine with conditions for 
    the use of cross-sections, in lieu of contour lines, limiting the 
    mapping of mines above or below this mine to those within 100 feet of 
    the vein being mined.
    
        Docket No.: M-93-165-C.
        FR Notice: 58 FR 41295.
        Petitioner: Nowacki Coal Company.
        Reg Affected: 30 CFR 75.1202-1(a).
        Summary of Findings: Petitioner's proposal to revise and supplement 
    mine maps on an annual basis instead of the required 6 month interval 
    and to update maps daily by hand notations considered acceptable 
    alternative method. Granted for Nowacki Coal Company Slope Mine with 
    conditions for annual revisions and supplements of the mine map.
        Docket No.: M-93-169-C.
        FR Notice: 58 FR 41295.
        Petitioner: Tito Coal.
        Reg Affected: 30 CFR 75.1100-2(a)(2).
        Summary of Findings: Petitioner's proposal to use only portable 
    fire extinguishers where rock dust, water cars, and other water storage 
    are not practical considered acceptable alternative method. Granted for 
    White Vein Slope Mine with conditions for firefighting equipment in the 
    working section.
    
        Docket No.: M-93-170-C.
        FR Notice: 58 FR 41296.
        Petitioner: Tito Coal.
        Reg Affected: 30 CFR 75.1200 (d), (h), and (i).
        Summary of Findings: Petitioner's proposal to use cross-sections 
    instead of contour lines through the intake slope, at locations of rock 
    tunnel connections between veins, and at 1,000 feet intervals of 
    advance from the intake slope and to limit the mapping of mine workings 
    above and below to those present within 100 feet of the vein being
    
    [[Page 25916]]
    
    mined except when veins are interconnected to other veins beyond the 
    100 feet limit through rock tunnels considered acceptable alternative 
    method. Granted for White Vein Slope Mine with conditions for the use 
    of cross-sections, in lieu of contour lines, limiting the mapping of 
    mines above or below this mine to those within 100 feet of the vein 
    being mined.
    
        Docket No.: M-93-171-C.
        FR Notice: 58 FR 41296.
        Petitioner: Tito Coal.
        Reg Affected: 30 CFR 75.1202-1(a).
        Summary of Findings: Petitioner's proposal to revise and supplement 
    mine maps on an annual basis instead of the required 6 month interval 
    and to update maps daily by hand notations considered acceptable 
    alternative method. Granted for White Vein Slope Mine with conditions 
    for annual revisions and supplements of the mine map.
    
        Docket No.: M-93-176-C.
        FR Notice: 58 FR 41296.
        Petitioner: Little Buck Coal Company.
        Reg Affected: 30 CFR 75.1100-2(a)(2).
        Summary of Findings: Petitioner's proposal to use only portable 
    fire extinguishers where rock dust, water cars, and other water storage 
    are not practical considered acceptable alternative method. Granted for 
    No. 2 Slope Mine with conditions for firefighting equipment in the 
    working section.
    
        Docket No.: M-93-177-C.
        FR Notice: 58 FR 41296.
        Petitioner: Little Buck Coal Company.
        Reg Affected: 30 CFR 75.1200 (d), (h), and (i).
        Summary of Findings: Petitioner's proposal to use cross-sections 
    instead of contour lines through the intake slope, at locations of rock 
    tunnel connections between veins, and at 1,000 feet intervals of 
    advance from the intake slope and to limit the mapping of mine workings 
    above and below to those present within 100 feet of the vein being 
    mined except when veins are interconnected to other veins beyond the 
    100 feet limit through rock tunnels considered acceptable alternative 
    method. Granted for No. 2 Slope Mine with conditions for the use of 
    cross-sections, in lieu of contour lines, limiting the mapping of mines 
    above or below this mine to those within 100 feet of the vein being 
    mined.
    
        Docket No.: M-93-178-C.
        FR Notice: 58 FR 41296.
        Petitioner: Little Buck Coal Company.
        Reg Affected: 30 CFR 75.1202-1(a).
        Summary of Findings: Petitioner's proposal to revise and supplement 
    mine maps on an annual basis instead of the required 6 month interval 
    and to update maps daily by hand notations considered acceptable 
    alternative method. Granted for No. 2 Slope Mine with conditions for 
    annual revisions and supplements of the mine map.
    
        Docket No.: M-93-184-C.
        FR Notice: 58 FR 41297.
        Petitioner: Primrose Coal Company.
        Reg Affected: 30 CFR 75.1002-1.
        Summary of Findings: Petitioner's proposal to use nonpermissible 
    electric equipment within 150 feet of the pillar line and to suspend 
    equipment operation anytime the methane concentration at the equipment 
    reaches 0.25 percent, either during operation or a preshift examination 
    considered acceptable alternative method. Granted for Primrose Slope 
    Mine with conditions for use of nonpermissible battery-powered 
    locomotives located within 150 feet from pillar workings.
    
        Docket No.: M-93-185-C.
        FR Notice: 58 FR 41297.
        Petitioner: Primrose Coal Company.
        Reg Affected: 30 CFR 75.1100-2(a)(2).
        Summary of Findings: Petitioner's proposal to use only portable 
    fire extinguishers where rock dust, water cars, and other water storage 
    are not practical considered acceptable alternative method. Granted for 
    Primrose Slope Mine with conditions for firefighting equipment in the 
    working section.
    
        Docket No.: M-93-186-C.
        FR Notice: 58 FR 41297.
        Petitioner: Primrose Coal Company.
        Reg Affected: 30 CFR 75.1200 (d), (h), and (i).
        Summary of Findings: Petitioner's proposal to use cross-sections 
    instead of contour lines through the intake slope, at locations of rock 
    tunnel connections between veins, and at 1,000 feet intervals of 
    advance from the intake slope and to limit the mapping of mine workings 
    above and below to those present within 100 feet of the vein being 
    mined except when veins are interconnected to other veins beyond the 
    100 feet limit through rock tunnels considered acceptable alternative 
    method. Granted for Primrose Slope Mine with conditions for the use of 
    cross-sections, in lieu of contour lines, limiting the mapping of mines 
    above or below this mine to those within 100 feet of the vein being 
    mined.
    
        Docket No.: M-93-194-C.
        FR Notice: 58 FR 41298.
        Petitioner: Brookside Coal Company.
        Reg Affected: 30 CFR 1100-2(a)(2).
        Summary of Findings: Petitioner's proposal to use only portable 
    fire extinguishers where rock dust, water cars, and other water storage 
    are not practical considered acceptable alternative method. Granted for 
    Four Foot Slope Mine with conditions for firefighting equipment in the 
    working section.
    
        Docket No.: M-93-203-C.
        FR Notice: 58 FR 44700.
        Petitioner: Sunset Coal Company.
        Reg Affected: 30 CFR 75.360(b)(5).
        Summary of Findings: Petitioner's proposal to examine each seal for 
    physical damage from the slope gunboat during the preshift examination 
    after an air quantity reading is taken inby the intake portal, to test 
    for the quantity and quality of air at the intake air split locations 
    off the slope in the gangway portion of the working section, and to 
    physically examine the entire length of the slope once a month 
    considered acceptable alternative method. Granted for Orchard Slope 
    Mine with conditions for examinations of seals in the intake air 
    haulage slope of this mine.
    
        Docket No.: M-93-205-C.
        FR Notice: 58 FR 44700.
        Petitioner: Sunset Coal Company.
        Reg Affected: 30 CFR 75.1100-2(a)(2).
        Summary of Findings: Petitioner's proposal to use only portable 
    fire extinguishers where rock dust, water cars, and other water storage 
    are not practical considered acceptable alternative method. Granted for 
    Orchard Slope Mine with conditions for firefighting equipment in the 
    working section.
    
        Docket No.: M-93-206-C.
        FR Notice: 58 FR 44701.
        Petitioner: Sunset Coal Company.
        Reg Affected: 30 CFR 75.1200 (d), (h), and (i).
        Summary of Findings: Petitioner's proposal to use cross-sections 
    instead of contour lines through the intake slope, at locations of rock 
    tunnel connections between veins, and at 1,000 feet intervals of 
    advance from the intake slope and to limit the mapping of mine workings 
    above and below to those present within 100 feet of the vein being 
    mined except when veins are interconnected to other veins beyond the 
    100 feet limit through rock tunnels considered acceptable alternative 
    method. Granted for Orchard Slope Mine with conditions for the use of 
    cross-sections, in lieu of contour lines, limiting the mapping of mines 
    above or below this mine to those within 100 feet of the vein being 
    mined.
    
        Docket No.: M-93-218-C.
        FR Notice: 58 FR 46219.
        Petitioner: Rhen Coal Company.
        Reg Affected: 30 CFR 75.360(b)(5).
        Summary of Findings: Petitioner's proposal to examine each seal for 
    physical damage from the slope gunboat
    
    [[Page 25917]]
    
    during the preshift examination after an air quantity reading is taken 
    inby the intake portal, to test for the quantity and quality of air at 
    the intake air split locations off the slope in the gangway portion of 
    the working section, and to physically examine the entire length of the 
    slope once a month considered acceptable alternative method. Granted 
    for Skidmore Slope Mine with conditions for examinations of seals in 
    the intake air haulage slope of this mine.
    
        Docket No.: M-93-220-C.
        FR Notice: 58 FR 46219.
        Petitioner: Rhen Coal Company.
        Reg Affected: 30 CFR 75.1100-2(a)(2).
        Summary of Findings: Petitioner's proposal to use only portable 
    fire extinguishers where rock dust, water cars, and other water storage 
    are not practical considered acceptable alternative method. Granted for 
    Skidmore Slope Mine with conditions for firefighting equipment in the 
    working section.
    
        Docket No.: M-93-221-C.
        FR Notice: 58 FR 46219.
        Petitioner: Rhen Coal Company.
        Reg Affected: 30 CFR 1200 (d), (h), and (i).
        Summary of Findings: Petitioner's proposal to use cross-sections 
    instead of contour lines through the intake slope, at locations of rock 
    tunnel connections between veins, and at 1,000 feet intervals of 
    advance from the intake slope and to limit the mapping of mine workings 
    above and below to those present within 100 feet of the vein being 
    mined except when veins are interconnected to other veins beyond the 
    100 feet limit through rock tunnels considered acceptable alternative 
    method. Granted for Skidmore Slope Mine with conditions for the use of 
    cross-sections, in lieu of contour lines, limiting the mapping of mines 
    above or below this mine to those within 100 feet of the vein being 
    mined.
    
        Docket No.: M-93-232-C.
        FR Notice: 58 FR 46221.
        Petitioner: S & M Coal Company.
        Reg Affected: 30 CFR 75.360(b)(5).
        Summary of Findings: Petitioner's proposal to examine each seal for 
    physical damage from the slope gunboat during the preshift examination 
    after an air quantity reading is taken inby the intake portal, to test 
    for the quantity and quality of air at the intake air split locations 
    off the slope in the gangway portion of the working section, and to 
    physically examine the entire length of the slope once a month 
    considered acceptable alternative method. Granted for Buck Mountain 
    Slope Mine with conditions for examinations of seals in the intake air 
    haulage slope of this mine.
    
        Docket No.: M-93-234-C.
        FR Notice: 58 FR 46221.
        Petitioner: S & M Coal Company.
        Reg Affected: 30 CFR 75.1100-2(a)(2).
        Summary of Findings: Petitioner's proposal to use only portable 
    fire extinguishers where rock dust, water cars, and other water storage 
    are not practical considered acceptable alternative method. Granted for 
    Buck Mountain Slope Mine with conditions for firefighting equipment in 
    the working section.
    
        Docket No.: M-93-235-C.
        FR Notice: 58 FR 46221.
        Petitioner: S & M Coal Company.
        Reg Affected: 30 CFR 75.1200 (d), (h), and (i).
        Summary of Findings: Petitioner's proposal to use cross-sections 
    instead of contour lines through the intake slope, at locations of rock 
    tunnel connections between veins, and at 1,000 feet intervals of 
    advance from the intake slope and to limit the mapping of mine workings 
    above and below to those present within 100 feet of the vein being 
    mined except when veins are interconnected to other veins beyond the 
    100 feet limit through rock tunnels considered acceptable alternative 
    method. Granted for Buck Mountain Slope Mine with conditions for the 
    use of cross-sections, in lieu of contour lines, limiting the mapping 
    of mines above or below this mine to those within 100 feet of the vein 
    being mined.
    
        Docket No.: M-93-236-C.
        FR Notice: 58 FR 46221.
        Petitioner: S & M Coal Company.
        Reg Affected: 30 CFR 75.1202-1(a).
        Summary of Findings: Petitioner's proposal to revise and supplement 
    mine maps on an annual basis instead of the required 6 month interval 
    and to update maps daily by hand notations considered acceptable 
    alternative. Granted for Buck Mountain Slope Mine with conditions for 
    annual revisions and supplements of the mine map.
    
        Docket No.: M-93-263-C.
        FR Notice: 58 FR 57626.
        Petitioner: B & B Anthracite Coal Company.
        Reg Affected: 30 CFR 75.1200 (d), (h), and (i).
        Summary of Findings: Petitioner's proposal to use cross-sections 
    instead of contour lines through the intake slope, at locations of rock 
    tunnel connections between veins, and at 1,000 feet intervals of 
    advance from the intake slope and to limit the mapping of mine workings 
    above and below to those present within 100 feet of the vein being 
    mined except when veins are interconnected to other veins beyond the 
    100 feet limit through rock tunnels considered acceptable alternative 
    method. Granted for Rock Ridge Slope Mine with conditions for the use 
    of cross-sections, in lieu of contour lines, limiting the mapping of 
    mines above or below this mine to those within 100 feet of the vein 
    being mined.
    
        Docket No.: M-93-264-C.
        FR Notice: 58 FR 57626.
        Petitioner: B & B Anthracite Coal Company.
        Reg Affected: 30 CFR 1200 (d), (h), and (i).
        Summary of Findings: Petitioner's proposal to use cross-sections 
    instead of contour lines through the intake slope, at locations of rock 
    tunnel connections between veins, and at 1,000 feet intervals of 
    advance from the intake slope and to limit the mapping of mine workings 
    above and below to those present within 100 feet of the vein being 
    mined except when veins are interconnected to other veins beyond the 
    100 feet limit through rock tunnels considered acceptable alternative 
    method. Granted for Rock Ridge No. 1 Slope Mine with conditions for the 
    use of cross-sections, in lieu of contour lines, limiting the mapping 
    of mines above or below this mine to those within 100 feet of the vein 
    being mined.
    
        Docket No.: M-93-285-C.
        FR Notice: 58 FR 57626.
        Petitioner: International Anthracite Corp.
        Reg Affected: 30 CFR 75.1202-1(a).
        Summary of Findings: Petitioner's proposal to revise and supplement 
    mine maps on an annual basis instead of the required 6 month interval 
    and to update maps daily by hand notations considered acceptable 
    alternative. Granted for B & M Tunnel Mine with conditions for annual 
    revisions and supplements of the mine map.
    
        Docket No.: M-93-289-C.
        FR Notice: 58 FR 58567.
        Petitioner: R S & W Coal Company, Inc.
        Reg Affected: 30 CFR 75.360(b)(5).
        Summary of Findings: Petitioner's proposal to examine each seal for 
    physical damage from the slope gunboat during the preshift examination 
    after an air quantity reading is taken inby the intake portal, to test 
    for the quantity and quality of air at the intake air split locations 
    off the slope in the gangway portion of the working section, and to 
    physically examine the entire length of the slope once a month 
    considered acceptable alternative method. Granted for R S & W Drift 
    Mine with conditions for examinations of seals in the intake air 
    haulage slope of this mine.
    
        Docket No.: M-93-291-C.
        FR Notice: 58 FR 58567.
    
    [[Page 25918]]
    
        Petitioner: R S & W Coal Company, Inc.
        Reg Affected: 30 CFR 75.1002-1(a).
        Summary of Findings: Petitioner's proposal to use nonpermissible 
    electric equipment within 150 feet of the pillar line and to suspend 
    equipment operation anytime the methane concentration at the equipment 
    reaches 0.25 percent, either during operation or a preshift examination 
    considered acceptable alternative method. Granted for R S & W Drift 
    Mine with conditions for use of nonpermissible battery-powered 
    locomotives located within 150 feet from pillar workings.
    
        Docket No.: M-93-292-C.
        FR Notice: 58 FR 58568.
        Petitioner: R S & W Coal Company, Inc.
        Reg Affected: 30 CFR 75.1100-2(a)(2).
        Summary of Findings: Petitioner's proposal to use only portable 
    fire extinguishers where rock dust, water cars, and other water storage 
    are not practical considered acceptable alternative method. Granted for 
    R S & W Drift Mine with conditions for fire-fighting equipment in the 
    working section.
    
        Docket No.: M-93-293-C.
        FR Notice: 58 FR 58568.
        Petitioner: R S & W Coal Company, Inc.
        Reg Affected: 30 CFR 75.1200 (d), (h), and (i).
        Summary of Findings: Petitioner's proposal to use cross-sections 
    instead of contour lines through the intake slope, at locations of rock 
    tunnel connections between veins, and at 1,000 feet intervals of 
    advance from the intake slope and to limit the mapping of mine workings 
    above and below to those present within 100 feet of the vein being 
    mined except when veins are interconnected to other veins beyond the 
    100 feet limit through rock tunnels considered acceptable alternative 
    method. Granted for R S & W Drift Mine with conditions for the use of 
    cross-sections, in lieu of contour lines, limiting the mapping of mines 
    above or below this mine to those within 100 feet of the vein being 
    mined.
    
        Docket No.: M-93-294-C.
        FR Notice: 58 FR 58568.
        Petitioner: R S & W Coal Company, Inc.
        Reg Affected: 30 CFR 75.1202-1(a).
        Summary of Findings: Petitioner's proposal to revise and supplement 
    mine maps on an annual basis instead of the required 6 month interval 
    and to update maps daily by hand notations considered acceptable 
    alternative. Granted for R S & W Drift Mine with conditions for annual 
    revisions and supplements of the mine map.
    
    [FR Doc. 96-12973 Filed 5-22-96; 8:45 am]
    BILLING CODE 4510-43-P
    
    

Document Information

Published:
05/23/1996
Department:
Mine Safety and Health Administration
Entry Type:
Notice
Action:
Notice of affirmative decisions issued by the Administrators for Coal Mine Safety and Health and Metal and Nonmetal Mine Safety and Health on petitions for modification of the application of mandatory safety standards.
Document Number:
96-12973
Pages:
25913-25918 (6 pages)
PDF File:
96-12973.pdf