97-13561. NorAm Gas Transmission Company; Notice of Application  

  • [Federal Register Volume 62, Number 100 (Friday, May 23, 1997)]
    [Notices]
    [Pages 28458-28459]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-13561]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP97-517-000]
    
    
    NorAm Gas Transmission Company; Notice of Application
    
    May 19, 1997.
        Take notice that on May 12, 1997, NorAm Gas Transmission Company 
    (NGT), a subsidiary of NorAm Energy Corporation, whose main office is 
    located at 1600 Smith Street, Houston, Texas 77002, filed an 
    abbreviated application pursuant to Section 7(b) of the Natural Gas Act 
    (NGA), as amended and Part 157 of the Federal Energy Regulatory 
    Commission's (Commission) Regulations thereunder (18 CFR 157.7 and 
    157.18), requesting issuance of a Commission order authorizing NGT to 
    effect the sale and transfer to NorAm field Services Corporation (NFS) 
    of certain existing pipeline and compressor facilities and equipment 
    appurtenant thereto, located in Oklahoma, Texas, Louisiana and 
    Arkansas. NGT's proposal is more fully set forth in the application 
    which is on file with the Commission and open to public inspection.
        NGT seeks a determination that once conveyed, these facilities will 
    be gathering facilities exempt from the Commission's jurisdiction.
        Specifically, NGT proposes to abandon and transfer to NFS certain 
    gas supply facilities designated as the Oklahoma Facilities, the Texas 
    Facilities, the Louisiana Facilities and the Arkansas Facilities. The 
    Oklahoma Facilities consist of approximately 42 miles of 2-inch to 12-
    inch diameter pipe. These facilities, designated as Lines ADT-9, 2-T-1, 
    NCT-1, ATE-1 9-1-C, 36 and OT-15, are located in Ellis, Blaine, 
    Kinfisher, Custer, Caddo, Grady, Pittsburgh, Latimer and Haskell 
    Counties Oklahoma. The Texas Facilities consist of a 12-inch diameter 
    segment of Line ST-1, approximately 10 miles in length located in 
    Panola County. The Louisiana Facilities consist of approximately 11 
    miles of 2-inch to 4-inch diameter pipe designated as Lines RT-1, RT-2 
    and RM-19 and the 80 h.p. Stonewall Field Compressor Station, located 
    Caddo and DeSoto Parishes. The Arkansas Facilities consist of 45 miles 
    of 2-inch to 6-inch diameter pipe designated as Lines OT-22, OT-20, B-
    271, B-399, BT-11, BT-2, BT-2-A, B-321, B-137, B-245, B-256, B-429, B-
    307, BT-11-A, B-274, BT-8, J-13, BT-4, B-349, B-374, and BM-22. NGT 
    proposes to sell these facilities to NFS
    
    [[Page 28459]]
    
    for the net book value of the assets at the time of closing.
        Any person desiring to be heard or to make any protest with 
    reference to said application should on or before June 6, 1997, file 
    with the Federal Energy Regulatory Commission, 888 First Street, N.E., 
    Washington, D.C. 20426, a motion to intervene or a protest in 
    accordance with the requirements of the Commission's Rules of Practice 
    and Procedure (18 CFR 385.211 and Sec. 385.214) and the Regulations 
    under the Natural Gas Act (18 CFR 157.10). All protests filed with the 
    Commission will be considered by it in determining the appropriate 
    action to be taken but will not serve to make the pretestants parties 
    to the proceedings. Any person wishing to become a party to a 
    proceeding or to participate as a party in any hearing therein must 
    file a motion to intervene in accordance with the Commission's Rules.
        Take further notice that, pursuant to the authority contained in 
    and subject to the jurisdiction conferred upon the Commission by 
    Sections 7 and 15 of the Natural gas Act and the Commission's Rules of 
    Practice and Procedure, a hearing will be held without further notice 
    before the Commission or its designee on this application if no motion 
    to intervene is filed within the time required herein or if the 
    Commission on its own review of the matter, finds that a grant of the 
    certificate for the proposal is required by the public convenience and 
    necessity. If the Commission believes that a formal hearing is 
    required, further notice of such hearing will be duly given.
        Under the procedure herein provided for, unless otherwise advised, 
    it will be unnecessary for NGT to appear or be represented at the 
    hearing.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 97-13561 Filed 5-22-97; 8:45 am]
    BILLING CODE 8717-01-M
    
    
    

Document Information

Published:
05/23/1997
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
97-13561
Pages:
28458-28459 (2 pages)
Docket Numbers:
Docket No. CP97-517-000
PDF File:
97-13561.pdf