C6-2101. Oil and Gas and Sulphur Operations in the Outer Continental Shelf (OCS)Minimum Blowout Prevention (BOP) System Requirements for Well- Workover Operations Performed Using Coiled Tubing With the Production Tree in Place  

  • [Federal Register Volume 71, Number 99 (Tuesday, May 23, 2006)]
    [Corrections]
    [Page 29710]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: C6-2101]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF THE INTERIOR
    
    Minerals Management Service
    
    30 CFR Part 250
    
    RIN 1010-AC96
    
    
    Oil and Gas and Sulphur Operations in the Outer Continental Shelf 
    (OCS)--Minimum Blowout Prevention (BOP) System Requirements for Well-
    Workover Operations Performed Using Coiled Tubing With the Production 
    Tree in Place
    
    Correction
    
        In rule document 06-2101 beginning on page 11310 in the issue of 
    Tuesday, March 7, 2006, make the following correction:
    
    
    Sec. 250.615  [Corrected]
    
        On page 11313, in Sec. 250.615(e)(1), in the table, under the third 
    column, between the current fifth and sixth entries, insert the 
    following entry ``Hydraulically-operated pipe rams.''.
    
    [FR Doc. C6-2101 Filed 5-22-06; 8:45 am]
    BILLING CODE 1505-01-D
    
    
    

Document Information

Published:
05/23/2006
Department:
Minerals Management Service
Entry Type:
Correction
Document Number:
C6-2101
Pages:
29710-29710 (1 pages)
RINs:
1010-AC96: Blowout Prevention for Production Tree Coiled Tubing Workover Operations
RIN Links:
https://www.federalregister.gov/regulations/1010-AC96/blowout-prevention-for-production-tree-coiled-tubing-workover-operations
PDF File:
c6-2101.pdf
CFR: (1)
30 CFR 250.615