Home »
2006 Issues »
71 FR (05/23/2006) » C6-2101. Oil and Gas and Sulphur Operations in the Outer Continental Shelf (OCS)Minimum Blowout Prevention (BOP) System Requirements for Well- Workover Operations Performed Using Coiled Tubing With the Production Tree in Place
C6-2101. Oil and Gas and Sulphur Operations in the Outer Continental Shelf (OCS)Minimum Blowout Prevention (BOP) System Requirements for Well- Workover Operations Performed Using Coiled Tubing With the Production Tree in Place
[Federal Register Volume 71, Number 99 (Tuesday, May 23, 2006)]
[Corrections]
[Page 29710]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: C6-2101]
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
Minerals Management Service
30 CFR Part 250
RIN 1010-AC96
Oil and Gas and Sulphur Operations in the Outer Continental Shelf
(OCS)--Minimum Blowout Prevention (BOP) System Requirements for Well-
Workover Operations Performed Using Coiled Tubing With the Production
Tree in Place
Correction
In rule document 06-2101 beginning on page 11310 in the issue of
Tuesday, March 7, 2006, make the following correction:
Sec. 250.615 [Corrected]
On page 11313, in Sec. 250.615(e)(1), in the table, under the third
column, between the current fifth and sixth entries, insert the
following entry ``Hydraulically-operated pipe rams.''.
[FR Doc. C6-2101 Filed 5-22-06; 8:45 am]
BILLING CODE 1505-01-D
Document Information
- Published:
- 05/23/2006
- Department:
- Minerals Management Service
- Entry Type:
- Correction
- Document Number:
- C6-2101
- Pages:
- 29710-29710 (1 pages)
- RINs:
- 1010-AC96: Blowout Prevention for Production Tree Coiled Tubing Workover Operations
- RIN Links:
- https://www.federalregister.gov/regulations/1010-AC96/blowout-prevention-for-production-tree-coiled-tubing-workover-operations
- PDF File:
-
c6-2101.pdf
- CFR: (1)
- 30 CFR 250.615