C6-4578. Office for Civil Rights; The Patient Safety and Quality Improvement Act of 2005; Delegation of Authority
-
Start Preamble
Start Printed Page 29710
End Preamble
Start Supplemental Information
Correction
In notice document 06-4578 beginning on page 28701 in the issue of Wednesday, May 17, 2006 make the following correction:
On page 28702, in the first column, in the sixth line from the end of the document, “Dated: April 13, 2006” should read “Dated: April 3, 2006”.
End Supplemental Information Start Preamble End Preamble Start Supplemental InformationCorrection
In rule document 06-2101 beginning on page 11310 in the issue of Tuesday, March 7, 2006, make the following correction:
[Corrected]On page 11313, in §250.615(e)(1), in the table, under the third column, between the current fifth and sixth entries, insert the following entry “Hydraulically-operated pipe rams.”.
[FR Doc. C6-4578 Filed 5-22-06; 8:45 am]
BILLING CODE 1505-01-D
[FR Doc. C6-2101 Filed 5-22-06; 8:45 am]
BILLING CODE 1505-01-D
Document Information
- Published:
- 05/23/2006
- Department:
- Minerals Management Service
- Entry Type:
- Correction
- Document Number:
- C6-4578
- Pages:
- 29710-29710 (1 pages)
- RINs:
- 1010-AC96: Blowout Prevention for Production Tree Coiled Tubing Workover Operations
- RIN Links:
- https://www.federalregister.gov/regulations/1010-AC96/blowout-prevention-for-production-tree-coiled-tubing-workover-operations
- PDF File:
- c6-4578.pdf