2014-11898. Notice of Correction on the Draft Environmental Impact Statement for the Four Corners Power Plant and Navajo Mine Energy Project
-
Start Preamble
AGENCY:
Office of Surface Mining Reclamation and Enforcement (OSMRE), Interior.
ACTION:
Notice; correction.
SUMMARY:
On March 28, 2014 (79 FR 17569), OSMRE published a notice of availability (NOA) for the Four Corners Power Plant and Navajo Mine Energy Project draft environmental impact statement (DEIS). The DEIS included a copy of the United States Army Corps of Engineers (USACE) Preliminary Draft Permit Evaluation (Appendix C of the DEIS) with Attachments A through D omitted. OSMRE updated the online DEIS found at http://www.wrcc.osmre.gov/initiatives/fourCorners.shtm on May 2, 2014 to include the omitted Attachments A through D, and the USACE mailed Attachments A through D on May 5, 2014 to DEIS repositories identified in the March 28, 2014 (79 FR 17569) NOA for inclusion.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Marcelo Calle, 303-293-5035.
Start SignatureDated: May 16, 2014.
Joseph G. Pizarchik,
Director.
[FR Doc. 2014-11898 Filed 5-22-14; 8:45 am]
BILLING CODE 4310-05-P
Document Information
- Published:
- 05/23/2014
- Department:
- Surface Mining Reclamation and Enforcement Office
- Entry Type:
- Notice
- Action:
- Notice; correction.
- Document Number:
- 2014-11898
- Pages:
- 29800-29800 (1 pages)
- Docket Numbers:
- S1D1S SS08011000 SX066A000 67F 134S180110, S2D2S SS08011000 SX066A00 33F 13xs501520
- PDF File:
- 2014-11898.pdf