2014-11898. Notice of Correction on the Draft Environmental Impact Statement for the Four Corners Power Plant and Navajo Mine Energy Project  

  • Start Preamble

    AGENCY:

    Office of Surface Mining Reclamation and Enforcement (OSMRE), Interior.

    ACTION:

    Notice; correction.

    SUMMARY:

    On March 28, 2014 (79 FR 17569), OSMRE published a notice of availability (NOA) for the Four Corners Power Plant and Navajo Mine Energy Project draft environmental impact statement (DEIS). The DEIS included a copy of the United States Army Corps of Engineers (USACE) Preliminary Draft Permit Evaluation (Appendix C of the DEIS) with Attachments A through D omitted. OSMRE updated the online DEIS found at http://www.wrcc.osmre.gov/​initiatives/​fourCorners.shtm on May 2, 2014 to include the omitted Attachments A through D, and the USACE mailed Attachments A through D on May 5, 2014 to DEIS repositories identified in the March 28, 2014 (79 FR 17569) NOA for inclusion.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Marcelo Calle, 303-293-5035.

    Start Signature

    Dated: May 16, 2014.

    Joseph G. Pizarchik,

    Director.

    End Signature End Further Info End Preamble

    [FR Doc. 2014-11898 Filed 5-22-14; 8:45 am]

    BILLING CODE 4310-05-P

Document Information

Published:
05/23/2014
Department:
Surface Mining Reclamation and Enforcement Office
Entry Type:
Notice
Action:
Notice; correction.
Document Number:
2014-11898
Pages:
29800-29800 (1 pages)
Docket Numbers:
S1D1S SS08011000 SX066A000 67F 134S180110, S2D2S SS08011000 SX066A00 33F 13xs501520
PDF File:
2014-11898.pdf