2017-10261. Notice of Final Federal Agency Actions on Transportation Project in Washington State  

  • Start Preamble Start Printed Page 23702

    AGENCY:

    Federal Highway Administration (FHWA), Department of Transportation (DOT).

    ACTION:

    Notice of Limitation on Claims for Judicial Review of Actions by FHWA and other Federal agencies.

    SUMMARY:

    This notice announces actions taken by FHWA and other agencies related to the Index-Galena Road, Milepost 6.4 to 6.9 project in Snohomish County, Washington, that are final. Project sponsor: Snohomish County. Project description: The project will repair this flood-damaged roadway. It would construct a relocated roadway that will extend from an area in proximity to the lower washout at Index-Galena Road Milepost 6.4 to an area in proximity to the upper washout at Milepost 6.9. The relocated roadway will re-establish roadway connectivity on Index-Galena Road for residences, emergency service providers, recreationists, and land managed by the U. S. Forest Service. The U.S. Forest Service is a Cooperating Agency on this project.

    DATES:

    A claim seeking judicial review of the Federal agency actions on the listed highway project will be barred unless the claim is filed on or before October 20, 2017. If the Federal law that authorizes judicial review of a claim provides a time period of less than 150 days for filing such claim, then that shorter time period still applies.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    For FHWA, contact Jeff Horton, Area Engineer, Washington Division, Federal Highway Administration, 711 S. Capitol Way, Suite 501, Olympia, WA 98501-1284, 360-753-9411, or jeff.horton@dot.gov. Regular office hours are from 8:00 a.m. to 4:30 p.m., Monday through Friday, except Federal holidays. Further information and documentation can be found at http://snohomishcountywa.gov/​624/​Index-Galena-Rd-MP-64-69-Index-TBD.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Notice is hereby given that the FHWA has taken final agency actions within the meaning of 23 U.S.C. 139 (l) (1) by issuing a NEPA Finding of No Significant Impact for the Index-Galena Road, Milepost 6.4 to Milepost 6.9 project. The Environmental Assessment (EA) for the project was signed on September 6, 2016. This notice applies to all Federal agency decisions, actions, approvals, licenses, and permits made as of the issuance date of this notice and all laws under which such actions were taken, including but not limited to:

    1. National Environmental Policy Act (NEPA) [42 U.S.C. 4321-4370h]

    2. Federal-Aid Highway Act [23 U.S.C. 109]

    3. Clean Air Act [42 U.S.C. 7401-7671(q)] (transportation conformity)

    4. Section 4(f) of the Department of Transportation Act of 1966 [49 U.S.C. 303]

    5. Fish and Wildlife Coordination Act [16 U.S.C. 661-667(e)]

    6. Magnuson-Stevens Fishery Conservation and Management Act of 1976, [16 U.S.C. 1801-1882]

    7. Section 106 of the National Historic Preservation Act of 1966, as amended [54 U.S.C. 306108]

    8. Clean Water Act, 33 U.S.C. 1251-1387 (Section 404, Section 401)

    9. General Bridge Act of 1946 [33 U.S.C. 525-533]

    10. National Forest Management Act of 1976 [16 U.S.C. 1601-1610]

    11. E.O. 11990 Protection of Wetlands

    12. E.O. 11988 Floodplain Management

    13. E.O. 12898 Federal Actions to Address Environmental Justice in Minority Populations and Low Income Populations

    Start Authority

    Authority: 23 U.S.C. 139(l)(1)

    End Authority Start Signature

    Issued on: May 9, 2017.

    Daniel M. Mathis,

    FHWA Division Administrator, Olympia, WA.

    End Signature End Supplemental Information

    [FR Doc. 2017-10261 Filed 5-22-17; 8:45 am]

    BILLING CODE 4910-RY-P

Document Information

Published:
05/23/2017
Department:
Federal Highway Administration
Entry Type:
Notice
Action:
Notice of Limitation on Claims for Judicial Review of Actions by FHWA and other Federal agencies.
Document Number:
2017-10261
Dates:
A claim seeking judicial review of the Federal agency actions on the listed highway project will be barred unless the claim is filed on or before October 20, 2017. If the Federal law that authorizes judicial review of a claim provides a time period of less than 150 days for filing such claim, then that shorter time period still applies.
Pages:
23702-23702 (1 pages)
PDF File:
2017-10261.pdf
Supporting Documents:
» Final Federal Agency Actions: Proposed Highway in California
» Final Federal Agency Actions: Proposed Highway Projects in Texas
» Transfer and Sanction Programs
» Experimental Project To Evaluate Proposals for Delegation of Certain Program-Wide FHWA Responsibilities to States
» Environmental Impact Statements; Availability, etc.: Multiple Counties in Alabama; Rescission
» Federal Agency Actions: SH 205 From North of John King (Rockwall County Line) to SH 78 in Collin County, TX
» Federal Agency Actions: Interstate 95 in City of Fredericksburg and Counties of Spotsylvania, Stafford, Prince William, and Fairfax, VA
» Environmental Impact Statements; Availability, etc.: I-495 and I-270 Managed Lanes Study, Montgomery and Prince George's Counties, MD and Fairfax County, VA
» Federal Agency Actions: Proposed Highway in California
» Federal Agency Actions: California; Proposed Highway