2024-11226. National Environmental Policy Act Implementing Procedures; Correction  

  • Start Preamble

    AGENCY:

    Office of the General Counsel, Department of Energy.

    ACTION:

    Final rule; correction.

    SUMMARY:

    The U.S. Department of Energy (DOE or the Department) is correcting a final rule that was published in the Federal Register on April 30, 2024. The final rule revised National Environmental Policy Act (NEPA) implementing procedures (regulations). This document corrects an error in that final rule.

    DATES:

    Effective May 30, 2024.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    For information regarding DOE's NEPA regulations, contact Ms. Carrie Abravanel, Deputy Director, Office of NEPA Policy and Compliance, at carrie.abravanel@hq.doe.gov or 202-586-4798.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Background

    DOE published a final rule in the Federal Register on April 30, 2024, revising NEPA implementing procedures to add a categorical exclusion for certain energy storage systems and revise categorical Start Printed Page 45564 exclusions for upgrading and rebuilding powerlines and for solar photovoltaic systems, as well as to make conforming changes to related sections of DOE's NEPA regulations. 89 FR 34074. These changes will help ensure that DOE conducts an appropriate and efficient environmental review of proposed projects that normally do not result in significant environmental impacts.

    Correction

    In FR Doc. 2024-09186 appearing on page 34093 in the Federal Register of Tuesday, April 30, 2024, the following correction is made:

    Appendix B to Subpart D of Part 1021 [Corrected]

    Start Amendment Part

    1. On page 34093 in the second column, amendatory instruction 2.c., “Revising B5.1 and B5.16.” is corrected to read “Revising paragraph (a) of B5.1 and B5.16”.

    End Amendment Part

    Signing Authority

    This document of the Department of Energy was signed on May 17, 2024, by Samuel T. Walsh, General Counsel, pursuant to delegated authority from the Secretary of Energy. That document with the original signature and date is maintained by DOE. For administrative purposes only, and in compliance with requirements of the Office of the Federal Register, the undersigned DOE Federal Register Liaison Officer has been authorized to sign and submit the document in electronic format for publication, as an official document of the Department of Energy. This administrative process in no way alters the legal effect of this document upon publication in the Federal Register .

    Start Signature

    Signed in Washington, DC, on May 17, 2024.

    Treena V. Garrett,

    Federal Register Liaison Officer, U.S. Department of Energy.

    End Signature End Supplemental Information

    [FR Doc. 2024-11226 Filed 5-22-24; 8:45 am]

    BILLING CODE 6450-01-P

Document Information

Effective Date:
5/30/2024
Published:
05/23/2024
Department:
Energy Department
Entry Type:
Rule
Action:
Final rule; correction.
Document Number:
2024-11226
Dates:
Effective May 30, 2024.
Pages:
45563-45564 (2 pages)
Docket Numbers:
DOE-HQ-2023-0063
RINs:
1990-AA48: Revisions to DOE's NEPA Regulations
RIN Links:
https://www.federalregister.gov/regulations/1990-AA48/revisions-to-doe-s-nepa-regulations
PDF File:
2024-11226.pdf
Supporting Documents:
» Technical Support Document for DOE's Final Rule
» DOE-10-CFR-1021-Technical-Support-Document-2023-11-16
CFR: (1)
10 CFR 1021