DEPARTMENT OF ENERGY
[Docket No. CP94-547-000]
Williams Natural Gas Co.; Request Under Blanket Authorization
May 18, 1994.
Take notice that on May 16, 1994, Williams Natural Gas Company
(WNG), P.O. Box 3288, Tulsa, Oklahoma 74101, filed in Docket No. CP94-
547-000 a request pursuant to Secs. 157.205 and 157.216 of the
Commission's Regulations under the Natural Gas Act (18 CFR 157.205,
157.216) for authorization to relocate the Kansas Gas & Electric Derby
town border and to abandon in place approximately 2.25 miles of 4-inch
and 6-inch lateral pipeline located in Sedgwick County, Kansas, under
WNG's blanket certificate issued in Docket No. CP82-479-000 pursuant to
Section 7 of the Natural Gas Act, all as more fully set forth in the
request that is on file with the Commission and open to public
inspection.
WNG proposes to relocate the Derby town border to the site of the
existing high pressure regulator setting and to abandon in place
approximately 2.25 miles of lateral pipeline. The projected volume of
delivery is not expected to exceed the total volume currently being
delivered. The estimated cost of construction is approximately $42,212,
which will be paid from funds on hand and the reclaim cost is estimated
to be $2,946. WNG states that this change is not prohibited by an
existing tariff and it has sufficient capacity to accomplish the
deliveries specified without detriment or disadvantage to its other
customers.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Sec. 157.205 of the
Regulations under the Natural Gas Act (18 CFR 157.205) a protest to the
request. If no protest is filed within the time allowed therefor, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to section 7 of the Natural Gas Act.
Lois D. Cashell,
Secretary.
[FR Doc. 94-12579 Filed 5-23-94; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 05/24/1994
- Department:
- Energy Department
- Entry Type:
- Uncategorized Document
- Document Number:
- 94-12579
- Pages:
- 0-0 (1 pages)
- Docket Numbers:
- Federal Register: May 24, 1994, Docket No. CP94-547-000