-
Start Preamble
AGENCY:
Millennium Challenge Corporation.
SUMMARY:
The Millennium Challenge Corporation (MCC) is reporting for the quarter January 1, 2013, through March 31, 2013, on assistance provided under section 605 of the Millennium Challenge Act of 2003 (22 U.S.C. 7701 et seq.), as amended (the Act), and on transfers or allocations of funds to other federal agencies under section 619(b) of the Act. The following report will be made available to the public by publication in the Federal Register and on the Internet Web site of the MCC (www.mcc.gov) in accordance with section 612(b) of the Act.
Start SignatureDated: May 20, 2013.
Paul C. Weinberger,
Vice President, Congressional and Public Affairs, Millennium Challenge Corporation.
Projects Obligated Objective Cumulative Expenditures Measures Country: Armenia 5 Year: 2013 Quarter 2 Total Obligation: $176,550,239 Entity to which the assistance is provided: MCA Armenia Total Quarterly Expenditures1: Irrigated Agriculture Project (Agriculture and Water) $153,716,023 Increase agricultural productivity Improve and Quality of Irrigation $153,716,023 Training/technical assistance provided for On-Farm Water Management. Training/technical assistance provided for Post-Harvest Processing. Loans Provided. Value of irrigation feasibility and/or detailed design contracts signed. Value of irrigation feasibility and/or detailed design contracts disbursed. Start Printed Page 31600 Number of farmers using better on-farm water management. Number of enterprises using improved techniques. Value of irrigation feasibility and/or detailed design contracts signed. Additional Land irrigated under project. Value of irrigation feasibility and/or detailed design contracts signed. Value of irrigation feasibility and/or detailed design contracts disbursed. Rural Development Project Rural Road Rehabilitation Project $8,441,028 Better access to economic and social infrastructure $8,441,028 Average annual daily traffic on Pilot Roads. International roughness index for Pilot Roads. Road Sections Rehabilitated—Pilot Roads. Pilot Roads: Percent of Contracted Roads Works Disbursed of Works Completed. Program Administration 2, Due Diligence, Monitoring and Evaluation $14,393,188 $14,393,188 Pending subsequent reports 3 Projects Obligated Objective Cumulative Disbursements Measures 2 Country: Burkina Faso Year: 2013 Quarter 2 Total Obligation: $478,585,879 Entity to which the assistance is provided: MCA Burkina Faso Total Quarterly Disbursements 1: $28,561,283 Roads Project $ 194,039,560 Enhance access to markets through investments in the road network $ 47,804,584 International Roughness Index: Sabou-Koudougou-Perkoa-Didyr. International Roughness Index: Dedougou-Nouna-Bomborukuy-Nouna Border. International Roughness Index: Banfora-Sindou. Kilometers of road under works contract (Primary roads). Access time to the closest market via paved roads in the Sourou and Comoe (minutes). Kilometers of road under works contract (Rural roads). Personnel trained in procurement, contract management and financial systems. Periodic road maintenance coverage rate (for all funds) (percent). Rural Land Governance Project $59,915,356 Increase investment in land and rural productivity through improved land tenure security and land management $20,996,240 Trend in incidence of conflict over land rights reported in the 17 pilot communes (annual rate of change in the occurrence of conflicts over land rights). Legal and regulatory reforms adopted. Stakeholders reached by public outreach efforts. Personnel trained. Rural land service offices installed and functioning (Services Fonciers Ruraux). Rural hectares formalized. Extent of confidence in land tenure security. Agriculture Development Project $141,910,059 Expand the productive use of land in order to increase the volume and value of agricultural production in project zones $63,201,001 New irrigated perimeters developed in Di (hectares). Value of contracts for irrigation systems works disbursed. Start Printed Page 31601 Water Users' Associations leaders trained in the Sourou. Farmers trained. Households that have applied improved techniques. Agro-sylvo-pastoral groups that receive technical assistance. Loans provided by the rural finance facility. Volume of loans made to end borrowers by participating financial institutions using Rural Finance Facility funds ($ million). Bright II Schools Project $26,582,359 Increase primary school completion rates $ 26,840,570 Girls and boys graduating from BRIGHT II primary schools. Percent of girls regularly attending (90 percent attendance) BRIGHT II schools. Girls enrolled in the MCC/USAID-supported BRIGHT II schools. Boys enrolled in the MCC/USAID-supported BRIGHT II schools. Educational facilities constructed or rehabilitated. Teachers trained through 10 provincial workshops. Program Administration 3 and Control, Monitoring and Evaluation $56,138,546 $36,404,898 Pending Subsequent Report 4 $583,505 Start Printed Page 31602Projects Obligated Objective Cumulative Disbursements Measures Country: Cape Verde Year: 2013 Quarter 2 Total Obligation: $66,230,000 Entity to which the assistance is provided: MCA Cape Verde Total Quarterly Disbursements: $336,963 Land Management for Investment Projects $17,260,000 Increased investments in and value of property; improved ease of doing business; increased investments and value added in tourism; increased employment $227,964 Number of legal and regulatory reforms adopted. Number of stakeholders receiving formal on the job training or technical assistance regarding roles, responsibilities or new technologies. Field test of “Fieldwork Operations Manual” and methodology completed on Sal. Water, Sanitation, and Hygiene Project $41,030,000 Increased access to improved water and sanitation; reduced household costs for water; reduced incidence of waterborne disease; improved capital accumulation; increase productive government spending $ 4,254 Value of implicit subsidy reduction. Service coverage by corporatized utilities (percent). Operating cost coverage (percent) (operational revenue/annual operating costs). Continuity of service (average hours of service per day for water supply). Objective measure of water quality (randomized water samples, fecal coliform counts, number per 100 mL). Non-revenue water for Multiple Municipal Utility(s). Individuals adopting improved WASH behaviors and practices (percent). Value of signed water and sanitation construction contracts. Percent disbursed of water and sanitation construction contracts. Program Administration and Control $6,550,000 $711,678 Program Monitoring and Evaluation $1,390,000 $2,536 Not Applicable $100,992 Projects Obligated Objective Cumulative Disbursements Measures 2 Country: El Salvador Year: 2013 Quarter 2 Total Obligation: $449,566,762 Entity to which the assistance is provided: MCA El Salvador Total Quarterly Disbursements 1: $332,435 Human Development Project $84,210,866 Increase human and physical capital of residents of the Northern Zone to take advantage of employment and business opportunities $84,210,865 Non-formal trained students that complete the training. Students participating in MCC-supported education activities. Additional school female students enrolled in MCC-supported activities. Instructors trained or certified through MCC-supported activities. Educational facilities constructed/rehabilitated and/or equipped through MCC-supported activities. Households with access to improved water supply. Households with access to improved sanitation. Persons trained in hygiene and sanitary best practices. Households benefiting with a connection to the electricity network. Households benefiting with the installation of isolated solar systems. Kilometers of new electrical lines with construction contracts signed. Population benefiting from strategic infrastructure (number of people). Connectivity Project $270,051,380 Reduce travel cost and time within the Northern Zone, with the rest of the country, and within the region $270,051,380 Average annual daily traffic on the Northern Transnational Highway. Travel time from Guatemala to Honduras through the Northern Zone (hours and minutes). Kilometers of roads completed. Productive Development Project $65,973,922 Increase production and employment in the Northern Zone $65,973,922 Employment created (number of jobs). Investment in productive chains by selected beneficiaries (US $). Hectares under production with MCC support. Beneficiaries of technical assistance and training. Amount of Investment Support Fund (FIDENORTE) approved. Value of agricultural loans to farmers/agribusiness. Value of loans guaranteed. Guarantees granted. Program Administration 3 and Control, Monitoring and Evaluation $29,330,595 $29,982,435 Pending Subsequent Report 4 Projects Obligated Objective Cumulative Expenditures Measures Country: Georgia 5 Year: 2013 Quarter 2 Total Obligation: $387,178,520 Entity to which the assistance is provided: MCA Georgia Total Quarterly Disbursements 1: $0 Regional Infrastructure Rehabilitation Project $309,899,714 Key Regional Infrastructure Rehabilitated $309,899,714 Household savings from Infrastructure Rehabilitation Activities. Savings in vehicle operating costs (VOC). International roughness index (IRI). Start Printed Page 31603 Annual average daily traffic (AADT). Travel Time. Kilometers of road completed. Signed contracts for feasibility and/or design studies. Percent of contracted studies disbursed. Kilometers of roads under design. Signed contracts for road works. Kilometers of roads under works contracts. Sites rehabilitated (phases I, II, III)—pipeline. Construction works completed (phase II)—pipeline. Savings in household expenditures for all RID subprojects. Population Served by all RID subprojects. RID Subprojects completed. Value of Grant Agreements signed. Value of project works and goods contracts Signed. Subprojects with works initiated. Regional Enterprise Development Project $52,040,800 Enterprises in Regions Developed $52,040,699 Jobs Created by Agribusiness Development Activity (ADA) and by Georgia Regional Development Fund (GRDF). Household net income—ADA and GRDF. Jobs created—ADA. Firm income—ADA. Household net income—ADA. Beneficiaries (direct and indirect)—ADA. Grant agreements signed—ADA. Increase in gross revenues of portfolio companies. Increase in portfolio company employees. Increase in wages paid to the portfolio company employees. Portfolio companies. Funds disbursed to the portfolio companies. Program Administration2, Due Diligence, Monitoring and Evaluation $25,238,005 $25,238,005 Pending subsequent reports3 $101 Projects Obligated Objective Cumulative Disbursements Measures 2 Country: Ghana Year: 2013 Quarter 2 Total Obligation: $547,009,001 Entity to which the assistance is provided: MCA Ghana Total Quarterly Disbursements 1: $3,218,877 Agriculture Project $195,650,409 Enhance profitability of cultivation, services to agriculture and product handling in support of the expansion of commercial agriculture among groups of smallholder farms $188,504,431 Farmers trained in commercial agriculture. Additional hectares irrigated. Hectares under production. Kilometers of feeder road completed. Percent of contracted feeder road works disbursed. Value of loans disbursed to clients from agriculture loan fund Portfolio-at-risk of Agriculture Loan Fund (percent). Cooling facilities installed. Percent of contracted irrigation works disbursed. Total parcels registered in the Pilot Land Registration Areas. Volume of products passing through post-harvest treatment. Start Printed Page 31604 Rural Development Project $76,030,565 Strengthen the rural institutions that provide services complementary to, and supportive of, agricultural and agriculture business development $75,903,274 Students enrolled in schools affected by Education Facilities Sub-Activity. Additional female students enrolled in schools affected by Education Facilities Sub-Activity. Individuals completing internships at Ministries, Departments and Agencies and Metropolitan, Municipal and District Assemblies. Schools rehabilitated. School blocks constructed. Distance to collect water. Households with access to improved water supply. Water points constructed. Kilometers of electricity lines identified and diligence. Inter-bank transactions. Rural banks automated under the Automation/Computerization and Interconnectivity of Rural Banks activity. Rural banks connected to the wide area network. Transportation Project $227,748,133 Reduce the transportation costs affecting agriculture commerce at sub-regional levels $224,364,904 Agricultural processing plants in target districts with electricity due to Rural Electrification Sub-Activity. N1 Highway: annualized average daily traffic. N1 Highway: kilometers of road upgraded. Trunk roads kilometers of roads completed. Percent of contracted trunk road works disbursed. Ferry Activity: annualized average daily traffic vehicles. Ferry Activity: annual average daily traffic (passengers). Percent of contracted road works disbursed: N1 Highway, Lot 2. Percent of contracted road works disbursed: N1 Highway, Lot 2. Percent of contracted work disbursed: ferry and floating dock. Percent of contracted work disbursed: landings and terminals. Program Administration 3, Due Diligence, Monitoring and Evaluation $47,579,894 $43,816,360 Pending subsequent reports 4 $3,700,000 The negative disbursement relates to a return of funds to MCC upon MCA Ghana's closing. Projects Obligated Objective Cumulative Disbursements Measures 2 Country: Jordan Year: 2013 Quarter 2 Total Obligation: $275,100,000 Entity to which the assistance is provided: MCA Jordan Total Quarterly Disbursements 1: $7,757,405 Network water consumption per capita (residential and non-residential); liters/capita/day. Zarqa Governorate Operating cost coverage—Water Authority Jordan Zarqa. Non-revenue water (percent). Continuity of supply time; hours per week. Restructure and rehabilitate primary and secondary pipelines (kilometers). Restructure and rehabilitate tertiary pipelines (kilometers). Value disbursed of water construction contracts—Infrastructure Activity and Water Smart Homes Activity. Number of National Aid Fund households with improved water and wastewater network. Start Printed Page 31605 Wastewater Network Project $54,274,261 Improve the overall waste water system efficiency in Jordan's Zarqa Governorate $5,510,980 Sewer blockage events (annual). Volume of wastewater collected; cubic meters/year/million. Residential population connected to the sewer system. Expand Network (kilometers). Value disbursed of sanitation construction contracts. As Samra Wastewater Treatment Plant Expansion Project $98,703,598 Increase the volume of treated waste water available as a substitute for fresh water in agriculture use $26,358,889 Treated wastewater used in agriculture (as a percent of all water used for irrigation in Northern and Middle Jordan Valley). Value disbursed of construction contracts. Total engineering, procurement and construction cost of As-Samra Expansion. Program Administration 3 and Control, Monitoring and Evaluation $19,552,107 $1,131,364 Pending subsequent reports 4 $60,545 Start Printed Page 31606Projects Obligated Objective Cumulative Disbursements Measures 2 Country: Lesotho Year: 2013 Quarter 2 Total Obligation: $362,551,000 Entity to which the assistance is provided: MCA Lesotho Total Quarterly Disbursements 1: $19,499,883 Water Project $167,886,999 Improve the water supply for industrial and domestic needs, and enhance rural livelihoods through improved watershed management $102,736,452 Physical completion of Metolong water treatment works contract (percent). Physical completion of Urban Water supply works contracts (percent). People with access to rural water supply. Ventilated improved pit latrines built. Households with provisions to connect to water networks. Non-revenue water (percent). Knowledge of good hygiene practices (percent). Water points constructed. Health Project $121,377,822 Increase access to life-extending antiretroviral therapy and essential health services by providing a sustainable delivery platform $84,177,336 People with HIV still alive 12 months after initiation of treatment. Health centers with required staff complement (full-time employees). Tuberculosis notification (per 100,000 people). Health centers equipped. Deliveries conducted in the health facilities. Physical completion of health center facilities (percent). Physical completion of outpatient departments (percent). Physical completion of the Botsabelo facilities (percent). Private Sector Development Project $27,386,470 Stimulate investment by improving access to credit, reducing transaction costs and increasing the participation of women in the economy. $18,926,853 Time required to resolve commercial disputes (number of days). Cases filed at the commercial court. Debit/smart cards issued. Bonds registered. Urban land parcels regularized and registered. People trained on gender equality and economic rights. Stakeholders trained. Change in time for property transactions (percent). Women holding titles to land. Program Administration 3 and Control, Monitoring and Evaluation $45,899,709 $33,093,336 Pending Subsequent Report 4 $392,606 Projects Obligated Objective Cumulative Disbursements Measures 2 Country: Mali Year: 2013 Quarter 2 Total Obligation: $435,628,223 Entity to which the assistance is provided: MCA Mali Total Quarterly Disbursements 1: $0 Bamako-Senou Airport Improvement Project $143,403,391 $143,403,391 Annual foreign visitors, non-residents. Percent of work completed on the airside infrastructure. Percent of work completed on the landside infrastructure. Security and safety deficiencies corrected at the airport. Alatona Irrigation Project $252,895,691 Increase the agricultural production and productivity in the Alatona zone of the Office du Niger $252,895,691 Cultivation intensity during the dry season (percent). Value of agricultural products sold by farmers (millions of francs CFA). Percent of works completed on Niono-Goma Coura road. Hectares under new irrigation. Percent of contracted irrigation construction works disbursed. Market gardens allocated in Alatona zones to populations affected by the project or New Settler women. Five-hectare farms distributed to new settlers. Rural hectares formalized. Net primary school enrollment rate (in Alatona zone). Functional producer organization. Hectares under production (rainy season). Hectares under production (dry season). Organisation d'exploitation des reseaux secondaires or water user associations established. Active microfinance institution clients. Industrial Park Project $2,637,472 Terminated $2,637,472 Program Administration 3 and Control, Monitoring and Evaluation $36,691,668 $36,691,668 Pending Subsequent Report 4 On May 4, 2012, the MCC Board of Directors concurred with the recommendation of MCC to terminate the Mali Compact following the undemocratic change of government in the country. Projects Obligated Objective Cumulative Disbursements Measures 2 Country: Moldova Year: 2013 Quarter 2 Total Obligation: $262,000,000 Entity to which the assistance is provided: MCA Moldova Total Quarterly Disbursements 1: $6,168,932 Road Rehabilitation Project $132,840,000 Enhance transportation conditions $16,447,783 Reduced cost for road users. Average annual daily traffic. Road maintenance expenditure. Kilometers of roads completed. Percent of contracted roads works disbursed. Children participants in the road safety trainings. Resettlement action plans implemented. Final design (date received). Trafficking in persons training participants. Transition to High Value Agriculture Project $101,773,402 Increase incomes in the agricultural sector; create models for transition to high value agriculture in centralized irrigation system areas and an enabling environment (legal, financial and market) for replication $14,944,816 Hectares under improved or new irrigation. Centralized irrigation systems rehabilitated. Percent of contracted irrigation feasibility and/or design studies disbursed. Start Printed Page 31607 Value of irrigation feasibility and/or detailed design contracts signed. Water user associations achieving financial sustainability. Management transfer agreements signed. Revised water management policy framework—with long-term water rights defined—established. Contracts of association signed. New HVA (High Value Agriculture) infrastructure in place (metric tonnes of cold storage capacity). Loans past due. Value of agricultural and rural loans. Loan borrowers. Loan borrowers (female). Value of sales facilitated. Farmers that have applied improved techniques (Growing High Value Agriculture Sales [GHS]). Farmers that have applied improved techniques (GHS) (female). Farmers trained. Farmers trained (female). Enterprises assisted. Enterprises assisted (female). Program Administration 3 and Monitoring and Evaluation $27,386,598 $7,532,575 Pending Subsequent Report 4 $93,201 Projects Obligated Objective Cumulative Disbursements Measures 2 Country: Mongolia Year: 2013 Quarter 2 Total Obligation: $284,911,363 Entity to which the assistance is provided: MCA Mongolia Total Quarterly Disbursements 1: $8,095,943 Property Rights Project $27,802,619 Increase security and capitalization of land assets held by lower-income Mongolians, and increased peri-urban herder productivity and incomes $22,501,193 Wells completed. Legal and regulatory reforms adopted. Stakeholders trained (Peri-Urban and Land Plots). Herder groups limiting their livestock population to the carrying capacity of their leases on semi-intensive farms. Cost for property transactions (first time) (US $). Urban parcels formalized. Stakeholders trained (Ger Area Land Plots). Leaseholds Awarded. Vocational Education Project $46,946,824 Increase employment and income among unemployed and underemployed Mongolians $42,796,523 Students participating in MCC-supported educational facilities. Nongovernmental funding of vocational education (percent). Instructors trained or certified through MCC-supported activities. Educational facilities constructed/rehabilitated or equipped through MCC-supported activities. Health Project $39,525,259 Increase the adoption of behaviors that reduce noncommunicable diseases and injuries (NCDIs) among target populations and improved medical treatment and control of NCDIs $30,030,971 Screening for hypertension (percent). Early detections of cervical cancer—early diagnosis. Training of health staff by MCA Mongolia. Improved services in Non-Communicable Disease-Primary Health Care facilities (percent). Roads Project $88,440,123 More efficient transport for trade and access to services $39,893,934 Kilometers of roads completed. Kilometers of roads under design. Percent of contracted roads works disbursed. Energy and Environmental Project $44,828,019 Increased wealth and productivity through greater fuel use efficiency and decreasing health costs from air $38,905,090 Wind power dispatched from substation (million kilowatt hours). Heat only boilers sites upgraded. Stoves distributed by MCA Mongolia. Start Printed Page 31608 Rail Project $369,560 Terminated $369,560 Terminated. Program Administration 3 and Control, Monitoring and Evaluation $36,998,960 $27,240,540 Pending subsequent reports 4 $103,174 Projects Obligated Objective Cumulative Disbursements Measures 2 Country: Morocco Year: 2013 Quarter 2 Total Obligation: $697,500,000 Entity to which the assistance is provided: MCA Morocco Total Quarterly Disbursements 1: $62,081,670 Fruit Tree Productivity Project $337,737,281 Reduce volatility of agricultural production and increase volume of fruit agricultural production $238,600,706 Farmers trained. Olive and date producers assisted. Percent of virgin and extra virgin olive oil of total olive oil production in targeted areas. Number of Catalyst Fund proposals approved. Disbursements under the Catalyst Fund (US $). Average agricultural revenue per farm in rehabilitation rain-fed areas (U.S. dollars). Area planted and delivered to farmers (hectares). Area in expansion perimeters for which water and soil conservation measures have been implemented (hectares). Yield of rehabilitated olive trees in rain-fed areas (metric tons per hectare) (“mt/ha”). Average agricultural revenue per farm in irrigated areas. Cumulative area of irrigated perimeters rehabilitated (hectares). Yield of rehabilitated olive trees in irrigated areas (mt/ha). Average agricultural revenue per farm in oasis areas. Hectares under improved irrigation. Yield of rehabilitated date palms in oasis areas (mt/ha). Number of in-vitro seedlings successfully planted. Small Scale Fisheries Project $124,916,716 Improve quality of fish moving through domestic channels and assure the sustainable use of fishing resources $69,431,892 Boats benefitting from landing sites and ports. Number of artisan fishers who received a training certificate. Number of jobs created in wholesale fish markets. Per capita fish consumption in areas of new market construction (kg/year). Active mobile fish vendors trained and equipped by the project. Average price of fish at auction markets. Net annual income of mobile fish vendors. Artisan and Fez Medina Project $95,529,344 Increase value added to tourism and artisan sectors $44,556,090 Total receiving literacy training. Graduates of MCC-supported functional literacy program (female). Graduates of MCC-supported functional literacy program (male). Total receiving professional training. Start Printed Page 31609 Females receiving professional training. Graduates vocational training program (residential, apprenticeship and continuing education). Drop-out rates of participants of residential and apprenticeship programs. Potters trained. MCC-subsidized gas kilns bought by artisans. Adoption rate of improved production practices promoted by the project (percent). Tourist circuits improved or created. Number of small and medium enterprises (SMEs) that append the label on their products. Number of SMEs participating in promotion events. Sites constructed or rehabilitated (4 Fondouks, Place Lalla Ydouna, Ain Nokbi). Beneficiaries of Ain Nokbi construction and artisan resettlement program. Enterprise Support Project $15,124,722 Improved survival rate of new small and medium enterprises (SMEs) and National Initiative for Human Development (INDH)-funded income generating activities; increased revenue for new SMEs and INDH-funded income generating activities $14,479,013 Survival rate after two years (percent). Days of individual coaching (total days). Beneficiaries trained. Financial Services Project $42,633,565 To be determined $29,768,858 Portfolio at risk at 30 days (percent). Value of loans granted through mobile branches (U.S. dollars). Clients of microcredit associations reached through mobile branches. Value of loan agreements between Micro credit associations and Jaida (millions of dirhams). Value of loan disbursements to Jaida. Program Administration 3 and Control, Monitoring and Evaluation $81,558,382 $56,104,881 Pending Subsequent Report 4 Projects Obligated Objective Cumulative Disbursements Measures 2 Country: Mozambique Year: 2013 Quarter 2 Total Obligation: $506,924,053 Entity to which the assistance is provided: MCA Mozambique Total Quarterly Disbursements 1: $37,595,260 Water Supply and Sanitation Project $207,385,393 Increase access to reliable and quality water and sanitation facilities $122,740,900 Value of municipal sanitation and drainage systems construction contracts signed. Amount disbursed for municipal sanitation and drainage construction contracts. Volume of water produced. Value of contracts signed for construction of water systems. Percent of construction contract disbursed for water systems. Rural water points constructed. Percent of rural population of the six intervention districts with access to improved water sources. Amount disbursed for rural water points construction contracts. Persons trained in hygiene and sanitary best practices. Road Rehabilitation Project $176,307,480 Increase access to productive resources and markets $76,178,321 Percent of roads works contracts disbursed. Kilometers of roads issued “Take-over Certificates”. Start Printed Page 31610 Land Tenure Project $40,068,307 Establish efficient, secure land access for households and investors $28,762,316 People trained (paralegal courses at Centre for Juridical and Judicial Training, general training at National Directorate of Land and Forest, etc.). Land administration offices established or upgraded. Rural hectares mapped. Urban parcels mapped. Rural hectares formalized. Urban parcels formalized. Communities delimited. Farmer Income Support Project $19,250,117 Improve coconut productivity and diversification into cash crop $15,733,113 Coconut seedlings planted. Survival rate of coconut seedlings (percent). Hectares of alternate crops under production. Farmers trained in surveillance and pest and disease control for coconuts. Farmers trained in alternative crop production and productivity enhancing strategies. Farmers trained in planting and post-planting management of coconuts. Farmers using alternative crop production and productivity enhancing strategies. Businesses receiving Business Development Fund grants. Program Administration 3 and Control, Monitoring and Evaluation $63,912,756 $37,699,449 Pending Subsequent Report 4 $1,696,023 Projects Obligated Objective Cumulative Disbursements Measures 2 Country: Namibia Year: 2013 Quarter 2 Total Obligation: $304,477,815 Entity to which the assistance is provided: MCA Namibia Total Quarterly Disbursements 1: $14,957,484 Education Project $141,602,809 Improve the quality of the workforce in Namibia by enhancing the equity and effectiveness of basic $68,755,417 Learners (any level) participating in the 47 schools sub-activity. Educational facilities constructed, rehabilitated, equipped in the 47 schools sub-activity. Percent of contracted construction works disbursed for 47 schools. Textbooks delivered. Educators trained to be textbook management trainers. Educators trained to be textbook utilization trainers. Percent disbursed against works contracts for Regional Study Resource Centers Activity. Visits to MCA Namibia assisted Regional Study and Resource Centres. Compliance rate for National Training Fund (NTF) levy. Graduates from MCC-supported education activities. Percent disbursed against construction, rehabilitation, and equipment contracts for Community Skills and Development Centres. Namibia Student Financial Assistance Fund Policy in place (date). Tourism Project $68,631,170 Grow the Namibian tourism industry with a focus on increasing income to households in communal $18,976,380 Tourists to Etosha National Park (ENP). Galton Gate Plan implemented (percent). Percent disbursed against construction, rehabilitation and equipment contracts for ENP housing units/management structures. Number of game translocated with MCA Namibia support. Start Printed Page 31611 Unique visits on Namibia Tourism Board website. Leisure tourist arrivals. North American tourism businesses (travel agencies and tour operators) that offer Namibian tours or tour packages. Value of grants issued by the conservancy grant fund (Namibian dollars). Amount of new private sector investment secured by MCA Namibia assisted conservancies (Namibian dollars). Annual gross revenue to conservancies receiving MCA Namibia assistance. Agriculture Project Enhance the health and marketing efficiency of livestock in the NCAs of Namibia and to increase income Participating households registered in the Community-Based Rangeland and Livestock Management sub-activity. Grazing areas with documented combined management plans. Parcels corrected or incorporated in land system. Stakeholders trained. Cattle tagged with radio frequency identification tags. Percent disbursed against works contracts for State Veterinary Offices. Value of grant agreements signed under Livestock Market Efficiency Fund. Farmers trained. Value of grant agreements signed under Indigenous Natural Product Innovation Fund. Program Administration 3 and Control, Monitoring and Evaluation $42,957,491 $23,850,449 Pending Subsequent Report 4 $2,212,249 Projects Obligated Objective Cumulative Disbursements Measures 2 Country: Philippines Year: 2013 Quarter 2 Total Obligation: $433,910,000 Entity to which the assistance is provided: MCA Philippines Total Quarterly Disbursements 1: $18,335,082 Kalahi-CIDSS Project Improve the responsiveness of local governments to community needs, encourage communities to engage in development activities Percent of Municipal Local Government Units that provide funding support for Kalahi-CIDSS (KC) subproject operations and maintenance. Completed KC subprojects implemented in compliance with technical plans and within schedule and budget. Barangays that have completed specific training on subproject management and implementation. Secondary National Roads Development Project $214,493,000 Reduce transportation costs and improve access to markets and social services $27,440,528 Kilometers of road sections completed. Bridges replaced. Bridges rehabilitated. Value of road construction contracts signed. Value of road construction contracts disbursed. Revenue Administration Reform Project $54,300,000 Increase tax revenues over time and support the Department of Finance's initiatives to detect and deter corruption within its revenue agencies $4,543,663 Number of Audits. Revenue District Offices using the electronic tax information system. Percent of audit completed in compliance with prescribed period of 120 days. Percent of audit cases performed using automated audit tool. Successful case resolutions. Personnel charged with graft, corruption, lifestyle and/or criminal cases. Time taken to complete investigation (average). Program Administration 3 and Control, Monitoring and Evaluation $45,117,000 $7,563,152 Pending Subsequent Reports 4 $2,729,195 Community Development Grants Project $120,000,000 $9,775,519.47 Start Printed Page 31612 Pending Subsequent Reports 4 $4,550,234 Start Printed Page 31613Projects Obligated Objective Cumulative Disbursements Measures 2 Country: Senegal Year: 2013 Quarter 2 Total Obligation: $540,000,000 Entity to which the assistance is provided: MCA Senegal Total Quarterly Disbursements 1: $29,626,253 Road Rehabilitation Project $324,705,422 Expand access to markets and services $29,656,839 Value of contracts signed for the feasibility, design, supervision and program management of the RN2 and RN6 National Roads. Percent of disbursements for the contract signed for the constructions of the RN 2 and RN6. Kilometers of roads rehabilitated on the RN2. Annual Average Daily Traffic (AADT) Richard-Toll—Ndioum. Percent change in travel time on the RN2. International Roughness Index on the RN2. Kilometers of roads covered by the contract for the studies, the supervision and management of the RN2. Kilometers of roads rehabilitated on the RN6. Annual Average Daily Traffic (AADT) Ziguinchor—Tanaff. Annual Average Daily Traffic (AADT) Tanaff—Kolda. Annual Average Daily Traffic (AADT) Kolda—Kounkané. Percent change in travel time on the RN6. International Roughness Index on the RN6 (lower number = smoother road). Kilometers of roads covered by the contract for the studies, the supervision and management of the RN6. Irrigation and Water Resources Management Project $170,008,860 Improve productivity of the agricultural sector $3,396,533 Tons of irrigated rice production. Potentially irrigable lands area (Delta and Ngallenka). Hectares under production. Percent of the disbursements on the contracts signed for the studies in the Delta and the Ngallenka. Value of the construction contracts signed for the irrigation infrastructure in the Delta and the Ngallenka. Cropping intensity (hectares under production per year/cultivable hectares) (Delta and Ngallenka). Hectares mapped. New conflicts resolved (percent). People trained on land security tools. Women trained on land security tools. Program Administration 3 and Monitoring and Evaluation $45,285,718 $11,773,489 Pending Subsequent Report 4 $819,236 Projects Obligated Objective Cumulative Disbursements Measures 2 Country: Tanzania Year: 2013 Quarter 2 Total Obligation: $698,135,990 Entity to which the assistance is provided: MCA Tanzania Total Quarterly Disbursements 1: $37,330,101 Energy Sector Project $207,821,396 Increase value added to businesses $150,742,745 Number of current power customers (Zanzibar). Transmission and distribution substations capacity (megawatt-peak) (Zanzibar). Technical and non-technical losses (Zanzibar) (percent). Kilometers of 132 kilovolt (KV) lines constructed (Zanzibar). Percent disbursed on overhead lines contract (Zanzibar). Number of Current power customers (Malagarasi/Kigoma). Capacity of systems installed (kilowatt-peak) (Malagarasi/Kigoma). Current power customers (all six project regions) (Mainland). Kilometers of 132 KV lines constructed (Mainland). Kilometers of 33/11KV lines constructed(Mainland). Transmission and distribution substations capacity (Megavolt Ampere) (all six project regions) (Mainland). Technical and nontechnical losses (Mainland) (percent). Cost recovery ratio (Mainland). Transport Sector Project $372,638,379 Increase cash crop revenue and aggregate visitor spending $222,253,662 Percent disbursed on construction contracts. Surfacing complete: Tunduma—Sumbawanga (percent). Surfacing complete: Tanga—Horohoro (percent). Surfacing complete: Namtumba—Songea (percent). Surfacing complete: Permiho—Mbinga (percent). Kilometers of roads completed (taken over). Pemba: Percent disbursed on construction contract. Surfacing complete: Pemba (percent). Kilometers of roads completed (taken over): Zanzibar. Road maintenance expenditures: Mainland trunk roads (percent). Road maintenance expenditures: Zanzibar rural roads (percent). Runway surfacing complete (percent). Water Sector Project $65,692,145 Increase investment in human and physical capital and to reduce the prevalence of water-related disease $40,756,921 Volume of water produced—Lower Ruvu (millions of liters per day). Operations and maintenance cost recovery—Lower Ruvu (percent). Volume of water produced—Morogoro (millions of liters per day). Operations and maintenance cost recovery—Morogoro (percent). Program Administration 3 and Control, Monitoring and Evaluation $51,984,071 $28,763,895 Pending Subsequent Report 4 End Preamble619(b) Transfer or Allocation of Funds United States agency to which funds were transferred or allocated Amount Description of program or project None None None 1 Disbursements are cash outlays rather than expenditures. 2 These measures are the same Key Performance Indicators that MCC reports each quarter. The Key Performance Indicators may change over time to more accurately reflect compact implementation progress. The unit for these measures is “a number of” unless otherwise indicated. 3 Program administration funds are used to pay items such as salaries, rent, and the cost of office equipment. 4 These amounts represent disbursements made that will be allocated to individual projects in the subsequent quarter(s) and reported as such in subsequent quarterly report(s). 5 These compacts are closed; however, deobligations took place during the reporting period.Start Printed Page 31614 The following MCC compacts are closed and, therefore, do not have any quarterly disbursements: Benin, Cape Verde I, Honduras, Madagascar, Nicaragua and Vanuatu. [FR Doc. 2013-12371 Filed 5-23-13; 8:45 am]
BILLING CODE 9211-03-P
Document Information
- Comments Received:
- 0 Comments
- Published:
- 05/24/2013
- Department:
- Millennium Challenge Corporation
- Entry Type:
- Notice
- Document Number:
- 2013-12371
- Pages:
- 31599-31614 (16 pages)
- Docket Numbers:
- MCC FR 13-03
- PDF File:
- 2013-12371.pdf