    NUCLEAR REGULATORY COMMISSION
    [Docket No. 50-397]
    
     
    
    Washington Public Power Supply System; WPPSS Nuclear Project No. 
    2 Environmental Assessment and Finding of No Significant Impact
    
        The U.S. Nuclear Regulatory Commission (the Commission) is 
    considering issuing an exemption from the requirements of Appendix J to 
    10 CFR Part 50 in response to a Washington Public Power Supply System 
    (the licensee) request for the WNP-2 nuclear plant, located in Benton 
    County, Washington.
    
    Environmental Assessment
    
    Identification of Proposed Action
    
        The proposed action would grant an exemption from the requirement 
    of Section III.D.3 of 10 CFR part 50, Appendix J for Type C testing of 
    new containment purge supply and exhaust valves with metallic seats 
    each refueling shutdown. It would extend the maximum interval for Type 
    C testing from 24 months to 27 months for these valves. The proposed 
    action is in accordance with the licensee's March 25, 1994, exemption 
    request.
    
    The Need for the Proposed Action
    
        The licensee needs the proposed exemption because the present 
    requirement forces the licensee to test the new metal-to-metal seated 
    containment purge supply and exhaust valves at least every 24 months. 
    Testing these valves every 27 months does not increase the risk to 
    public health and safety and accommodates the unique WNP-2 refueling 
    schedule.
    
    Environmental Impacts of the Proposed Action
    
        The proposed exemption would not adversely affect primary 
    containment integrity. Thus, it would not increase the potential for 
    radiological releases to the environment in the event of a severe plant 
    transient or hypothetical accident, including a fuel handling accident 
    or design basis accident. Calculated offsite radiological doses at the 
    plant exclusion boundary and low population zone outer boundary will 
    continue to meet 10 CFR part 100 criteria.
        The licensee indicated that industry experience shows the new 
    valves are capable of maintaining design leakage requirements over an 
    extended time. The licensee also indicated that they will require the 
    replacement valves to meet even tighter permissible leakage limits. 
    Extending the maximum allowable interval between tests to 27 months 
    allows for variations in the approximately annual operating cycle 
    length due to weather. Issuing this exemption will not increase 
    accident probability or result in any environmental impacts beyond 
    those evaluated in the WNP-2 Final Environmental Statement. Therefore, 
    the proposed changes do not increase the probability or consequences of 
    accidents, no changes are being made in the types of any effluents that 
    may be released offsite, and there is no significant increase in the 
    allowable individual or cumulative occupational radiation exposure. 
    Accordingly, the Commission concludes that this proposed action would 
    result in no significant radiological environmental impact.
        With regard to potential nonradiological impacts, the proposed 
    exemption does not affect nonradiological plant effluents and has no 
    other environmental impact. Therefore, the Commission concludes that 
    there are no significant nonradiological environmental impacts 
    associated with the proposed exemption.
        The Notice of Consideration of Issuance of Amendment to Facility 
    Operating License, Proposed No Significant Hazards Consideration 
    Determination, and Opportunity for a Hearing in connection with this 
    action was published in the Federal Register on March 30, 1994 (59 FR 
    14901). No request for hearing or petition for leave to intervene was 
    filed following this notice.
    
    Alternative to the Proposed Action
    
        Any alternative with equal or greater environmental impact does not 
    need to be evaluated since the Commission has concluded that the 
    environmental effects of the proposed action are not significant.
        The principal alternative would be to deny the requested exemption. 
    This would not reduce the facility's environmental impact, and would 
    result in a larger expenditure of licensee resources to test 
    containment purge and exhaust valves.
    
    Alternative Use of Resources
    
        This action does not use resources not previously considered in the 
    Final Environmental Statement related to operation of the Washington 
    Nuclear Project, Unit No. 2 dated December 1981.
    
    Agencies and Persons Consulted
    
        The Commission's staff reviewed the licensee's request and 
    consulted the Washington State official. The state official had no 
    comments.
    Finding of No Significant Impact
        Based upon the foregoing environmental assessment, the Commission 
    concludes that the proposed action will not have a significant effect 
    on the quality of the human environment. Accordingly, the Commission 
    has determined not to prepare an environmental impact statement for the 
    proposed exemption.
        For further details with respect to this action, see the March 25, 
    1994, request for exemption which is available for public inspection at 
    the Commission's Public Document Room, 2120 L Street, NW., Washington, 
    DC 20555.
    
        Dated at Rockville, Maryland, this 19th day of May 1994.
    
        For the Nuclear Regulatory Commission.
    Theodore R. Quay,
    Director, Project Directorate IV-3, Division of Reactor Projects--III/
    IV, Office of Nuclear Reactor Regulation.
    [FR Doc. 94-12730 Filed 5-24-94; 8:45 am]
    BILLING CODE 7590-01-M
    
    
    

Document Information

Published:
05/25/1994
Department:
Nuclear Regulatory Commission
Entry Type:
Uncategorized Document
Document Number:
94-12730
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: May 25, 1994, Docket No. 50-397