95-12921. CNG Power Services Corporation, et al., Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 60, Number 102 (Friday, May 26, 1995)]
    [Notices]
    [Pages 27970-27973]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-12921]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. EG95-51-000, et al.]
    
    
    CNG Power Services Corporation, et al., Electric Rate and 
    Corporate Regulation Filings
    
    May 19, 1995.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. CNG Power Services Corporation
    
    [Docket No. EG95-51-000]
    
        On May 15, 1995, CNG Power Services Corporation (``CNGPS''), One 
    Park Ridge Center, Box 15746, Pittsburgh, PA 15222, filed with the 
    Federal Energy Regulatory Commission (``Commission'') an application 
    for a new determination of exempt wholesale generator status, due to 
    changed circumstances resulting from certain [[Page 27971]] proposed 
    transactions, pursuant to Part 365 of the Commission's Regulations.
        Comment date: May 30, 1995, in accordance with Standard Paragraph E 
    at the end of this notice. The Commission will limit its consideration 
    of comments to those that concern the adequacy or accuracy of the 
    application.
    
    2. California Department of Water Resources v. Nevada Power Company
    
    [Docket No. EL95-43-000]
    
        Take notice that on May 4, 1995, the California Department of Water 
    Resources (Department) tendered for filing a complaint for refund, plus 
    interest, of the excess transmission charges the Department has paid, 
    under protest, for the period January 1, 1990 under the formula rate 
    submitted by Nevada Power Company as part of its amnesty filing in 
    Docket No. ER94-305-000.
        Comment date: June 19, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    3. Commonwealth Edison Company
    
    [Docket No. ER93-390-001]
    
        Take notice that on May 5, 1995, Commonwealth Edison Company 
    (ComEd) submitted an amendment to the Resource Power Service Schedule 
    to the Interconnection Agreement, dated March 1, 1975, between ComEd 
    and Wisconsin Power and Light Company (Wisconsin Power).
        Copies of this filing were served upon Wisconsin Power, the 
    Illinois Commerce Commission, and the Public Service Commission of 
    Wisconsin.
        Comment date: June 2, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    4. Howell Power Systems
    
    [Docket No. ER94-178-005]
    
        Take notice that on April 25, 1995, Howell Power Systems tendered 
    for filing certain information as required by the Commission's order 
    dated January 14, 1994. Copies of the informational filing are on file 
    with the Commission and are available for public inspection.
    
    5. Concord Electric Company
    
    [Docket No. ER94-692-002]
    
        Take notice that on April 21, 1995, Concord Electric Company 
    tendered for filing its refund report in this docket pursuant to the 
    Commission's letter order issued on March 23, 1995.
        Comment date: June 2, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    6. AES Power, Inc.
    
    [Docket No. ER94-890-005]
    
        Take notice that on May 2, 1995, AES Power, Inc. tendered for 
    filing certain information as required by the Commission's letter order 
    dated April 18, 1994. Copies of the informational filing are on file 
    with the Commission and are available for public inspection.
    
    7. Eastern Power Distribution, Inc.
    
    [Docket No. ER94-964-005]
    
        Take notice that on April 25, 1995, Eastern Power Distribution, 
    Inc. tendered for filing certain information as required by the 
    Commission's letter order dated April 5, 1994. Copies of the 
    informational filing are on file with the Commission and are available 
    for public inspection.
    
    8. Electric Clearinghouse, Inc.
    
    [Docket No. ER94-968-006]
    
        Take notice that on May 2, 1995, Electric Clearinghouse, Inc. filed 
    certain information as required by the Commission's April 7, 1994, 
    letter order. Copies of the informational filing are on file with the 
    Commission and are available for public inspection.
    
    9. Vesta Energy Alternatives Company
    
    [Docket No. ER94-1168-004]
    
        Take notice that on April 25, 1995, Vesta Energy Alternatives 
    Company filed certain information as required by the Commission's 
    orders dated July 8, July 20, November 28 and December 7, 1994 letter 
    orders. Copies of the informational filing are on file with the 
    Commission and are available for public inspection.
    
    10. Ashton Energy Corporation
    
    [Docket No. ER94-1246-003]
    
        Take notice that on April 24, 1995, Ashton Energy Corporation 
    tendered for filing certain information as required by the Commission's 
    order dated August 10, 1994. Copies of the informational filing are on 
    file with the Commission and are available for public inspection.
    
    11. Midcon Power Services Corporation
    
    [Docket No. ER94-1329-003]
    
        Take notice that on April 28, 1995, Midcon Power Services 
    Corporation tendered for filing certain information as required by the 
    Commission's letter order dated August 11, 1994. Copies of the 
    informational filing are on file with the Commission and are available 
    for public inspection.
    
    12. R. J. Dahnke & Association
    
    [Docket No. ER94-1352-003]
    
        Take notice that on May 1, 1995, R.J. Dahnke & Association tendered 
    for filing certain information as required by the Commission's letter 
    order dated August 13, 1994. Copies of the informational filing are on 
    file with the Commission and are available for public inspection.
    
    13. Morgan Stanley Capital Group, Inc.
    
    [Docket No. ER94-1384-005]
    
        Take notice that on April 28, 1995, Morgan Stanley Capital Group, 
    Inc. tendered for filing certain information as required by the 
    Commission's letter order dated November 18, 1994. Copies of the 
    informational filing are on file with the Commission and are available 
    for public inspection.
    14. JEB Corporation
    
    [Docket No. ER94-1432-003]
    
        Take notice that on April 28, 1995, JEB Corporation tendered for 
    filing certain information as required by the Commission's letter order 
    dated September 8, 1994. Copies of the informational filing are on file 
    with the Commission and are available for public inspection.
    
    15. Coastal Electric Services Company
    
    [Docket No. ER94-1450-003]
    
        Take notice that on May 2, 1995, Coastal Electric Services Company 
    filed certain information as required by the Commission's September 29, 
    1994 order. Copies of the informational filing are on file with the 
    Commission and are available for public inspection.
    
    16. Excel Energy Services, Inc.
    
    [Docket No. ER94-1488-003]
    
        Take notice that on May 5, 1995, Excel Energy Services, Inc. 
    tendered for filing certain information as required by the Commission's 
    letter order dated September 29, 1994. Copies of the informational 
    filing are on file with the Commission and are available for public 
    inspection.
    
    17. Calpine Power Marketing Inc.
    
    [Docket No. ER94-1545-001]
    
        Take notice that on May 4, 1995, Calpine Power Marketing Inc. filed 
    certain information as required by the Commission's March 9, 1995, 
    letter order. Copies of the informational filing are on file with the 
    Commission and are available for public inspection.
    
    18. Hadson Electric, Inc.
    
    [Docket No. ER94-1613-002]
    
        Take notice that on May 1, 1995, Hadson Electric, Inc. filed 
    certain information as required by the Commission's November 17, 1994 
    order. Copies of the informational filing are on [[Page 27972]] file 
    with the Commission and are available for public inspection.
    
    19. Texas Ohio Power Marketing, Inc.
    
    [Docket No. ER94-1676-002]
    
        Take notice that on May 16, 1995, Texas Ohio Power Marketing, Inc. 
    tendered for filing certain information as required by the Commission's 
    letter order dated December 2, 1994. Copies of the informational filing 
    are on file with the Commission and are available for public 
    inspection.
    
    20. Associated Power Services, Inc.
    
    [Docket No. ER95-7-003]
    
        Take notice that on April 24, 1995, Associated Power Services, Inc. 
    tendered for filing certain information as required by the Commission's 
    order dated December 16, 1994. Copies of the informational filing are 
    on file with the Commission and are available for public inspection.
    
    21. Wisconsin Electric Power Company
    
    [Docket No. ER95-771-000]
    
        Take notice that Wisconsin Electric Power Company (Wisconsin) 
    tendered for filing on May 16, 1995, an amendment of its filing in the 
    above-referenced docket. The amendment reduces the transmission 
    component of charges for services under FERC Electric Tariff, Original 
    Volume No. II (the Coordination Sales Tariff).
        Wisconsin Electric requests an effective date sixty days after its 
    initial filing in this proceeding.
        Copies of the filing have been served on all customers under the 
    Coordination Sales Tariff, as well as the state commissions in which 
    such customers distribute and sell electric energy.
        Comment date: June 2, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    22. New York State Electric & Gas Corporation
    
    [Docket No. ER95-1012-000]
    
        Take notice that on May 4, 1995, New York State Electric & Gas 
    Corporation (NYSEG), tendered for filing pursuant to Sec. 35.12 of the 
    Federal Energy Regulatory Commission's Rules of Practice and Procedure, 
    18 CFR 35.12, as an initial rate schedule, an agreement with Atlantic 
    City Electric Company (ACE). The agreement provides a mechanism 
    pursuant to which the parties can enter into separately scheduled 
    transactions under which NYSEG will sell to ACE and ACE will purchase 
    from NYSEG either capacity and associated energy or energy only as the 
    parties may mutually agree.
        NYSEG requests that the agreement become effective on May 5, 1995, 
    so that the parties may, if mutually agreeable, enter into separately 
    scheduled transactions under the agreement. NYSEG has requested waiver 
    of the notice requirements for good cause shown.
        NYSEG served copies of the filing upon the New York State Public 
    Service Commission and ACE.
        Comment date: June 2, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    23. Florida Power Corporation
    
    [Docket No. ER95-1013-000]
    
        Take notice that on May 4, 1995, Florida Power Corporation 
    requested the Commission to disclaim jurisdiction over an Operation and 
    Maintenance Agreement with Orange Cogeneration Limited Partnership 
    executed on April 12, 1995. In the alternative, Florida Power 
    Corporation requested that the agreement be accepted for filing and 
    allowed to become effective on July 5, 1995.
        Comment date: June 2, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    24. Public Service Electric and Gas Company
    
    [Docket No. ER95-1014-000]
    
        Take notice that on May 5, 1995, Public Service Electric and Gas 
    Company (PS), tendered for filing Supplemental Agreement Between 
    Atlantic City Electric Company (ACE) and PS amending the original March 
    1, 1969 agreement, as supplemented (PS FERC Rate Schedule No. 43).
        PS states that the reason for the filing is to cover the 
    facilities, cost sharing, and payments associated with supplying 
    service to ACE's Tabernacle Substation.
        PS requests that the filing be permitted to become effective as of 
    the date the Tabernacle supply facilities were placed in service 
    December 20, 1994 and therefore requests waiver of the Commission's 
    notice requirements.
        PS states that a copy of this filing has been sent to ACE and to 
    the New Jersey Board of Public Utilities.
        Comment date: June 2, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    25. Southwestern Public Service Company
    
    [Docket No. ER95-1015-000]
    
        Take notice that on May 5, 1995, Southwestern Public Service 
    Company (Southwestern), tendered for filing the proposed amendments to 
    its rate schedule for service to Lyntegar Electric Cooperative, Inc. 
    (Lyntegar).
        The proposed amendments reflect:
        1. Two new delivery points and a temporary duplicated delivery 
    point with an associated monthly service charge of $178 per month per 
    delivery point;
        2. Changes in the maximum commitment at various delivery points;
        3. A CIAC agreement for a one time charge of $21,988 to recover 
    Southwestern's expense in providing a service to one of the new 
    delivery points;
        4. A CIAC agreement for a one time charge of $13,137 to recover 
    Southwestern's expense in providing a duplicative delivery point; and
        5. Two CIAC agreements for a one time charge totaling $1,970.72 to 
    recover costs Southwestern incurred in modifying its existing 
    facilities to allow proper clearance for Lyntegar's new distribution 
    facilities.
        Comment date: June 2, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    26. Southwestern Public Service Company
    
    [Docket No. ER95-1016-000]
    
        Take notice that on May 5, 1995, Southwestern Public Service 
    Company (Southwestern), tendered for filing proposed amendments to 
    contracts for service to Cap Rock Electric Cooperative, Inc. (Cap 
    Rock).
        The proposed amendments (1) Increases the commitment from 115,000 
    Kw to 120,000 Kw, (2) reduces the Dedicated Segment Charge and 
    Dedicated Facilities Charge, and (3) assigns the contracts to New Corp 
    Resources, Inc. (New Corp).
        Comment date: June 2, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    27. Alabama Power Company
    
    [Docket No. ER95-1019-000]
    
        Take notice that on May 8, 1995, Alabama Power Company tendered for 
    filing a revised Delivery Point Specification Sheet dated as of April 
    20, 1995, reflecting the change in contracted voltage levels for a 
    delivery point for electricity delivery to the City of Piedmont, 
    Alabama. The delivery point will continue to be served under the terms 
    and conditions of the Agreement for Partial Requirements Service and 
    Complementary Services between Alabama Power Company and the Alabama 
    Municipal Electric Authority dated February 24, 1986, being designated 
    as FERC Rate Schedule No. 165. The parties request an effective date of 
    April 20, 1995. [[Page 27973]] 
        Comment date: June 2, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    28. Louisville Gas and Electric Company
    
    [Docket No. ER95-1020-000]
    
        Take notice that on May 8, 1995, Louisville Gas and Electric 
    Company, tendered for filing a copy of a service agreement between 
    Louisville Gas and Electric Company and ENRON Power Marketing, Inc., 
    under Rate GSS.
        Comment date: June 2, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    29. Energy Services, Inc.
    
    [Docket No. ER95-1021-000]
    
        Take notice that on May 8, 1995, Energy Services, Inc. (ESI), 
    tendered for filing Electric Service Rate Schedule No. 1, together with 
    a petition for waivers and blanket approvals of various Commission 
    Regulations necessary for such Rate Schedule to become effective 60 
    days after the date of the filing.
        ESI states that it intends to engage in electric power and energy 
    transactions as a marketer and a broker, and that it proposes to make 
    sales under rates, terms and conditions to be mutually agreed to with 
    the purchasing party. ESI further states that it does not own any 
    generation or transmission facilities.
        Comment date: June 2, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    30. Texas-New Mexico Power Company
    
    [Docket No. ES95-32-000]
    
        Take notice that on May 12, 1995, Texas-New Mexico Power Company 
    filed an application under Sec. 204 of the Federal Power Act seeking 
    authorization to issue short-term promissory notes and other evidence 
    of indebtedness aggregating not more than $25 million principal amount 
    outstanding at any one time, during the period ending June 1, 1997, 
    with final maturities not later than June 1, 1998.
        Comment date: June 12, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    31. Energy Resource Marketing, Inc.
    
    [Docket No. ER94-1580-002]
    
        Take notice that on May 15, 1995, Energy Resource Marketing, Inc. 
    tendered for filing certain information as required by the Commission's 
    order dated September 30, 1994. Copies of the informational filing are 
    on file with the Commission and are available for public inspection.
    
    Standard Paragraphs
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 825 North Capitol Street, NE., Washington, DC 
    20426, in accordance with Rules 211 and 214 of the Commission's Rules 
    of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of this filing are on file with the 
    Commission and are available for public inspection.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 95-12921 Filed 5-25-95; 8:45 am]
    BILLING CODE 6717-01-P
    
    

Document Information

Published:
05/26/1995
Department:
Energy Department
Entry Type:
Notice
Document Number:
95-12921
Dates:
May 30, 1995, in accordance with Standard Paragraph E at the end of this notice. The Commission will limit its consideration of comments to those that concern the adequacy or accuracy of the application.
Pages:
27970-27973 (4 pages)
Docket Numbers:
Docket No. EG95-51-000, et al.
PDF File:
95-12921.pdf