98-13837. Koch Gateway Pipeline Company; Notice of Application to Abandon  

  • [Federal Register Volume 63, Number 100 (Tuesday, May 26, 1998)]
    [Notices]
    [Pages 28501-28502]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-13837]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP98-549-000]
    
    
    Koch Gateway Pipeline Company; Notice of Application to Abandon
    
    May 19, 1998.
        Take notice that on May 14, 1998, Koch Gateway Pipeline Company 
    (Koch), P.O. Box 1478, Houston, Texas 77251-1478, filed under Section 
    7(b) of the Natural Gas Act, for authority to abandon, a certificated 
    interruptible transportation service for Sugar Bowl Gas Corporation 
    (SBGC). The service is Koch's Rate Schedule X-37 in its FERC Gas 
    Tariff, Original Volume No. 2. Koch states that the SBGC sold its 
    assets in 1983 and no longer needs the service. Koch's proposal is more 
    fully set forth in the application which is on file with the Commission 
    and open to public inspection.
        Any person desiring to be heard or make any protest with reference 
    to said application should on or before June 9, 1998, file with the 
    Federal Energy Regulatory Commission, 888 First Street, NE., 
    Washington, DC 20426, a motion to intervene or a protest in accordance 
    with the requirements of the Commission's Rules of Practice and 
    Procedure (18 CFR 385.214 or 385.211) and the regulations under the 
    Natural
    
    [[Page 28502]]
    
    Gas Act (18 CFR 157.10). All protests filed with the Commission will be 
    considered by it in determining the appropriate action to be taken but 
    will not serve to make the protestants parties to the proceeding. Any 
    person wishing to become a party to a proceeding or to participate as a 
    party in any hearing therein must file a motion to intervene in 
    accordance with the Commission's Rules.
        Take further notice that, pursuant to the authority contained in 
    and subject to the jurisdiction conferred upon the Federal Energy 
    Regulatory Commission by Sections 7 and 15 of the Natural Gas Act and 
    the Commission's Rules of Practice and Procedure, a hearing will be 
    held without further notice before the Commission or its designee on 
    this application if no motion to intervene is filed within the time 
    required, or if the Commission on its own review of the matter finds 
    that permission and approval of the proposed abandonment are required 
    by the public convenience and necessity. If a motion for leave to 
    intervene is timely filed, or if the Commission on its own motion 
    believes that a formal hearing is required, further notice of such 
    hearing will be duly given.
        Under the procedure herein provided for, unless otherwise advised, 
    it will be unnecessary for Koch to appear or be represented at the 
    hearing.
    David P. Boergers,
    Acting Secretary.
    [FR Doc. 98-13837 Filed 5-22-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
05/26/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-13837
Pages:
28501-28502 (2 pages)
Docket Numbers:
Docket No. CP98-549-000
PDF File:
98-13837.pdf