[Federal Register Volume 63, Number 100 (Tuesday, May 26, 1998)]
[Notices]
[Pages 28503-28505]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-13879]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER98-1959-000, et al.]
Mississippi Power Company, et al.; Electric Rate and Corporate
Regulation Filings
May 19, 1998.
Take notice that the following filings have been made with the
Commission:
1. Mississippi Power Company
[Docket No. ER98-1959-000]
Take notice that on May 13, 1998, Mississippi Power Company and
Southern Company Services, Inc., its agent, tendered for filing a
Service Agreement, pursuant to the Southern Companies Electric Tariff
Volume No. 4, Market Based Rate Tariff, with South Mississippi Electric
Power Association for the Aleco Fire Tower Road Delivery Point to
Singing River Electric Power Association. The agreement will permit
Mississippi Power to provide wholesale electric service to South
Mississippi Electric Power Association at a new service delivery point.
Copies of the filing were served upon South Mississippi Electric
Power Association, the Mississippi Public Service Commission, and the
Mississippi Public Utilities Staff.
Comment date: June 2, 1998, in accordance with Standard Paragraph E
at the end of this notice.
2. Ameren Services Company
[Docket Nos. ER96-677-005 and ER96-679-005]
Take notice that on May 14, 1998, Ameren Services Company (Ameren
Services), acting on behalf of Union Electric Company and Central
Illinois Public Service Company (Ameren Companies), filed a revised
compliance filing in accordance with the Commission's April 14, 1998,
letter order accepting Ameren Services' February 2, 1998, Open Access
Tariff Compliance Filing but requiring one change to the Tariff, which
Ameren Services has made in the filing.
Comment date: June 3, 1998, in accordance with Standard Paragraph E
at the end of this notice.
3. Lowell Cogeneration Company Limited Partnership
[Docket Nos. ER98-372-002 and ER98-394-002]
Take notice that on May 14, 1998, Lowell Cogeneration Company
Limited Partnership (Lowell), filed a refund compliance report
associated with refund obligations resulting from late filing of
service agreements under Lowell's market-based power sales tariff.
Comment date: June 3, 1998, in accordance with Standard Paragraph E
at the end of this notice.
4. MidAmerican Energy Company
[Docket No. ER98-2410-000]
Take notice that on May 14, 1998, MidAmerican Energy Company
(MidAmerican), 666 Grand Avenue, Des Moines, Iowa 50303 submitted for
filing
[[Page 28504]]
with the Commission a Service Agreement dated March 30, 1998, with the
City of Denver, IA (Denver), entered into pursuant to MidAmerican's
Rate Schedule for Power Sales, FERC Electric Tariff, Original Volume
No. 5 (Tariff), and a Power Sales Agreement dated March 30, 1998, with
the City of Denver, IA, entered into pursuant to the Service Agreement
and the Tariff.
MidAmerican requests an effective date of April 1, 1998, for this
Agreement, and seeks a waiver of the Commission's notice requirement.
MidAmerican has served a copy of the filing on Denver, the Iowa
Utilities Board, the Illinois Commerce Commission and the South Dakota
Public Utilities Commission.
Comment date: June 3, 1998, in accordance with Standard Paragraph E
at the end of this notice.
5. Sovereign Power, Inc.
[Docket No. ER98-2995-000]
Take notice that on May 14, 1998, Sovereign Power, Inc.
(Sovereign), petitioned the Commission for acceptance of Sovereign Rate
Schedule FERC No. 1; the granting of certain blanket approvals,
including the authority to sell electricity at market-based rates; and
the waiver of certain Commission Regulations.
Sovereign intends to engage in wholesale electric power and energy
purchases and sales as a marketer. Sovereign is not in the business of
generating or transmitting electric power.
Comment date: June 3, 1998, in accordance with Standard Paragraph E
at the end of this notice.
6. California Independent System Operator Corporation
[Docket No. ER98-2996-000]
Take notice that on May 14, 1998, the California Independent System
Operator Corporation (ISO), tendered for filing a Participating
Generator Agreement between AES Redondo Beach, L.L.C. (AES Redondo
Beach), and the ISO for acceptance by the Commission.
The ISO states that this filing has been served on AES Redondo
Beach and the California Public Utilities Commission.
Comment date: June 3, 1998, in accordance with Standard Paragraph E
at the end of this notice.
7. California Independent System Operator Corporation
[Docket No. ER98-2997-000]
Take that notice on May 14, 1998, the California Independent System
Operator Corporation (ISO), tendered for filing a Participating
Generator Agreement between AES Alamitos, L.L.C., (AES Alamitos) and
the ISO for acceptance by the Commission.
The ISO states that this filing has been served on AES Alamitos and
the California Public Utilities Commission.
Comment date: June 3, 1998, in accordance with Standard Paragraph E
at the end of this notice.
8. California Independent System Operator Corporation
[Docket No. ER98-2998-000
Take notice that on May 14, 1998, the California Independent System
Operator Corporation (ISO), tendered for filing a Meter Service
Agreement for ISO Metered Entities between the ISO and AES Alamitos,
L.L.C. (AES Alamitos), for acceptance by the Commission.
The ISO states that this filing has been served on AES Alamitos,
and the California Public Utilities Commission.
Comment date: June 3, 1998, in accordance with Standard Paragraph E
at the end of this notice.
9. California Independent System Operator Corporation
[Docket No. ER98-2999-000]
Take notice that on May 14, 1998, the California Independent System
Operator Corporation (ISO), tendered for filing a Meter Service
Agreement for ISO Metered Entities between the ISO and AES Redondo
Beach, L.L.C. (AES Redondo Beach), for acceptance by the Commission.
The ISO states that this filing has been served on AES Redondo
Beach and the California Public Utilities Commission.
Comment date: June 3, 1998, in accordance with Standard Paragraph E
at the end of this notice.
10. California Independent System Operator Corporation
[Docket No. ER98-3000-000]
Take notice that on May 14, 1998, the California Independent System
Operator Corporation (ISO), tendered for filing a Participating
Generator Agreement between AES Huntington Beach, L.L.C. (AES
Huntington Beach) and the ISO for acceptance by the Commission.
The ISO states that this filing has been served on AES Huntington
Beach and the California Public Utilities Commission.
Comment date: June 3, 1998, in accordance with Standard Paragraph E
at the end of this notice.
11. Louisville Gas And Electric Company
[Docket No. ER98-3001-000]
Take notice that on May 14, 1998, Louisville Gas and Electric
Company (LG&E), filed a Notice of Cancellation canceling Non-Firm
Point-to-Point Transmission Service Agreements with Cleveland Electric
Illuminating Company (CEI) and Toledo Edison Company (TE) as requested
by the customer.
Comment date: June 3, 1998, in accordance with Standard Paragraph E
at the end of this notice.
12. Louisville Gas and Electric Company
[Docket No. ER98-3002-000]
Take notice that on May 14, 1998, Louisville Gas and Electric
Company (LG&E), tendered for filing a Consent to Assignment Form
assigning all of the rights associated with the following Transmission
Service Agreements between Louisville Gas and Electric Company (LG&E)
and Southern Energy Trading and Marketing, Inc., to Southern Company
Energy Marketing, L.P.: (1) Non-Firm Transmission Service Agreement
filed with the Commission in Docket No. ER96-2090-000, (2) Short-Term
Point-to-Point Transmission Service Agreement filed with the Commission
in Docket No. ER98-1496-000.
Comment date: June 3, 1998, in accordance with Standard Paragraph E
at the end of this notice.
13. California Independent System Operator Corporation
[Docket No. ER98-3003-000]
Take notice that on May 14, 1998, the California Independent System
Operator Corporation (ISO), tendered for filing a Meter Service
Agreement for ISO Metered Entities between the ISO and AES Huntington
Beach, L.L.C. (AES Huntington Beach), for acceptance by the Commission.
The ISO states that this filing has been served on AES Huntington
Beach and the California Public Utilities Commission.
Comment date: June 3, 1998, in accordance with Standard Paragraph E
at the end of this notice.
14. Carolina Power & Light Company
[Docket No. ER98-3004-000]
Take notice that on May 14, 1998, Carolina Power & Light Company
(Carolina), tendered for filing an executed Service Agreement between
Carolina and Equitable Power Services Company. Service to the Eligible
Entity will be in accordance with the terms and conditions of
Carolina's Tariff No. 1, for Sales of Capacity and Energy.
Copies of the filing were served upon the North Carolina Utilities
Commission and the South Carolina Public Service Commission.
[[Page 28505]]
Comment date: June 3, 1998, in accordance with Standard Paragraph E
at the end of this notice.
15. Central Vermont Public Service Corporation
[Docket No. ER98-3005-000]
Take notice that on May 14, 1998, Central Vermont Public Service
Corporation (Central Vermont), tendered for filing an unexecuted
umbrella service agreement with Central Vermont's Power Supply
Department for the use of the Highgate Converter and the related
facilities.
Comment date: June 3, 1998, in accordance with Standard Paragraph E
at the end of this notice.
16. K&K Resources, Inc.
[Docket No. ER98-3006-000]
Take notice that on May 14, 1998, K&K Resources, Inc. (K&K),
petitioned the Commission for acceptance of K&K Rate Schedule FERC No.
1; the granting of certain blanket approvals, including the authority
to sell electricity at market-based rates; and the waiver of certain
Commission Regulations.
K&K intends to engage in wholesale electric power and energy
purchases and sales as a marketer. K&K is not in the business of
generating or transmitting electric power.
Comment date: June 3, 1998, in accordance with Standard Paragraph E
at the end of this notice.
17. The Dayton Power and Light Company
[Docket No. ER98-3007-000]
Take notice that on May 14, 1998, The Dayton Power and Light
Company (Dayton), submitted service agreements establishing Tennessee
Valley Authority as a customer under the terms of Dayton's Market-Based
Sales Tariff.
Dayton requests an effective date of one day subsequent to this
filing for the service agreements. Accordingly, Dayton requests waiver
of the Commission's notice requirements. Copies of the this filing were
served upon Tennessee Valley Authority and the Public Utilities
Commission of Ohio.
Comment date: June 3, 1998, in accordance with Standard Paragraph E
at the end of this notice.
18. Central Maine Power Company
[Docket No. ER98-3010-000]
Take notice that on May 14, 1998, Central Maine Power Company
(CMP), tendered for filing pursuant to Section 35.12 of the Federal
Energy Regulatory Commission's Rules of Practice and Procedure, 18 CFR
35.12, as an initial rate schedule, an interconnection agreement (the
Agreement) with Stratton Energy Associates (SEA). The Agreement
provides for interconnection service to SEA at the rates, terms,
charges, and conditions set forth therein. CMP is requesting that the
Commission provide the requested authorization by June 19, 1998.
Copies of this filing have been served upon the Maine Public
Utilities Commission and Stratton Energy Associates.
Comment date: June 3, 1998, in accordance with Standard Paragraph E
at the end of this notice.
19. Kentucky Utilities Company
[Docket No. ER98-3011-000]
Take notice that on May 14, 1998, Kentucky Utilities Company (KU),
tendered for filing a service agreement between KU and Allegheny Power
Service Corporation for service under Kentucky Utilities Company's (KU)
Power Services (PS) Tariff.
Comment date: June 3, 1998, in accordance with Standard Paragraph E
at the end of this notice.
Standard Paragraph
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426,
in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of these filings are on file with
the Commission and are available for public inspection.
David P. Boergers,
Acting Secretary.
[FR Doc. 98-13879 Filed 5-22-98; 8:45 am]