2015-12340. Defense Federal Acquisition Regulation Supplement: Multiyear Contracts-Statutory References and Cancellation Ceiling Threshold (DFARS Case 2014-D019)
-
Start Preamble
AGENCY:
Defense Acquisition Regulations System, Department of Defense (DoD).
ACTION:
Final rule.
SUMMARY:
DoD is issuing a final rule amending the Defense Federal Acquisition Regulation Supplement (DFARS) to update the cancellation ceiling threshold for multiyear contracts and to correct statutory references.
DATES:
Effective May 26, 2015.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Jennifer Hawes, telephone 571-372-6115.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
I. Background
DoD published a proposed rule in the Federal Register at 79 FR 65331 on September 19, 2014, to amend the DFARS regarding multiyear contracts to update the cancellation ceiling threshold at DFARS 217.170(e)(1)(iv) for consistency with the Federal Acquisition Regulation and correct statutory references. The rule also corrects references to 10 U.S.C. 2306b, 10 U.S.C. 2306c, and section 8008a of Public Law 105-56 throughout DFARS subpart 217.1.
No public comments were submitted in response to the proposed rule.
II. Discussion
There are only minor editorial changes in the final rule from the proposed rule. Cross references contained within some paragraphs required revision since several paragraphs were redesignated and renumbered due to relocation of text or the addition of new text.
III. Executive Orders 12866 and 13563
Executive Orders (E.O.s) 12866 and 13563 direct agencies to assess all costs and benefits of available regulatory alternatives and, if regulation is necessary, to select regulatory approaches that maximize net benefits (including potential economic, environmental, public health and safety effects, distributive impacts, and equity). E.O. 13563 emphasizes the importance of quantifying both costs and benefits, of reducing costs, of harmonizing rules, and of promoting flexibility. This is not a significant regulatory action and, therefore, was not subject to review under section 6(b) of E.O. 12866, Regulatory Planning and Review, dated September 30, 1993. This rule is not a major rule under 5 U.S.C. 804.
IV. Regulatory Flexibility Act
A final regulatory flexibility analysis has been prepared consistent with the Regulatory Flexibility Act, 5 U.S.C. 601, et seq., and is summarized as follows:
This rule amends the Defense Federal Acquisition Regulation Supplement (DFARS) regarding multiyear contracts to ensure consistency with the Federal Acquisition Regulation (FAR) and the underlying statutes. The objective of this rule is to increase the cancellation ceiling threshold at DFARS 217.170(e)(1)(iv) from $100 million to $125 million to ensure consistency with the threshold at FAR 17.108(b).
In addition, this rule corrects references to 10 U.S.C. 2306b, 10 U.S.C. 2306c, and section 8008a of Pub. L. 105-56 throughout DFARS subpart 217.1 and makes the following clarifications:
- Requests for increased funding or reprogramming for procurement of a major system is relocated under DFARS 217.172(j) since it is in reference to a type of multiyear supply contract.
- A multiyear contract for supplies in excess of $500 million must be specifically authorized by law in an Act other than an appropriations Act in accordance with 10 U.S.C. 2306b(i)(3).
- A multiyear procurement contract for any system (or component thereof) with a value greater than $500 million must be specifically authorized in an appropriations act in accordance with 10 U.S.C. 2306b(l)(3).
No comments were received from the public in response to initial regulatory flexibility analysis published in the proposed rule.Start Printed Page 29982
Small businesses will not be affected by this rule. The rule will only impact procedures and authorities internal to the Government for multiyear contracts that require a cancellation ceiling up to $125 million or multiyear contracts for supplies with a value in excess of $500 million.
The rule imposes no reporting, recordkeeping, or other information collection requirements.
V. Paperwork Reduction Act
The rule does not contain any information collection requirements that require the approval of the Office of Management and Budget under the Paperwork Reduction Act (44 U.S.C. chapter 35).
Start List of SubjectsList of Subjects in 48 CFR Part 217
- Government procurement
Amy G. Williams,
Editor, Defense Acquisition Regulations System.
Therefore, 48 CFR part 217 is amended as follows:
Start PartPART 217—SPECIAL CONTRACTING METHODS
End Part Start Amendment Part1. The authority citation for 48 CFR part 217 continues to read as follows:
End Amendment Part[Amended]2. Amend section 217.103, in the definition for “Military installation,” by removing “( 10 U.S.C. 2801(c)(2))” and adding “(10 U.S.C. 2801(c)(4))” in its place.
End Amendment Part Start Amendment Part3. Amend section 217.170 by—
End Amendment Part Start Amendment Parta. Removing paragraph (b);
End Amendment Part Start Amendment Partb. Redesignating paragraphs (c), (d), and (e) as paragraphs (b), (c), and (d), respectively;
End Amendment Part Start Amendment Partc. Revising newly redesignated paragraphs (d)(1)(ii), (iii), and (iv);
End Amendment Part Start Amendment Partd. In newly redesignated paragraph (d)(2), removing “(e)(1)(i)” and adding “(d)(1)(i)” in its place;
End Amendment Part Start Amendment Parte. In newly redesignated paragraph (d)(3), removing “(e)(2)” and adding “(d)(2)” in its place;
End Amendment Part Start Amendment Partf. In newly redesignated paragraph (d)(4), removing “(e)(1)” and adding “(d)(1)” in its place;
End Amendment Part Start Amendment Partg. In newly redesignated paragraph (d)(5) introductory text, removing “$100 million” and adding “$125 million” in its place; and
End Amendment Part Start Amendment Parth. In newly redesignated paragraph (d)(5)(i) introductory text, removing “(e)(1)” and adding “(d)(1)” in its place.
End Amendment PartThe revisions read as follows:
General.* * * * *(d)(1) * * *
(ii) Employ economic order quantity procurement in excess of $20 million in any one year of the contract (see 10 U.S.C. 2306b(l)(1)(B)(i)(I) and section 8008(a) of Pub. L. 105-56 and similar sections in subsequent DoD appropriations acts);
(iii) Involve a contract for advance procurement leading to a multiyear contract that employs economic order quantity procurement in excess of $20 million in any one year (see 10 U.S.C. 2306b(l)(1)(B)(ii) and section 8008(a) of Pub. L. 105-56 and similar sections in subsequent DoD appropriations acts); or
(iv) Include a cancellation ceiling in excess of $125 million (see 10 U.S.C. 2306c(d)(4) and 10 U.S.C. 2306b(g)(1)).
* * * * *[Amended]4. Amend section 217.171 by—
End Amendment Part Start Amendment Parta. In paragraph (a) introductory text, removing “( 10 U.S.C. 2306c)” and adding “(10 U.S.C. 2306c(a))” in its place;
End Amendment Part Start Amendment Partb. In paragraph (a)(5)(iii), adding “( 10 U.S.C. 2306c(b))” at the end of the sentence, before the period;
End Amendment Part Start Amendment Partc. In paragraph (b)(3), adding “( 10 U.S.C. 2306c(c))” at the end of the sentence, before the period.
End Amendment Part Start Amendment Partd. In paragraph (c)(3), adding “( 10 U.S.C. 2306c(a))” at the end of the sentence, before the period; and
End Amendment Part Start Amendment Parte. In paragraph (d), removing “( 10 U.S.C. 2306(c))” and adding “(10 U.S.C. 2306c(d)(2))” in its place.
End Amendment Part Start Amendment Part5. Amend section 217.172 by—
End Amendment Part Start Amendment Parta. Revising paragraph (c);
End Amendment Part Start Amendment Partb. Redesignating paragraphs (d) through (h) as paragraphs (e) through (i), respectively;
End Amendment Part Start Amendment Partc. Adding a new paragraph (d);
End Amendment Part Start Amendment Partd. In newly redesignated paragraph (f)(1), adding a parenthesis to close the parenthetical phrase “(when entered into or extended)” and removing “( 10 U.S.C. 2306b(1)(5))” and adding “(10 U.S.C. 2306b(l)(5))” in its place;
End Amendment Part Start Amendment Parte. In newly redesignated paragraph (f)(2)—
End Amendment Part Start Amendment Parti. Removing “(g)(2)(i)” and adding “(h)(2)(i)” in its place;
End Amendment Part Start Amendment Partii. Removing “(g)(2)” and adding “(h)(2)” in its place; and
End Amendment Part Start Amendment Partiii. Removing the parenthetical reference “(10 U.S.C. 2306b(a)(1)(7))”;
End Amendment Part Start Amendment Partf. In newly redesignated paragraph (g)(1), adding the parenthetical reference “( 10 U.S.C. 2306b(h)(1))” before the semicolon;
End Amendment Part Start Amendment Partg. In newly redesignated paragraph (g)(2)—
End Amendment Part Start Amendment Parti. Removing “217.172(g)(3) and (4)” and adding “paragraphs (h)(3) and (4) of this section” in its place; and
End Amendment Part Start Amendment Partii. Adding the parenthetical reference “(10 U.S.C. 2306b(h)(2))” at the end of the first sentence, before the period;
End Amendment Part Start Amendment Parth. In newly redesignated paragraph (h)(2) introductory text—
End Amendment Part Start Amendment Parti. Removing “(g)(2)(i)” and adding “(h)(2)(i)” in its place; and
End Amendment Part Start Amendment Partii. Removing the word “are”;
End Amendment Part Start Amendment Parti. In newly redesignated paragraph (h)(2)(ii), removing “(g)(2)(i)” and adding “(h)(2)(i)” in its place;
End Amendment Part Start Amendment Partj. In newly redesignated paragraph (h)(2)(vii)—
End Amendment Part Start Amendment Parti. Adding the parenthetical reference “( 10 U.S.C. 2306b(i)(1)(G))” at the end of the first sentence before the period, and removing the parenthetical reference “(10 U.S.C. 2306b(i)(1)(G))” from the end of the second sentence; and
End Amendment Part Start Amendment Partii. Removing “USD(C)(P/B)” and adding “OUSD(C)(P/B)” in its place;
End Amendment Part Start Amendment Partk. In newly redesignated paragraph (h)(2)(viii) introductory text, removing “USD(C)(P/B)” and adding “OUSD(C)(P/B)” in its place;
End Amendment Part Start Amendment Partl. In newly redesignated paragraph (h)(5), removing “(g)(2)” and adding “(h)(2)” in its place;
End Amendment Part Start Amendment Partm. In newly redesignated paragraph (h)(6)—
End Amendment Part Start Amendment Parti. Removing “(g)(2)” and adding “(h)(2)” in its place; and
End Amendment Part Start Amendment Partii. Removing “(g)(5)” and adding “(h)(5)” in its place;
End Amendment Part Start Amendment Partn. In newly redesignated paragraph (h)(8) introductory text, removing the parenthetical reference “( 10 U.S.C. 2306b(i)(2))”; and
End Amendment Part Start Amendment Parto. Adding a new paragraph (j).
End Amendment PartThe revisions and additions read as follows:
Multiyear contracts for supplies.* * * * *(c) Multiyear contracts in amounts exceeding $500 million must be specifically authorized by law in an act other than an appropriations act (10 U.S.C. 2306b(i)(3)).
(d) The head of the agency may not initiate a multiyear procurement contract for any system (or component thereof) if the value of the multiyear contract would exceed $500 million unless authority for the contract is specifically provided in an appropriations act (10 U.S.C. 2306b(l)(3)).
* * * * *(j) Any requests for increased funding or reprogramming for procurement of a major system under a multiyear contract shall be accompanied by an explanation of how the request for increased funding affects the determinations made by the Start Printed Page 29983Secretary of Defense under 217.172(h)(2) (10 U.S.C. 2306b(m)).
[FR Doc. 2015-12340 Filed 5-22-15; 8:45 am]
BILLING CODE 5001-06-P
Document Information
- Effective Date:
- 5/26/2015
- Published:
- 05/26/2015
- Department:
- Defense Acquisition Regulations System
- Entry Type:
- Rule
- Action:
- Final rule.
- Document Number:
- 2015-12340
- Dates:
- Effective May 26, 2015.
- Pages:
- 29981-29983 (3 pages)
- RINs:
- 0750-AI37: Multiyear Contracts--Statutory References and Cancellation Ceiling Threshold (DFARS Case 2014-D019)
- RIN Links:
- https://www.federalregister.gov/regulations/0750-AI37/multiyear-contracts-statutory-references-and-cancellation-ceiling-threshold-dfars-case-2014-d019-
- Topics:
- Government procurement
- PDF File:
- 2015-12340.pdf
- CFR: (4)
- 48 CFR 217.103
- 48 CFR 217.170
- 48 CFR 217.171
- 48 CFR 217.172