[Federal Register Volume 59, Number 102 (Friday, May 27, 1994)]
[Unknown Section]
[Page 0]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-12998]
[[Page Unknown]]
[Federal Register: May 27, 1994]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Project Nos. 2396, 2397, 2399, and 2400-001--Vermont]
Central Vermont Public Service Corporation; Availability of Draft
Environmental Assessment
May 23, 1994.
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's (Commission's)
regulations, 18 CFR part 380 (Order No. 486, 52 FR 47897), the Office
of Hydropower Licensing has reviewed the applications for subsequent
license for the constructed and operating Pierce Mills, Arnold Falls,
Gage, and Passumpsic projects, located on the Passumpsic River in
Caledonia County, Vermont, and has prepared a Draft Environmental
Assessment (DEA) for the four projects.
In the DEA, the Commission's staff evaluates the potential
environmental impacts that would result from the continued operation of
the projects and concludes that relicensing the projects with
appropriate enhancement measures would not constitute a major federal
action significantly affecting the quality of the human environment.
Copies of the DEA are available for review in the Public Reference
Branch, room 3104, of the Commission's offices at 941 North Capitol
Street, NE., Washington, DC 20426.
Any comments should be filed within 45 days from the data of this
notice and should be addressed to Lois D. Cashell, Secretary, Federal
Energy Regulatory Commission, 825 North Capitol Street, NE.,
Washington, DC 20426. Please affix Project No. 2608 to all comments.
For further information, please contact Jim Haimes,
Environmental Coordinator, at (202) 219-2780.
Lois D. Cashell,
Secretary.
[FR Doc. 94-12998 Filed 5-26-94; 8:45 am]
BILLING CODE 6717-01-M