94-13000. Colorado Interstate Gas Company; Application
[Federal Register Volume 59, Number 102 (Friday, May 27, 1994)]
[Unknown Section]
[Page 0]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-13000]
[[Page Unknown]]
[Federal Register: May 27, 1994]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. CP94-553-000]
Colorado Interstate Gas Company; Application
May 23, 1994.
Take notice that on May 18, 1994, Colorado Interstate Gas Company
(CIG), P.O. Box 1087, Colorado Springs, Colorado 80944, filed in Docket
No. CP94-553-000 an application pursuant to section 7(b) of the Natural
Gas Act for permission and approval to abandon the transportation of
natural gas for Natural Gas pipeline Company of America (Natural) which
was authorized in Docket No. CP79-167-000, all as more fully set forth
in the application on file with the Commission and open to public
inspection.
CIG proposes to abandon its transportation service of up to 5,000
Mcf per day for Natural, from the Bunker Hill area of Carbon County,
Wyoming. Natural no longer has gas available from this area.
Any person desiring to be heard or to make any protest with
reference to said application should on or before June 14, 1994, file
with the Federal Energy Regulatory Commission, Washington, DC 20426, a
motion to intervene or a protest in accordance with the requirements of
the Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the Natural Gas Act (18 CFR 157.10).
All protests filed with the Commission will be considered by it in
determining the appropriate action to be taken but will not serve to
make the protestants parties to the proceeding. Any person wishing to
become a party to a proceeding or to participate as a party in any
hearing therein must file a motion to intervene in accordance with the
Commission's Rules.
Take further notice that, pursuant to the authority contained in
and subject to the jurisdiction conferred upon the Federal Energy
Regulatory Commission by sections 7 and 15 of the Natural Gas Act and
the Commission's Rules of Practice and Procedure, a hearing will be
held without further notice before the Commission or its designee on
this application if no motion to intervene is filed within the time
required herein, if the Commission on its own review of the matter
finds that permission and approval for the proposed abandonment are
required by the public convenience and necessity. If a motion for leave
to intervene is timely filed, or if the Commission on its own motion
believes that a formal hearing is required, further notice of such
hearing will be duly given.
Under the procedure herein provided for, unless otherwise advised,
it will be unnecessary for CIG to appear or be represented at the
hearing.
Lois D. Cashell,
Secretary.
[FR Doc. 94-13000 Filed 5-26-94; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 05/27/1994
- Department:
- Energy Department
- Entry Type:
- Uncategorized Document
- Document Number:
- 94-13000
- Pages:
- 0-0 (1 pages)
- Docket Numbers:
- Federal Register: May 27, 1994, Docket No. CP94-553-000