2015-12785. Proposed Revision to Site Characteristics and Site Parameters  

  • Start Preamble

    AGENCY:

    Nuclear Regulatory Commission.

    Start Printed Page 30286

    ACTION:

    Standard review plan-draft section revision; request for comment.

    SUMMARY:

    The U.S. Nuclear Regulatory Commission (NRC) is soliciting public comment on NUREG-0800, “Standard Review Plan (SRP) for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition,” Section 2.0, “Site Characteristics and Site Parameters.” The NRC seeks comments on the proposed revised section of the SRP concerning site characteristics and site parameters.

    DATES:

    Submit comments by July 27, 2015. Comments received after this date will be considered, if it is practical to do so, but the Commission is able to ensure consideration only for comments received on or before this date.

    ADDRESSES:

    You may submit comments by any of the following methods (unless this document describes a different method for submitting comments on a specific subject):

    • Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2015-0131. Address questions about NRC dockets to Carol Gallagher; telephone: 301-415-3463; email: Carol.Gallagher@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document.
    • Mail comments to: Cindy Bladey, Office of Administration, Mail Stop: O12-H08, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
    • For additional direction on accessing information and submitting comments, see “Obtaining Information and Submitting Comments” in the SUPPLEMENTARY INFORMATION section of this document.
    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Mark Notich, telephone: 301-415-3053; email: Mark.Notich@nrc.gov, or Demetrius Murray, telephone: 301-415-7646; email: Demetrius.Murray@nrc.gov, both are staff of the Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    I. Obtaining Information and Submitting Comments

    A. Obtaining Information

    Please refer to Docket ID NRC-2015-0131 when contacting the NRC about the availability of information regarding this document. You may obtain publicly-available information related to this action by the following methods:

    • Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2015-0131.
    • NRC's Agencywide Documents Access and Management System (ADAMS): You may obtain publicly-available documents online in the ADAMS Public Documents collection at http://www.nrc.gov/​reading-rm/​adams.html. To begin the search, select “ADAMS Public Documents” and then select “Begin Web-based ADAMS Search.” For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. The ADAMS Accession numbers for the documents associated with the proposed revisions are available in ADAMS as follows: SRP Section 2.0, “Site Characteristics and Site Parameters.” proposed Revision 1 (ADAMS Accession No. ML15043A732), current Revision 0 (ADAMS Accession No. ML070400364), and the redline document (ADAMS Accession No. ML14091B080).
    • NRC's PDR: You may examine and purchase copies of public documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852.

    B. Submitting Comments

    Please include Docket ID NRC-2015-0131 in the subject line of your comment submission, in order to ensure that the NRC is able to make your comment submission available to the public in this docket.

    The NRC cautions you not to include identifying or contact information that you do not want to be publicly disclosed in your comment submission. The NRC posts all comment submissions at http://www.regulations.gov as well as entering the comment submissions into ADAMS. The NRC does not routinely edit comment submissions to remove identifying or contact information.

    If you are requesting or aggregating comments from other persons for submission to the NRC, then you should inform those persons not to include identifying or contact information that they do not want to be publicly disclosed in their comment submission. Your request should state that the NRC does not routinely edit comment submissions to remove such information before making the comment submissions available to the public or entering the comment submissions into ADAMS.

    II. Further Information

    The NRC proposes to revise SRP Section 2.0, “Site Characteristics and Site Parameters,” in Chapter 2 of NUREG-0800, “Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition.” The proposed changes to the SRP Section 2.0 reflect the current staff review methods and practices based on lessons learned from NRC reviews of early site permit, design certification and combined license applications completed since the last revision of this section. The changes include: (1) Clarifying the areas of review by providing definitions and a more detailed description of what is reviewed under part 52 of Title 10 of the Code of Federal Regulations (10 CFR), application; (2) adding more detailed to text and references to regulations to clarify acceptance criteria requirements; and (3) providing clarification on the review of site parameters and site characteristics.

    Following the NRC staff's evaluation of public comments, the NRC intends to finalize SRP Section 2.0, Revision 1 in ADAMS and post it on the NRC's public Web site http://www.nrc.gov/​reading-rm/​doc-collections/​nuregs/​staff/​sr0800/​. The SRP is a guidance for the NRC staff. The SRP is not a substitute for the NRC's regulations, and compliance with the SRP is not required.

    III. Backfitting and Issue Finality

    Issuance of this SRP section revisions does not constitute backfitting as defined in 10 CFR 50.109 (the Backfit Rule) nor is it inconsistent with the issue finality provisions in 10 CFR part 52. The NRC's position is based upon the following considerations.

    1. The SRP Positions Would Not Constitute Backfitting, Inasmuch as the SRP Is Internal Guidance to the NRC Staff

    The SRP provides internal guidance to the NRC staff on how to review an application for NRC regulatory approval in the form of licensing. Changes in internal staff guidance are not matters for which either nuclear power plant applicants or licensees are protected under either the Backfit Rule or the issue finality provisions of 10 CFR part 52.

    2. The NRC Staff Has No Intention To Impose the SRP Positions on Existing Licensees Either Now or in the Future

    The NRC staff does not intend to impose or apply the positions described in the SRP to existing licenses and regulatory approvals. Hence, the issuance of this SRP—even if Start Printed Page 30287considered guidance within the purview of the issue finality provisions in 10 CFR part 52—does not need to be evaluated as if it were a backfit or as being inconsistent with issue finality provisions. If, in the future, the NRC staff seeks to impose a position in the SRP on holders of already issued licenses in a manner that does not provide issue finality as described in the applicable issue finality provision, then the staff must make the showing as set forth in the Backfit Rule or address the criteria for avoiding issue finality as described in the applicable issue finality provision.

    3. Backfitting and Issue Finality Do Not—With Limited Exceptions Not Applicable Here—Protect Current or Future Applicants

    Applicants and potential applicants are not, with certain exceptions, protected by either the Backfit Rule or any issue finality provisions under 10 CFR part 52. Neither the Backfit Rule nor the issue finality provisions under 10 CFR part 52—with certain exclusions—were intended to apply to every NRC action that substantially changes the expectations of current and future applicants. The exceptions to the general principle are applicable whenever an applicant references a 10 CFR part 52 license (e.g., an early site permit) or NRC regulatory approval (e.g., a design certification rule) with specified issue finality provisions. The NRC staff does not, at this time, intend to impose the positions represented in the SRP in a manner that is inconsistent with any issue finality provisions. If, in the future, the staff seeks to impose a position in the SRP section in a manner that does not provide issue finality as described in the applicable issue finality provision, then the staff must address the criteria for avoiding issue finality as described in the applicable issue finality provision.

    Start Signature

    Dated at Rockville, Maryland, this 14th day of May 2015.

    For the Nuclear Regulatory Commission.

    Joseph Colaccino,

    Chief, New Reactor Rulemaking and Guidance Branch, Division of Advanced Reactors and Rulemaking, Office of New Reactors.

    End Signature End Supplemental Information

    [FR Doc. 2015-12785 Filed 5-26-15; 8:45 am]

    BILLING CODE 7590-01-P

Document Information

Published:
05/27/2015
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Action:
Standard review plan-draft section revision; request for comment.
Document Number:
2015-12785
Dates:
Submit comments by July 27, 2015. Comments received after this date will be considered, if it is practical to do so, but the Commission is able to ensure consideration only for comments received on or before this date.
Pages:
30285-30287 (3 pages)
Docket Numbers:
NRC-2015-0131
PDF File:
2015-12785.pdf