[Federal Register Volume 63, Number 103 (Friday, May 29, 1998)]
[Notices]
[Pages 29461-29462]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-14242]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-397]
Washington Public Power Supply System; Notice of Issuance of
Amendment to Facility Operating License
The U.S. Nuclear Regulatory Commission (Commission) has issued
Amendment No. to Facility Operating License No. NPF-21 issued to
Washington Public Power Supply System (the licensee), for operation of
the Washington Nuclear Project No. 2 (WNP-2), located in Benton County,
Washington.
The amendment is effective as of the date of issuance.
The amendment revises the maximum yield strength for emergency core
cooling system suction strainer materials listed in the WNP-2 Final
Safety Analysis Report (FSAR).
The application for the amendment complies with the standards and
requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Commission's rules and regulations. The Commission has made
appropriate findings as required by the Act and the Commission's rules
and regulations in 10 CFR Chapter I, which are set forth in the license
amendment.
Notice of Consideration of Issuance of Amendment and Opportunity
for Hearing in connection with this action was published in the Federal
Register on April 21, 1998 (63 FR 19758). No request for a hearing or
petition for leave to intervene was filed following this notice.
The Commission has prepared an Environmental Assessment related to
[[Page 29462]]
the action and has determined not to prepare an environmental impact
statement. Based upon the environmental assessment, the Commission has
concluded that the issuance of this amendment will not have a
significant effect on the quality of the human environment.
For further details with respect to the action see (1) the
application for amendment dated April 16, 1998, as supplemented by
letters dated April 28, 1998, and May 8, 1998. (2) Amendment No. 153 to
Facility Operating License No. NPF-21, and (3) the Commission's related
Safety Evaluation and Environmental Assessment. All of these items are
available for public inspection at the Commission's Public Document
Room, The Gelman Building, 2120 L Street, N.W., Washington, D.C., and
at the local public document room located at the Richland Public
Library, 955 Northgate Street, Richland, Washington 99352.
Dated at Rockville, Maryland, this 21st day of May 1998.
For the Nuclear Regulatory Commission.
Chester Poslusny,
Senior Project Manager, Project Directorate IV-2, Division of Reactor
Projects III/IV, Office of Nuclear Reactor Regulation.
[FR Doc. 98-14242 Filed 5-28-98; 8:45 am]
BILLING CODE 7590-01-P