2019-11164. Birdsboro Power LLC; Notice of Institution of Section 206 Proceeding and Refund Effective Date
-
Start Preamble
On May 21, 2019, the Commission issued an order in Docket No. EL19-73-000, pursuant to section 206 of the Federal Power Act (FPA), 16 U.S.C. 824e (2012), instituting an investigation into whether Birdsboro Power LLC's proposed initial reactive power tariff to provide Reactive Supply and Voltage Control from Generational or Other Sources Service may be unjust, unreasonable, unduly discriminatory or preferential, or otherwise unlawful. Birdsboro Power LLC, 167 FERC ¶ 61,162 (2019).
The refund effective date in Docket No. EL19-73-000, established pursuant to section 206(b) of the FPA, will be the date of publication of this notice in the Federal Register.
Any interested person desiring to be heard in Docket No. EL19-73-000 must file a notice of intervention or motion to intervene, as appropriate, with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rule 214 of the Commission's Rules of Practice and Procedure, 18 CFR 385.214 (2018), within 21 days of the date of issuance of the order.
Start SignatureDated: May 21, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-11164 Filed 5-28-19; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 05/29/2019
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2019-11164
- Pages:
- 24778-24778 (1 pages)
- Docket Numbers:
- Docket No. EL19-73-000
- PDF File:
- 2019-11164.pdf