94-10532. Inversores De Electricidad S.A., et al.; Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 59, Number 84 (Tuesday, May 3, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-10532]
    
    
    [[Page Unknown]]
    
    [Federal Register: May 3, 1994]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    Federal Energy Regulatory Commission
    [Docket No. EG94-22-000, et al.]
    
     
    
    Inversores De Electricidad S.A., et al.; Electric Rate and 
    Corporate Regulation Filings
    
    April 22, 1994.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. Inversores de Electricidad S.A.
    
    [Docket No. EG94-22-000]
    
        Take notice that on April 6, 1994, pursuant to section 365.7 of the 
    Commission's regulations, 18 CFR 365.7, Inversores de Electricidad S.A. 
    filed notification that it surrenders its status as an exempt wholesale 
    generator under section 32(a)(1) of the Public Utility Holding Company 
    Act of 1935, as amended.
    
    2. Hermiston Generating Company, L.P.
    
    [Docket No. EG94-48-000]
    
        On April 11, 1994, Hermiston Generating Company, L.P. 
    (``Hermiston''), a Delaware limited partnership with its principal 
    place of business at 7500 Old Georgetown Road, Bethesda, Maryland 
    20814-6161, filed with the Federal Energy Regulatory Commission an 
    application for determination of exempt wholesale generator status 
    pursuant to part 365 of the Commission's regulations.
        Hermiston intends to own and operate a multi-unit, natural gas-
    fired combined cycle generating plant with automatic generation control 
    and related transmission and interconnection equipment with a bus bar 
    rating of approximately 474 MW. All of the facility's electric power 
    net of the facility's operating electric power will be purchased at 
    wholesale by PacifiCorp, an electric utility.
        Comment date: May 6, 1994, in accordance with Standard Paragraph E 
    at the end of this notice. The Commission will limit its consideration 
    of comments to those that concern the adequacy or accuracy of the 
    application. All such motions and comments must be served on the 
    applicant.
    
    3. TIFD VIII-L Inc.
    
    [Docket No. EG94-49-000]
    
        April 13, 1994, TIFD VIII-L Inc. (``Applicant''), with its 
    principal place of business at 1600 Summer Street, Stamford, 
    Connecticut 06927, filed with the Federal Energy Regulatory Commission 
    an application for determination of exempt wholesale generator status 
    pursuant to Part 365 of the Commission's regulations.
        The Applicant has represented that it will be engaged indirectly, 
    through an affiliate that is a Philippine company, and exclusively in 
    the business of owning and operating electricity generating facilities 
    to be located near Iligan City in Mindanao, Philippines and selling 
    electric energy at wholesale. The electric energy generated by those 
    facilities will be delivered at wholesale to the National Power 
    Corporation, a Philippine electric utility wholly-owned by the 
    Philippine government. Retail sales to Philippine industrial customers 
    may occur in the future, although no such arrangements currently exist.
        Comment date: May 6, 1994, in accordance with Standard Paragraph E 
    at the end of this notice. The Commission will limit its consideration 
    of comments to those that concern the adequancy or accuracy of the 
    application. All such motions and comments must be served on the 
    applicant.
    
    4. SEI Inversora S.A.
    
    [Docket No. EG94-52-000]
    
        On April 20, 1994, SEI Inversora S.A. (``Applicant'') filed with 
    the Federal Energy Regulatory Commission an application for 
    determination of exempt wholesale generator (``EWG'') status pursuant 
    to Part 365 of the Commission's regulations.
        The Applicant is jointly owned by SEI Bahamas Argentina I, Inc. 
    (``SEI Bahamas Argentina''), which owns 65% of the voting securities of 
    the Applicant, and by COE Argentina I Corp., a Connecticut corporation, 
    which owns 35% of the voting securities of the Applicant. The Applicant 
    is participating in several bids for the purpose of owning and/or 
    operating ``eligible facilities'' as defined in section 32(a)(2) of 
    PUHCA. The currently identified facilities consist of several 
    hydroelectric generating stations with a total combined installed 
    capacity of approximately 650 MW produced by several generating units 
    and associated interconnection facilities. The facilities are located 
    on the Atuel and Diamante River Systems in the Province of Mendoza and 
    other provinces in the Republic of Argentina.
        In addition, the Applicant intends to engage in project development 
    activities on its own behalf associated with the acquisition of 
    ownership interests in additional as-yet unidentified eligible 
    facilities and/or EWGs. These development activities will be limited to 
    activities associated with the acquisition of ownership interests in 
    additional facilities or entities that meet the criteria for eligible 
    facilities and/or EWGs set out in section 32 of the Public Utility 
    Holding Act of 1935.
        Comment date: May 13, 1994, in accordance with Standard Paragraph E 
    at the end of this notice. The Commission will limit its consideration 
    of comments to those that concern the adequancy or accuracy of the 
    application. All such motions and comments must be served on the 
    applicant.
    
    5. Florida Power & Light Company
    
    [Docket No. ER93-939-000]
    
        Take notice that Florida Power & Light Company (FPL), on March 31, 
    1994, tendered for filing the Amendment Number One the AES Cedar Bay 
    Parallel Operations Agreement Between Florida Power & Light Company and 
    Jacksonville Electric Authority.
        FPL states that copies of the filing were served upon the 
    Jacksonville Electric Authority and the Florida Public Service 
    Commission.
        Comment date: May 6, 1994, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    6. Portland General Electric Company
    
    [Docket No. ER94-963-000]
    
        Take notice that on April 19, 1994, Portland General Electric 
    Company (PGE) tendered for filing a request for deferral of Commission 
    action for thirty (30) days in the above Docket, to allow PGE to 
    respond to Commission staff questions concerning the filed Round Butte/
    Cove Interconnection and Operation Agreement.
        Comment date: May 6, 1994, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    7. Equitable Resources Marketing
    
    [Docket No. ER94-1029-000]
    
        Take notice that on April 12, 1994, Equitable Resources Marketing 
    Company (Equitable) tendered for filing pursuant to Rule 205, 18 CFR 
    385.205, a revised petition for waivers and blanket approvals under 
    various regulations of the Commission and for an order accepting its 
    FERC Rate Schedule No. to be effective May 9, 1994.
        The revised reflects filing makes two minor changes to the filing 
    made March 10, 1994 in Docket No. ER94-1029-000. First, Equitable 
    clarifies that a small, affiliated owned cogeneration unit sells its 
    output to another affiliate under a long-term contract committing the 
    full output of the plant. Second, the proposed Rate Schedule is 
    modified to explicitly exclude sales to affiliates.
        Comment date: May 6, 1994, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    8. Boston Edison Company
    
    [Docket No. ER94-1135-000]
    
        Take notice that on April 4, 1994, Boston Edison Company (Edison) 
    tendered for filing a letter agreement dated March 29, 1994, with New 
    England Power Company (NEP) extending the term of the Transmission 
    Facilities Support Agreement between Edison and NEP, dated May 25, 1988 
    and accepted by the Commission in Docket No. ER89-658-000. Boston 
    requests that this letter agreement be allowed to become effective as 
    of June 1, 1994.
        Edison states that it has served the filing on NEP and the 
    Massachusetts Department of Public Utilities.
        Comment date: May 6, 1994, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    9. Delmarva Power & Light Company
    
    [Docket No. ER94-1136-000]
    
        Take notice that on April 5, 1995, Delmarva Power & Light Company 
    (DPL) tendered for filing as an initial Rate Schedule an Agreement for 
    Installed Capacity Credit Transactions between Pennsylvania Power & 
    Light Company (PP&L) and DPL dated March 16, 1994. This contract sets 
    forth the terms under which DPL will sell PJM installed capacity 
    credits to PP&L. DPL requests that the Commission permit this Agreement 
    to become effective on May 30, 1994.
        DPL states that a copy of this filing has been served by mail up 
    PP&L, the Pennsylvania Public Utility Commission, the Delaware Public 
    Service Commission, the Maryland Public Service Commission, and the 
    Virginia State Corporation Commission.
        Comment date: May 6, 1994, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    10. Southern Company Services, Inc.
    
    [Docket No. ER94-1149-000]
    
        Take notice that on April 12, 1994, Southern Company Services, 
    Inc., acting on behalf of Alabama Power Company, Georgia Power Company, 
    Gulf Power Company, Mississippi Power Company, and Savannah Electric 
    and Power Company (Southern Companies), filed a Service Schedule EP 
    (Economic Energy Participation) to the Interchange Contract between 
    those companies and the Tennessee Valley Authority (TVA). Under that 
    Service Schedule, Southern Companies will provide transmission service 
    for economic energy to TVA from certain third-party utilities. Southern 
    Companies request an effective date of April 13, 1994.
        Comment date: May 6, 1994, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    11. Rainbow Energy Marketing Corporation
    
    [Docket No. ER94-1061-000]
    
        Take notice that on April 19, 1994, Rainbow Energy Marketing 
    Corporation tendered for filing revised FERC Electric Rate Schedule No. 
    1.
        Comment date: May 6, 1994, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    12. Duke Power Company
    
    [Docket No. ER94-1162-000]
    
        Take notice that on April 15, 1994, Duke Power Company (Duke) 
    tendered for filing copies of the true-up filing for calendar year 1993 
    under Article II.3 of the Settlement Agreement in Docket No. ER90-315-
    000.
        Comment date: May 6, 1994, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    13. Florida Power Corporation
    
    [Docket No. ER94-1163-000]
    
        Take notice that on April 18, 1994, Florida Power Corporation 
    (Florida Power) filed a contract for the provision of interchange 
    service between itself and Alabama Electric Cooperative, Inc. Florida 
    Power requests that the contract become effective on June 17, 1994, 
    which is 60 days after the contract was tendered for filing.
        Florida Power states that a copy of the filing has been posted as 
    required by the Commission's Regulations, and a copy has been mailed to 
    the customer affected by the filing, to the Florida Public Service 
    Commission and to the Alabama Public Service Commission.
        Comment date: May 6, 1994, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    14. WestPlains Energy, a division of UtiliCorp United, Inc.
    
    [Docket No. ER94-1164-0000]
    
        Take notice that on April 18, 1994, WestPlains Energy, a division 
    of UtiliCorp United, Inc. (WestPlains) tendered for filing an 
    ``Interconnection and Interchange Agreement between WestPlains Energy 
    and Colorado Springs Utilities'' (``the Agreement''). Under the 
    Agreement, WestPlains and Colorado Springs Utilities (``CSU'') agree to 
    install facilities to interconnect their systems in order to provide 
    service between the parties under the rates, terms and conditions of 
    the Revised Inland Power Pool Agreement. An effective date of June 1, 
    1994, was requested.
        WestPlains states that a copy of the filing was served on CSU, the 
    Public Utilities Commission of the State of Colorado and the Chairman 
    of the Inland Power Pool Executive Committee.
        Comment date: May 6, 1994, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    15. Pacific Gas and Electric Company
    
    [Docket No. ER94-1165-000]
    
        Take notice that on Apil 19, 1994, Pacific Gas and Electric Company 
    (PG&E) tendered for filing a rate schedule change to Rate Schedule FERC 
    No. 79, between PG&E and the Western Area Power Administration 
    (Western).
        The rate schedule change establishes recorded-cost based rates for 
    true-up for Western's withdrawals of energy from the Energy Account No. 
    2 (EA2), an energy account established by Western's Contract No. 14-06-
    200-2948A with PG&E, and maintained by PG&E, for return of previously 
    banked energy to Western. PG&E has previously billed Western for 
    withdrwals for the years 1985 through 1992 at rates based on estimated 
    costs, and is now filing revised rates. This true-up process is part of 
    a rate methodology specified in a PG&E-Western Letter Agreement dated 
    February 7, 1992, and previously accepted by the Commission in FERC 
    Docket No. ER92-457-000.
        Copies of this filing have been served upon Western and the CPUC.
        Comment date: May 6, 1994, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    16. Mississippi Power Company
    
    [Docket No. ER94-1166-000]
    
        Take notice that on April 18, 1994, Mississippi Power Company filed 
    a letter agreement dated April 6, 1994, revising the Contract executed 
    by the United States of America, Department of Energy, acting by and 
    through the Southeastern Power Administration and Mississippi Power 
    Company. The letter agreement extends the term of the existing Contract 
    for six (6) months to allow the parties to continue negotiations of a 
    new arrangement.
        Comment date: May 6, 1994, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    17. Metropolitan Edison Company
    
    [Docket No. ER94-1167-000]
    
        Take notice that on April 19, 1994, Metropolitan Edison Company 
    (Met-Ed) tendered for filing pursuant to Rule 205 of the Commission's 
    Rules of Practice and Procedure (18 CFR 385.205) amendments to its 
    existing rate schedule, for borderline service to Pike County Light & 
    Power Company (Pike). Under such existing rate schedule, Met-Ed has 
    been providing borderline service to Pike.
        By an Order issued July 30, 1993 in Commission Docket No. PL93-2-
    002, the Commission held that, in recognition of the character of the 
    borderline service provided, the Commission had adopted as the 
    wholesale rate the neighboring utility's retail rate, provided that the 
    utility documents the state commission's approval of the retail rate.
        Under the tendered amendments, Met-Ed would (1) terminate its 
    Borderline Service Agreement, dated July 22, 1980, with Pike, and (2) 
    file as its Borderline Rate Schedule for borderline service to Pike the 
    Met-Ed retail Rate Schedule that is currently on file with the 
    Pennsylvania Public Utility Commission (PaPUC) which was approved by 
    the PaPUC.
        Copies of the filing have been served on the Pennsylvania Public 
    Utility Commission and Pike.
        Comment date: May 6, 1994, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    18. Vesta Energy Alternatives Company
    
    [Docket No. ER94-1168-000]
    
        Take notice that on April 19, 1994, Vesta Energy Alternatives 
    Company (VEA) submitted for filing pursuant to Rule 205, 18 CFR 
    385.205, an application for waivers and blanket approvals under various 
    Commission regulations and authorizations enabling VEA to engage in 
    electric power and energy transactions as a marketer and broker. VEA 
    also requests an order accepting its FERC Electric Rate Schedule No. 1 
    to be effective no later than June 18, 1994.
        VEA states that it will act as both a broker (introducing buyers 
    and sellers without taking title to electric power) and a marketer 
    (buying and selling electric power). VEA states that it will develop 
    market-based transactions that meet its customers' needs. Prices for 
    capacity and energy would be competitively set, based on market 
    conditions. These transactions may vary in terms of duration (possibly 
    ranging from hourly to long-term sales), in terms of a firm or 
    interruptible nature, and in terms of energy and capacity or energy-
    only services.
        VEA states that it neither owns, operates, nor controls any 
    electric power transmission or distribution facilities. It is not 
    affiliated with any entity that owns, operates, or controls any 
    electric power transmission or distribution facilities. Neither VEA nor 
    any of its affiliates holds a franchise or service territory for 
    transmission, sales or distribution of electric power.
        Comment date: May 6, 1994, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    19. Arizona Public Service Company
    
    [Docket No. ER94-1169-000]
    
        Take notice that on April 19, 1994, Arizona Public Service Company 
    (APS) tendered for filing revised Exhibit B to the Wholesale Power 
    Agreement (Agreement) between APS and Citizens Utilities Company 
    (Citizens) (APS-FERC Rate Schedule No. 49).
        Current rate levels are unchanged from those currently on file with 
    the Commission, and no other significant change in service to this or 
    any other customer results from the revision proposed herein. No new or 
    modifications to existing facilities are required as a result of this 
    revision.
        A copy of this filing has been served on Citizens and the Arizona 
    Public Corporation Commission.
        Comment date: May 6, 1994, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    20. Central Maine Power Company
    
    [Docket No. ER94-1170-000]
    
        Take notice that on April 20, 1994, Central Maine Power Company 
    (CMP) tendered for filing executed Service Agreements entered with the 
    following: Bangor Hydro-Electric Company, Boston Edison Company, 
    Central Vermont Public Service Corporation, Connecticut Municipal 
    Electric Energy Cooperative, Green Mountain Power Corporation, 
    Massachusetts Municipal Wholesale Electric Company, Unitil Power Corp., 
    Fitchburg Gas and Electric Light Company, Montaup Electric Company and 
    North American Energy Conservation, Inc. Service will be provided 
    pursuant to CMP's previously accepted Power Sales Tariff, designated 
    rate schedule CMP-FERC Electric Tariff, Original Volume No. 2. An 
    effective date for commencement of service of April 1, 1994, is 
    requested for each of the Service Agreements.
        CMP has served a copy of the filing on the affected customers and 
    on the Maine Public Utilities Commission.
        Comment date: May 6, 1994, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    21. Arizona Public Service Company
    
    [Docket No. ER94-1171-000]
    
        Take notice that on April 20, 1994, Arizona Public Service Company 
    (APS) tendered for filing the Reciprocal Transmission Service Agreement 
    (Agreement) between APS and PacifiCorp.
        The enclosed Agreement essentially proposed two transmission 
    service arrangements: (1) APS will provide 30 MW of interim firm 
    transmission service for PacifiCorp over the Cholla/Four Corners System 
    until PacifiCorp's Four Corners/Borah-Brady System is able to 
    accommodate additional transmission for APS; and (2) at such time as 
    PacifiCorp's Four Corners/Borah-Brady System has sufficient capacity to 
    accommodate additional transmission for APS, the Agreement then 
    converts to a classical ``reciprocal'' type arrangement whereby APS and 
    PacifiCorp will each provide 30 MW of firm unidirectional reciprocal 
    transmission to the other.
        Comment date: May 6, 1994, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    22. Boston Edison Company
    
    [Docket No. ER94-1173-000]
    
        Take notice that on April 20, 1994, Boston Edison Company (Edison) 
    tendered for filing for informational purposes a letter agreement dated 
    April 12, 1994, with Wellesley Municipal Light Plant (WMLP) 
    implementing the terms and conditions of Exhibit C, Section V, of the 
    October 26, 1992, Agreement between Boston Edison and WMLP, which was 
    approved by the Commission in Docket Nos. ER86-562-000, ER87-122-000 
    and ER91-149-000.
        Edison states that it has served the filing on WMLP and the 
    Massachusetts Department of Public Utilities.
        Comment date: May 6, 1994, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    Standard Paragraphs
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 825 North Capitol Street, NE., Washington, DC 
    20426, in accordance with Rules 211 and 214 of the Commission's Rules 
    of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of this filing are on file with the 
    Commission and are available for public inspection.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 94-10532 Filed 5-2-94; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
05/03/1994
Department:
Federal Energy Regulatory Commission
Entry Type:
Uncategorized Document
Document Number:
94-10532
Dates:
May 6, 1994, in accordance with Standard Paragraph E at the end of this notice. The Commission will limit its consideration of comments to those that concern the adequacy or accuracy of the application. All such motions and comments must be served on the applicant.
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: May 3, 1994, Docket No. EG94-22-000, et al.