94-10579. Energy Conservation Program for Consumer Products: Granting of the Application for Interim Waiver and Publishing of the Petition for Waiver of DOE Furnace Test Procedures From Rheem Manufacturing Company  

  • [Federal Register Volume 59, Number 84 (Tuesday, May 3, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-10579]
    
    
    [[Page Unknown]]
    
    [Federal Register: May 3, 1994]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Case No. F-071]
    
     
    
    Energy Conservation Program for Consumer Products: Granting of 
    the Application for Interim Waiver and Publishing of the Petition for 
    Waiver of DOE Furnace Test Procedures From Rheem Manufacturing Company
    
    AGENCY: Office of Energy Efficiency and Renewable Energy, DOE.
    
    ACTION: Notice.
    
    -----------------------------------------------------------------------
    
    SUMMARY: Today's notice publishes a letter granting an Interim Waiver 
    to Rheem Manufacturing Company (Rheem) from the existing Department of 
    Energy (DOE) test procedure regarding blower time delay for the 
    company's GDG upflow, GLH downflow, GVH horizontal, and GPH upflow/
    horizontal gas furnaces.
        Today's notice also publishes a ``Petition for Waiver'' from Rheem. 
    Rheem's Petition for Waiver requests DOE to grant relief from the DOE 
    furnace test procedure relating to the blower time delay specification. 
    Rheem seeks to test using a blower delay time of 20 seconds for its GDG 
    upflow, GLH downflow, GVH horizontal, and GPH upflow/horizontal gas 
    furnaces instead of the specified 1.5-minute delay between burner on-
    time and blower on-time. The Department is soliciting comments, data, 
    and information respecting the Petition for Waiver.
    
    DATES: DOE will accept comments, data, and information not later than 
    June 2, 1994.
    
    ADDRESSES: Written comments and statements shall be sent to: Department 
    of Energy, Office of Energy Efficiency and Renewable Energy, Case No. 
    F-071, Mail Stop EE-43, room 5E-066, Forrestal Building, 1000 
    Independence Avenue, SW., Washington, DC 20585, (202) 586-7140.
    
    FOR FURTHER INFORMATION CONTACT:
    
    Cyrus H. Nasseri, U.S. Department of Energy, Office of Energy 
    Efficiency and Renewable Energy, Mail Station EE-431, Forrestal 
    Building, 1000 Independence Avenue, SW., Washington, DC 20585, (202) 
    586-7140.
    Eugene Margolis, Esq., U.S. Department of Energy, Office of General 
    Counsel, Mail Station GC-72, Forrestal Building, 1000 Independence 
    Avenue, SW., Washington, DC 20585, (202) 586-9507.
    
    SUPPLEMENTARY INFORMATION: The Energy Conservation Program for Consumer 
    Products (other than automobiles) was established pursuant to the 
    Energy Policy and Conservation Act (EPCA), Public Law 94-163, 89 Stat. 
    917, as amended by the National Energy Conservation Policy Act (NECPA), 
    Public Law 95-619, 92 Stat. 3266, the National Appliance Energy 
    Conservation Act of 1987 (NAECA), Public Law 100-12, the National 
    Appliance Energy Conservation Amendments of 1988 (NAECA 1988), Public 
    Law 100-357, and the Energy Policy Act of 1992 (EPAct), Public Law 102-
    486, 106 Stat. 2776, which requires DOE to prescribe standardized test 
    procedures to measure the energy consumption of certain consumer 
    products, including furnaces. The intent of the test procedures is to 
    provide a comparable measure of energy consumption that will assist 
    consumers in making purchasing decisions. These test procedures appear 
    at 10 CFR part 430, Subpart B.
        The Department amended the prescribed test procedures by adding 10 
    CFR 430.27 on September 26, 1980, creating the waiver process. 45 FR 
    64108. Thereafter, DOE further amended the appliance test procedure 
    waiver process to allow the Assistant Secretary for Energy Efficiency 
    and Renewable Energy (Assistant Secretary) to grant an Interim Waiver 
    from test procedure requirements to manufacturers that have petitioned 
    DOE for a waiver of such prescribed test procedures. 51 FR 42823, 
    November 26, 1986.
        The waiver process allows the Assistant Secretary to waive 
    temporarily, test procedures for a particular basic model when a 
    petitioner shows that the basic model contains one or more design 
    characteristics which prevent testing according to the prescribed test 
    procedures, or when the prescribed test procedures may evaluate the 
    basic model in a manner so unrepresentative of its true energy 
    consumption as to provide materially inaccurate comparative data. 
    Waivers generally remain in effect until final test procedure 
    amendments become effective, resolving the problem that is the subject 
    of the waiver.
        The Interim Waiver provisions added by the 1986 amendment allow the 
    Secretary to grant an Interim Waiver when it is determined that the 
    applicant will experience economic hardship if the Application for 
    Interim Waiver is denied, if it appears likely that the Petition for 
    Waiver will be granted, and/or the Assistant Secretary determines that 
    it would be desirable for public policy reasons to grant immediate 
    relief pending a determination on the Petition for Waiver. An Interim 
    Waiver remains in effect for a period of 180 days or until DOE issues 
    its determination on the Petition for Waiver, whichever is sooner, and 
    may be extended for an additional 180 days, if necessary.
        On March 23, 1994, Rheem filed an Application for Interim Waiver 
    regarding blower time delay. Rheem's Application seeks an Interim 
    Waiver from the DOE test provisions that require a 1.5-minute time 
    delay between the ignition of the burner and starting of the 
    circulating air blower. Instead, Rheem requests the allowance to test 
    using a 20-second blower time delay when testing its GDG upflow, GLH 
    downflow, GVH horizontal, and GPH upflow/horizontal gas furnaces. Rheem 
    states that the 20-second delay is indicative of how these furnaces 
    actually operate. Such a delay results in an average increase in AFUE 
    of 2.0 percentage points. Since current DOE test procedures do not 
    address this variable blower time delay, Rheem asks that the Interim 
    Waiver be granted.
        The Department has published a Notice of Proposed Rulemaking on 
    August 23, 1993, (58 FR 44583) to amend the furnace test procedure, 
    which addresses the above issue.
        Previous waivers for this type of time blower delay control have 
    been granted by DOE to Coleman Company, 50 FR 2710, January 18, 1985; 
    Magic Chef Company, 50 FR 41553, October 11, 1985; Rheem Manufacturing 
    Company, 53 FR 48574, December 1, 1988, 56 FR 2920, January 25, 1991, 
    57 FR 10166, March 24, 1992, and 57 FR 34560, August 5, 1992; Trane 
    Company, 54 FR 19226, May 4, 1989, 56 FR 6021, February 14, 1991, 57 FR 
    10167, March 24, 1992, 57 FR 22222, May 27, 1992, and 58 FR 68138, 
    December 23, 1993; Lennox Industries, 55 FR 50224, December 5, 1990, 57 
    FR 49700, November 3, 1992, 58 FR 68136, December 23, 1993, and 58 FR 
    68137, December 23, 1993; Inter-City Products Corporation, 55 FR 51487, 
    December 14, 1990, and 56 FR 63945, December 6, 1991; DMO Industries, 
    56 FR 4622, February 5, 1991; Heil-Quaker Corporation, 56 FR 6019, 
    February 14, 1991; Carrier Corporation, 56 FR 6018, February 14, 1991, 
    57 FR 38830, August 27, 1992, 58 FR 68131, December 23, 1993, 58 FR 
    68133, December 23, 1993 and 59 FR 14394, March 28, 1994; Amana 
    Refrigeration Inc., 56 FR 27958, June 18, 1991, 56 FR 63940, December 
    6, 1991, 57 FR 23392, June 3, 1992, and 58 FR 68130, December 23, 1993; 
    Snyder General Corporation, 56 FR 54960, September 9, 1991; Goodman 
    Manufacturing Corporation, 56 FR 51713, October 15, 1991, 57 FR 27970, 
    June 23, 1992 and 59 FR 12586, March 17, 1994; The Ducane Company Inc., 
    56 FR 63943, December 6, 1991, 57 FR 10163, March 24, 1992, and 58 FR 
    68134, December 23, 1993; Armstrong Air Conditioning, Inc., 57 FR 899, 
    January 9, 1992, 57 FR 10160, March 24, 1992, 57 FR 10161, March 24, 
    1992, 57 FR 39193, August 28, 1992, and 57 FR 54230, November 17, 1992; 
    Thermo Products, Inc., 57 FR 903, January 9, 1992; Consolidated 
    Industries Corporation, 57 FR 22220, May 27, 1992; Evcon Industries, 
    Inc., 57 FR 47847, October 20, 1992; and Bard Manufacturing Company, 57 
    FR 53733, November 12, 1992. Thus, it appears likely that the Petition 
    for Waiver will be granted for blower time delay.
        In those instances where the likely success of the Petition for 
    Waiver has been demonstrated based upon DOE having granted a waiver for 
    a similar product design, it is in the public interest to have similar 
    products tested and rated for energy consumption on a comparable basis.
        Therefore, based on the above, DOE is granting Rheem an Interim 
    Waiver for its GDG upflow, GLH downflow, GVH horizontal, and GPH 
    upflow/horizontal gas furnaces. Pursuant to paragraph (e) of 
    Sec. 430.27 of the Code of Federal Regulations part 430, the following 
    letter granting the Application for Interim Waiver to Rheem was issued.
        Pursuant to paragraph (b) of 10 CFR 430.27, DOE is hereby 
    publishing the ``Petition for Waiver'' in its entirety. The petition 
    contains no confidential information. The Department solicits comments, 
    data, and information respecting the petition.
    
        Issued in Washington, DC, April 19, 1994.
    Frank M. Stewart, Jr.,
    Acting Chief of Staff, Energy Efficiency and Renewable Energy.
    
    April 19, 1994.
    Mr. Daniel J. Canclini,
    Vice-President,
    Product Development and,
    Research Engineering,
    Rheem Manufacturing Company,
    P.O. Box 17010,
    Fort Smith, AR 72917-7010.
    
        Dear Mr. Canclini: This is in response to your March 23, 1994, 
    Application for Interim Waiver and Petition for Waiver from the 
    Department of Energy (DOE) test procedure regarding blower time 
    delay for Rheem Manufacturing Company (Rheem) GDG upflow, GLH 
    downflow, GVH horizontal, and GPH upflow/horizontal gas furnaces.
        Previous waivers for this type of timed blower delay control 
    have been granted by DOE to Coleman Company, 50 FR 2710, January 18, 
    1985; Magic Chef Company, 50 FR 41553, October 11, 1985; Rheem 
    Manufacturing Company, 53 FR 48574, December 1, 1988, 56 FR 2920, 
    January 25, 1991, 57 FR 10166, March 24, 1992, and 57 FR 34560, 
    August 5, 1992; Trane Company, 54 FR 19226, May 4, 1989, 56 FR 6021, 
    February 14, 1991, 57 FR 10167, March 24, 1992, 57 FR 22222, May 27, 
    1992, and 58 FR 68138, December 23, 1993; Lennox Industries, 55 FR 
    50224, December 5, 1990, 57 FR 49700, November 3, 1992, 58 FR 68136, 
    December 23, 1993, and 58 FR 68137, December 23, 1993; Inter-City 
    Products Corporation, 55 FR 51487, December 14, 1990, and 56 FR 
    63945, December 6, 1991; DMO Industries, 56 FR 4622, February 5, 
    1991; Heil-Quaker Corporation, 56 FR 6019, February 14, 1991; 
    Carrier Corporation, 56 FR 6018, February 14, 1991, 57 FR 38830, 
    August 27, 1992, 58 FR 68131, December 23, 1993, 58 FR 68133, 
    December 23, 1993 and 59 FR 14394, March 28, 1994; Amana 
    Refrigeration Inc., 56 FR 27958, June 18, 1991, 56 FR 63940, 
    December 6, 1991, 57 FR 23392, June 3, 1992, and 58 FR 68130, 
    December 23, 1993; Snyder General Corporation, 56 FR 54960, 
    September 9, 1991; Goodman Manufacturing Corporation, 56 FR 51713, 
    October 15, 1991, 57 FR 27970, June 23, 1992 and 59 FR 12586, March 
    17, 1994; The Ducane Company Inc., 56 FR 63943, December 6, 1991, 57 
    FR 10163, March 24, 1992, and 58 FR 68134, December 23, 1993; 
    Armstrong Air Conditioning, Inc., 57 FR 899, January 9, 1992, 57 FR 
    10160, March 24, 1992, 57 FR 10161, March 24, 1992, 57 FR 39193, 
    August 28, 1992, and 57 FR 54230, November 17, 1992; Thermo 
    Products, Inc., 57 FR 903, January 9, 1992; Consolidated Industries 
    Corporation, 57 FR 22220, May 27, 1992; Evcon Industries, Inc., 57 
    FR 47847, October 20, 1992; and Bard Manufacturing Company, 57 FR 
    53733, November 12, 1992. Thus, it appears likely that the Petition 
    for Waiver will be granted for blower time delay.
        Rheem's Application for Interim Waiver does not provide 
    sufficient information to evaluate what, if any, economic impact or 
    competitive disadvantage Rheem will likely experience absent a 
    favorable determination on its application.
        However, in those instances where the likely success of the 
    Petition for Waiver has been demonstrated, based upon DOE having 
    granted a waiver for a similar product design, it is in the public 
    interest to have similar products tested and rated for energy 
    consumption on a comparable basis.
        Therefore, Rheem's Application for an Interim Waiver from the 
    DOE test procedure for its GDG upflow, GLH downflow, GVH horizontal, 
    and GPH upflow/horizontal gas furnaces regarding blower time delay 
    is granted.
        Rheem shall be permitted to test its GDG upflow, GLH downflow, 
    GVH horizontal, and GPH upflow/horizontal gas furnaces on the basis 
    of the test procedures specified in 10 CFR part 430, subpart B, 
    Appendix N, with the modification set forth below:
        (i) Section 3.0 in Appendix N is deleted and replaced with the 
    following paragraph:
        3.0  Test Procedure. Testing and measurements shall be as 
    specified in Section 9 in ANSI/ASHRAE 103-82 with the exception of 
    Sections 9.2.2, 9.3.1, and 9.3.2, and the inclusion of the following 
    additional procedures:
        (ii) Add a new paragraph 3.10 in Appendix N as follows:
        3.10  Gas- and Oil-Fueled Central Furnaces. After equilibrium 
    conditions are achieved following the cool-down test and the 
    required measurements performed, turn on the furnace and measure the 
    flue gas temperature, using the thermocouple grid described above, 
    at 0.5 and 2.5 minutes after the main burner(s) comes on. After the 
    burner start-up, delay the blower start-up by 1.5 minutes (t-) 
    unless:
        (1) The furnace employs a single motor to drive the power burner 
    and the indoor air circulation blower, in which case the burner and 
    blower shall be started together; or
        (2) The furnace is designed to operate using an unvarying delay 
    time that is other than 1.5 minutes, in which case the fan control 
    shall be permitted to start the blower; or
        (3) The delay time results in the activation of a temperature 
    safety device which shuts off the burner, in which case the fan 
    control shall be permitted to start the blower. In the latter case, 
    if the fan control is adjustable, set it to start the blower at the 
    highest temperature. If the fan control is permitted to start the 
    blower, measure time delay (t-) using a stop watch. Record the 
    measured temperatures. During the heat-up test for oil-fueled 
    furnaces, maintain the draft in the flue pipe within 
    0.01 inch of water column of the manufacturer's 
    recommended on-period draft.
        This Interim Waiver is based upon the presumed validity of 
    statements and all allegations submitted by the company. This 
    Interim Waiver may be removed or modified at any time upon a 
    determination that the factual basis underlying the application is 
    incorrect.
        The Interim Waiver shall remain in effect for a period of 180 
    days or until DOE acts on the Petition for Waiver, whichever is 
    sooner, and may be extended for an additional 180-day period, if 
    necessary.
    
          Sincerely,
    Frank M. Stewart, Jr.,
    Acting Chief of Staff, Energy Efficiency and Renewable Energy.
    
    March 23, 1994.
    Mr. Cyrus Nasseri,
    Assistant Secretary, Conservation, and Renewable Energy, United 
    States Department of Energy, 1000 Independence Avenue, SW., 
    Washington, DC 20585.
    
        Dear Mr. Nasseri: This is a petition for waiver and application 
    for interim waiver submitted pursuant to title 10 CFR 430.27. Waiver 
    is requested from the furnace test procedure as prescribed in 
    appendix N to Subpart B of Part 430. The test procedure requires a 
    1.5 minute delay between burner and blower start-up. Rheem is 
    requesting authorization to use a 20 second delay instead of 1.5 
    minutes for our series (-)GDG upflow, (-)GLH downflow, (-)GVH 
    horizontal, and (-)GPH upflow/horizontal residential gas-fired 
    furnaces.
        Rheem will be manufacturing these appliances with an electronic 
    device that controls the blower operation on a timing sequence as 
    opposed to temperature.
        Improved energy efficiency is achieved by reducing on cycle 
    losses. Under the Appendix N procedures, the stack temperature is 
    allowed to climb at a faster rate than it would with a 20 second 
    blower on time, allowing energy to be lost out of the vent system. 
    This waste of energy would not occur in actual operation. If this 
    petition is granted, the true blower on time delay would be used in 
    the calculations.
        The current test procedures do not give Rheem credit for the 
    energy savings which averages approximately 2%. This improvement is 
    an average reduction of 20% of the normal on cycle energy losses. 
    Rheem is of the opinion that a 20% reduction is a worthwhile energy 
    savings.
        Rheem has been granted previous waivers regarding blower on time 
    to be used in the efficiency calculations for our (-)GEB and (-)GKA 
    series condensing furnaces and/or (-)GDE, (-)GLE, (-)GDG, (-)GLG and 
    (-)GVG series furnaces. Several other manufacturers of gas furnaces 
    have also been granted a waiver to permit calculations based on 
    timed blower operation. Also, ASHRAE Standard 103-1993, paragraph 
    9.5.1.2.2 specifically addresses the use of timed blower operation.
        Confidential and comparative test data is available to you upon 
    your request, confirming the above energy savings.
        Manufacturers that domestically market similar products are 
    being sent a copy of this petition for waiver and petition for 
    interim waiver.
    
          Sincerely,
    Daniel J. Canclini,
    Vice-President, Product Development and Research Engineering.
    [FR Doc. 94-10579 Filed 5-2-94; 8:45 am]
    BILLING CODE 6450-01-P
    
    
    

Document Information

Published:
05/03/1994
Department:
Energy Department
Entry Type:
Uncategorized Document
Action:
Notice.
Document Number:
94-10579
Dates:
DOE will accept comments, data, and information not later than June 2, 1994.
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: May 3, 1994, Case No. F-071