96-11056. ANR Pipeline Company; Notice of Application  

  • [Federal Register Volume 61, Number 87 (Friday, May 3, 1996)]
    [Notices]
    [Pages 19918-19919]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-11056]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    Federal Energy Regulatory Commission
    [Docket No. CP96-338-000]
    
    
    ANR Pipeline Company; Notice of Application
    
    April 29, 1996.
        Take notice that, on April 19, 1996, ANR Pipeline Company (ANR), 
    500 Renaissance Center, Detroit, Michigan 48243, filed an abbreviated 
    application in Docket No. CP96-338-000, pursuant to Section 7(c) of the 
    Natural Gas Act and Part 157 of the Commission's regulations, for a 
    certificate of public convenience and necessity to construct and 
    operate new storage facilities in the Goodwell Storage Field, in 
    Newaygo County, Michigan, all as more fully set forth in the 
    application, which is on file with the Commission and open to public 
    inspection.
        ANR states that data recently obtained from the Goodwell Storage 
    Field's observation wells indicate that the southeastern portion of the 
    storage reservoir cannot be efficiently drained using the storage 
    field's existing injection/withdrawal wells. ANR plans to drill the new 
    horizontal injection/withdrawal well at the southeastern edge of the 
    storage reservoir in the Goodwell Storage Field, and construct 
    approximately 920 feet of 6-inch diameter pipeline to connect the new 
    well to the storage field's gathering system. The estimated cost of the 
    proposed facilities is $568,000.
        ANR states that the new well will improve the injection/withdrawal 
    capability in the southeastern portion of the storage reservoir, and 
    may increase withdrawals slightly toward the end of the storage 
    withdrawal season. ANR adds, however, that the new well will not 
    increase the maximum peak-day deliverability or the maximum working 
    storage capacity of the storage field.
        ANR plans to drill the new well in the SE \1/4\ of Section 9, 
    Goodwell Township, Newaygo County, Michigan, from a surface location 
    127 feet southeast of ANR's Goodwell #57 injection/withdrawal 
    well, encountering the storage reservoir approximately 400 feet 
    southeast of the surface location. ANR plans to complete the new well 
    by drilling approximately 1,500 feet of open drain hole to the 
    southeast, ending in the NW \1/4\ of the NE \1/4\ of Section 16, in 
    Goodwell Township.
        Any person desiring to be heard, or to make any protest with 
    reference to said application should, on or before May 20, 1996, file 
    with the Federal Energy Regulatory Commission, Washington, DC, 20426, a 
    motion to intervene or protest in accordance with the requirements of 
    the Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
    385.211) and the regulations under the Natural Gas Act (18 CFR 157.10). 
    All protests filed with the Commission will be considered by it in 
    determining the appropriate action to be taken, but will not serve to 
    make the protestants parties to the proceeding. Any person wishing to 
    become a party to the proceeding, or to participate as a party in any 
    hearing therein, must file a motion to intervene in accordance with the 
    Commission's Rules.
        Take further notice that, pursuant to the authority contained in 
    and subject to the jurisdiction conferred upon the Federal Energy 
    Regulatory Commission by Sections 7 and 15 of the Natural Gas Act and 
    the Commission's Rules of Practice and Procedure, a hearing will be 
    held without further notice before the Commission or its designee on 
    this application, if no motion to intervene is filed within the time 
    required herein, or if the Commission on its own review of the matter 
    finds that a grant of the certificate is required by the public 
    convenience and necessity. If a motion for leave to intervene is timely 
    filed, or the Commission on its own motion
    
    [[Page 19919]]
    
    believes that a formal hearing is required, further notice of such 
    hearing will be duly given.
        Under the procedure herein provided for, unless otherwise advised, 
    it will be unnecessary for ANR to appear or be represented at the 
    hearing.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 96-11056 Filed 5-2-96; 8:45 am]
    BILLING CODE 6717-01-M
    
    

Document Information

Published:
05/03/1996
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
96-11056
Pages:
19918-19919 (2 pages)
Docket Numbers:
Docket No. CP96-338-000
PDF File:
96-11056.pdf