96-11131. Environmental Impact Statements; Notice of Availability  

  • [Federal Register Volume 61, Number 87 (Friday, May 3, 1996)]
    [Notices]
    [Pages 19931-19932]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-11131]
    
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    
    [ER-FRL-5469-1]
    
    
    Environmental Impact Statements; Notice of Availability
    
         Responsible Agency: Office of Federal Activities, General 
    Information (202) 564-7167 OR (202) 564-7153.
         Weekly receipt of Environmental Impact Statements Filed April 22, 
    1996 through April 26, 1996 pursuant to 40 CFR 1506.9.
         EIS No. 960190, DRAFT EIS, FHW, WI, Burlington Bypass State Trunk 
    Highway Project, Construction, from WI-36, WI-11 and WI-83, Funding and 
    COE Section 404 Permit, City of Burlington, Racine and Walworth 
    Counties, WI, Due: June 24, 1996, Contact: Richard Madrzak (608) 829-
    7510.
         EIS No. 960191, FINAL EIS, BLM, CA, Clear Creek Management Area, 
    Land and Resource Management Plan Amendment, Implementation, San Benito 
    and Fresno Counties, CA, Due: June 03, 1996, Contact: Meg Pearson (408) 
    637-8183.
         EIS No. 960192, FINAL EIS, FAA, NY, Syracuse Hancock International 
    Airport, Land Acquisition and Construction of Runway 10 L-28R, Funding 
    and Airport Layout Plan Approval, Onondaga County, NY, Due: June 03, 
    1996, Contact: Frank Squeglia (718) 553-3325.
         EIS No. 960193, DRAFT EIS, COE, NJ, Absecon Island Interim 
    Feasibility Study, Storm Damage Reduction, Brigantic Inlet to Great Egg 
    Harbor Inlet, Atlantic County, NJ, Due: June 25, 1996, Contact: Ltc. 
    Robert Magnifico (215) 656-6555.
         EIS No. 960194, DRAFT EIS, FHW, FL, Port of Miami Tunnel and 
    Access Improvements, I-395 via MacArthur Causeway Bridge, Dade County, 
    FL, Due: June 17, 1996, Contact: J. R. Skinner (904) 942-9582.
         EIS No. 960195, FINAL SUPPLEMENT, COE, CA, Richmond Harbor Deep 
    Draft Navigation Improvements, Updated and Additional Information, to 
    Improve Navigation Efficiency into the Potrero, San Francisco Bay, 
    Contra Costa County, CA, Due: June 03, 1996, Contact: Linda Ngim (415) 
    744-3341.
         EIS No. 960196, DRAFT EIS, USN, United States Navy Shipboard Solid 
    Waste Disposal, Implementation, MARPOL Special Areas: Designation 
    Baltic Sea, North Sea, Wilder Caribbean, Antarctic Ocean, Mediterranean 
    Sea, Black Sea and Red Sea, Gulf Regions: Persian Gulf and Gulf of 
    Oman, Due: June 17, 1996, Contact: Robert K. Ostermueller (610) 595-
    0759.
         EIS No. 960197, FINAL SUPPLEMENT, IBR, NM, CO, Animas-La Plata 
    Project, Additional Information concerning Agricultural, Municipal and 
    Industrial Water Supplies, Animas and La Plata Rivers, San Juan County, 
    NM and La Plata and Montezuma Counties, CO, Due: June 03, 1996, 
    Contact: Ken Beck (970) 385-6558.
         EIS No. 960198, FINAL EIS, DOE, NM, Medical Isotopes Production 
    Project (MIPP), Establishment and Production of a Continuous Supply of 
    Molybdenum-99 and Related Isotopes, Bernalillo County, NM, Due: June 
    03, 1996, Contact: Wade Carroll (301) 903-7731.
         EIS No. 960199, FINAL EIS, USN, WA, Disposal of Decommissioned, 
    Defueled Cruiser, Ohio Class and Los Angeles Class Naval Reactor 
    Plants, Site Selection, U.S. Department of Energy's Hanford Site, 
    Benton, Franklin and Grant Counties or Puget Sound Naval Shipyard, 
    Bremerton, WA, Due: June 03, 1996, Contact: John Gordon (360) 476-7111.
         EIS No. 960200, FINAL EIS, DOE, WA, Adoption--Disposal of 
    Decommissioned, Defueled Cruiser, Ohio Class and Los Angeles Class 
    Naval Reactor Plants, Site Selection, U.S. Department of Energy's 
    Hanford Site, Benton, Franklin and Grant Counties or Puget Sound Naval 
    Shipyard, Bremerton, WA, Due: June 03, 1996, Contact: Paul F.X. Dunigan 
    (509) 376-6667.
         The U.S. Department of Energy (DOE), has adopted the U.S. 
    Department of the Navy's FEIS #960199, filed with the Environmental 
    Protection Agency on 04-26-96. DOE is a cooperating agency on this 
    project. Recirculation of the document is not necessary under Section 
    1506.3(c) of the Council on Environmental Quality Regulations.
    
    Amended Notices
    
         EIS No. 960007, DRAFT EIS, GSA, DC, Central and West Heating 
    Plants (CHP/WHP) Construction and Operation, Air Quality Improvement 
    Project, District Heating System (DHS), City of Washington, DC, Due: 
    May 24, 1996, Contact: Frank L. Thomas (202) 708-5334. Published FR 01-
    19-96--Review Period Extended.
         EIS No. 960115, DRAFT EIS, FHW, RI, Rhode Island Northeast 
    Corridor Freight Rail Improvement Project, Major Investment Study, 
    Implementation, Boston Switch in Central Falls to the Quonset Point/
    Davisville Industrial Park in North Kingtown, Funding, COE Section 10 
    and 404 Permits, Providence County, RI, Due: May 13, 1996, Contact: K. 
    Robert Sikora (401) 528-4541.
    
    [[Page 19932]]
    
     Published FR 03-15-96--Review Period Extended.
         EIS No. 960159, FINAL EIS, FAA, WI, Dane County Regional Airport, 
    Air Carrier Runway 3-21 Construction and Operation and Associated 
    Actions, Airport Layout Plan Approval and Funding, Dane County, WI, 
    Due: June 03, 1996, Contact: John Dougherty (612) 725-4362. Published 
    FR 04-12-96--Review Period Extended.
    
        Dated: April 30, 1996.
     William D. Dickerson,
    Director, NEPA Compliance Division, Office of Federal Activities.
    [FR Doc. 96-11131 Filed 5-2-96; 8:45 am]
    BILLING CODE 6560-50-P
    
    

Document Information

Published:
05/03/1996
Department:
Environmental Protection Agency
Entry Type:
Notice
Document Number:
96-11131
Pages:
19931-19932 (2 pages)
Docket Numbers:
ER-FRL-5469-1
PDF File:
96-11131.pdf