95-13082. HIE OPCO S.A., et al.; Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 60, Number 103 (Tuesday, May 30, 1995)]
    [Notices]
    [Pages 28094-28097]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-13082]
    
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. EG95-52-000, et al.]
    
    
    HIE OPCO S.A., et al.; Electric Rate and Corporate Regulation 
    Filings
    
    May 22, 1995.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. HIE OPCO S.A.
    
    [Docket No. EG95-52-000]
    
        On May 17, 1995, HIE OPCO S.A. (``HIE OPCO''), 611 Walker, 11th 
    Floor, Houston, Texas 77002, filed with the Federal Energy Regulatory 
    Commission an application for determination of exempt wholesale 
    generator status pursuant to Part 365 of the Commission's regulations.
        HIE OPCO intends to operate a natural gas-fired electric generation 
    facility with a maximum net power production capacity of approximately 
    165 MW to be located in the vicinity of San Nicolas, Argentina.
        Comment date: June 14, 1995, in accordance with Standard Paragraph 
    E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application. [[Page 28095]] 
    
    2. HIE Argener S.A.
    
    [Docket No. EG95-53-000]
    
        On May 17, 1995, HIE Argener S.A. (``HIE Argener''), 611 Walker, 
    11th Floor, Houston, Texas 77002, filed with the Federal Energy 
    Regulatory Commission an application for determination of exempt 
    wholesale generator status pursuant to Part 365 of the Commission's 
    regulations.
        HIE Argener intends to own a natural gas-fired electric generation 
    facility with a maximum net power production capacity of approximately 
    165 MW to be located in the vicinity of San Nicolas, Argentina.
        Comment date: June 14, 1995, in accordance with Standard Paragraph 
    E at the end of this notice. The Commission will limits consideration 
    of comments to those that concern the adequacy or accuracy of the 
    application.
    
    3. DC Tie, Inc.
    
    [Docket No. ER91-435-015]
    
        Take notice that on April 28, 1995, DC Tie, Inc. tendered for 
    filing certain information as required by the Commission's order dated 
    July 11, 1991. Copies of informational filing are on file with the 
    Commission and are available for public inspection.
    
    4. Enron Power Marketing, Inc.
    
    [Docket No. ER94-24-008]
    
        Take notice that on May 1, 1995, Enron Power Marketing, Inc. 
    tendered for filing certain information as required by the Commission's 
    order dated December 2, 1993. Copies of informational filing are on 
    file with the Commission and are available for public inspection.
    
    5. CMEX Energy, Inc.
    
    [Docket No. ER94-1328-003]
    
        Take notice that on April 24, 1995, CMEX Energy, Inc. tendered for 
    filing certain information as required by the Commission's letter order 
    dated July 12, 1994. Copies of informational filing are on file with 
    the Commission and are available for public inspection.
    
    6. ACME Power Marketing, Inc.
    
    [Docket No. ER94-1530-002]
    
        Take notice that on April 28, 1995, ACME Power Marketing, Inc. 
    tendered for filing certain information as required by the Commission's 
    order dated October 18, 1994. Copies of informational filing are on 
    file with the Commission and are available for public inspection.
    
    7. Engelhard Power Marketing Inc.
    
    [Docket No. ER94-1690-003]
    
        Take notice that on April 26, 1995, Engelhard Power Marketing, Inc. 
    tendered for filing certain information as required by the Commission's 
    order dated December 29, 1994. Copies of informational filing are on 
    file with the Commission and are available for public inspection.
    
    8. Power Exchange Corporation
    
    [Docket No. ER95-72-001]
    
        Take notice that on May 9, 1995, Power Exchange Corporation (PXC) 
    filed certain information as required by the Commission's February 1, 
    1995 order. Copies of PXC's informational filing are on file with the 
    Commission and are available for public inspection.
    
    9. National Power Management Co.
    
    [Docket No. ER95-192-001]
    
        Take notice that on May 8, 1995, National Power Management Company 
    tendered for filing certain information as required by the Commission's 
    letter order. Copies of informational filing are on file with the 
    Commission and are available for public inspection.
    
    10. Howard Energy Company, Inc.
    
    [Docket No. ER95-252-001]
    
        Take notice that on May l, 1995, Howard Energy Company, Inc. 
    tendered for filing certain information as required by the Commission's 
    order dated February 24, 1995. Copies of informational filing are on 
    file with the Commission and are available for public inspection.
    
    11. Stand Energy Corp.
    
    [Docket No. ER95-362-001]
    
        Take notice that on May 10, 1995, Stand Energy Corporation, 
    tendered for filing certain information as required by the Commission's 
    letter order dated February 24, 1995. Copies of informational filing 
    are on file with the Commission and are available for public 
    inspection.
    
    12. Rig Gas Inc.
    
    [Docket No. ER95-480-001]
    
        Take notice that on April 24, 1995, Rig Gas Inc. (Rig) filed 
    certain information as required by the Commission's March 16, 1995 
    letter order in docket No. ER95-480-000. Copies of Rig's informational 
    filing are on file with the Commission and are available for public 
    inspection.
    
    13. Western Resources, Inc.
    
    [Docket No. ER95-615-000]
    
        Take notice that on May 3, 1995, Western Resources, Inc. (Western 
    Resources) tendered for filing an amendment to its February 16, 1995, 
    filing in this docket. The filing modifies a proposed Participation 
    Power Agreement between Western Resources and The Empire District 
    Electric Company (EDE).
    
    14. Pennsylvania Power & Light Co.
    
    [Docket No. ER95-782-000]
    
        Take notice that on May 11, 1995, Pennsylvania Power & Light 
    Company (PP&L), tendered for filing with the Federal Energy Regulatory 
    Commission supplemental material relating to the above docket.
    
    15. Wisconsin Power & Light Co.
    
    [Docket No. ER95-861-000]
    
        Take notice that on May 3, 1995, Wisconsin Power & Light Company 
    (WP&L) tendered for filing an amendment to its filing dated April 3, 
    1995 relating to a revised Wholesale Power Agreement dated January 18, 
    1995, between the Village of Mazomanie and WP&L. WP&L states that this 
    amendment corrects the April 3 filing with respect to two facts 
    included erroneously in that filing. Those facts, and the amendments to 
    them, are as follows:
        The April 3 filing referred to the date of the previous agreement 
    between the parties as December 4, 1980--the actual date of the 
    previous agreement between the parties was December 4, 1990--and the 
    April 3 filing is amended to reflect the correct date; and
        The April 3 filing referred to the FERC Rate Schedule Number 140--
    the correct FERC Rate Schedule Number is 162 which superseded 140--and 
    the April 3 filing is amended to refer to FERC Rate Schedule 162.
        All other factors with respect to the April 3 filing are correct. 
    WP&L states that copies of the amended Wholesale Power Agreement and 
    this filing have been provided to the Village of Mazomanie and the 
    Public Service Commission of Wisconsin.
        Comment date: June 2, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    16. Rainbow Energy Marketing Corp.
    
    [Docket No. ER95-918-000]
    
        Take notice that on May 8, 1995, Rainbow Energy Marketing 
    Corporation (REMC) filed a Withdrawal of a service agreement between 
    Rainbow Energy Marketing Corporation and the Rochester Gas and Electric 
    Corporation.
        Rainbow Energy Marketing Corporation hereby wishes to withdraw the 
    service agreement between Rainbow Energy Marketing Corporation and the 
    [[Page 28096]] Rochester Gas and Electric Corporation which was filed 
    with FERC Docket No. ER95-918. This request is being made because REMC 
    was not required to file the agreement.
        Copies of this filing have been sent to Rochester Gas and Electric 
    Corporation and the New York Public Service Commission.
        Comment date: June 5, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    17. Rainbow Energy Marketing Corp.
    
    [Docket No. ER95-921-000]
    
        Take notice that on May 8, 1995, Rainbow Energy Marketing 
    Corporation (REMC) filed a Withdrawal of a service agreement between 
    Rainbow Energy Marketing Corporation and the City of Anaheim.
        Rainbow Energy Marketing Corporation hereby wishes to withdraw the 
    service agreement between Rainbow Energy Marketing Corporation and the 
    City of Anaheim which was filed with FERC Docket No. ER95-921. This 
    request is being made because REMC was not required to file the 
    agreement.
        Copies of this filing have been sent to the City of Anaheim and the 
    California Public Utility Commission.
        Comment date: June 5, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    18. Rainbow Energy Marketing Corp.
    
    [Docket No. ER95-922-000]
    
        Take notice that on May 8, 1995, Rainbow Energy Marketing 
    Corporation (REMC) filed a Withdrawal of a service agreement between 
    Rainbow Energy Marketing Corporation and Southern Municipal Power 
    Agency.
        Rainbow Energy Marketing Corporation hereby wishes to withdraw the 
    service agreement between Rainbow Energy Marketing Corporation and 
    Southern Minnesota Municipal Power Agency which was filed with FERC 
    Docket No. ER95-922. This request is being made because REMC was not 
    required to file the agreement.
        Copies of this filing have been sent to Southern Minnesota 
    Municipal Power Agency and the Minnesota Public Service Commission.
        Comment date: June 5, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    19. Rainbow Energy Marketing Corp.
    
    [Docket No. ER95-923-000]
    
        Take notice that on May 2, 1995, Rainbow Energy Marketing 
    Corporation (REMC) filed a Withdrawal of a service agreement between 
    Rainbow Energy Marketing Corporation and Minnkota Power Cooperative, 
    Inc.
        Rainbow Energy Marketing Corporation hereby wishes to withdraw the 
    service agreement between Rainbow Energy Marketing Corporation and 
    Minnkota Power Cooperative, Inc. which was filed with FERC Docket No. 
    ER95-923. This request is being made because REMC was not required to 
    file the agreement.
        Copies of this filing have been sent to Minnkota Power Cooperative, 
    Inc. and the North Dakota Public Service Commission.
        Comment date: June 5, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    20. Florida Power & Light Co.
    
    [Docket No. ER95-938-000]
    
        Take notice that on April 21, 1995, Florida Power & Light Company 
    (FPL) tendered for filing proposed Service Agreement with the City of 
    Tallahassee for transmission service under FPL's Transmission Tariff 
    Nos. 2 and 3.
        FPL requests that the proposed Service Agreement be permitted to 
    become effective May 1, 1995, as soon thereafter as practicable.
        Comment date: June 5, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    21. Idaho Power Co.
    
    [Docket No. ER95-1022-000]
    
        Take notice that on May 8, 1995, Idaho Power Company (IPC), 
    tendered for filing a term extension for specified transmission 
    services provided pursuant to the Restated Transmission Service 
    Agreement between Idaho Power Company and PacifiCorp Electric 
    Operations.
        Comment date: June 5, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    22. Entergy Services, Inc.
    
    [Docket No. ER95-1023-000]
    
        Take notice that on May 8, 1995, Entergy Services, Inc. (Entergy 
    Services) on behalf of Arkansas Power & Light Company, Gulf States 
    Utilities Company, Louisiana Power & Light Company, Mississippi Power & 
    Light Company, and New Orleans Public Service Inc., tendered for filing 
    a Transmission Service Agreement (TSA) between Entergy Services and 
    Central and South West Services, Inc., acting as agent for Southwestern 
    Electric Power Company (SWEPCO). Entergy Services states that the TSA 
    sets out the transmission arrangements under which the Entergy 
    Operating Companies' will provide SWEPCO firm and non-firm transmission 
    service under Entergy Services Transmission Service Tariff, in 
    connection with service by SWEPCO to the City of Minden, Louisiana.
        Comment date: June 5, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    23. Entergy Services, Inc.
    
    [Docket No. ER95-1024-000]
    
        Take notice that on May 8, 1995, Entergy Services, Inc. (Entergy 
    Services), on behalf of Arkansas Power & Light Company, Gulf States 
    Utilities Company, Louisiana Power & Light Company, Mississippi Power & 
    Light Company, and New Orleans Public Service Inc., tendered for filing 
    a Transmission Service Agreement (TSA) between Entergy Services and 
    Central Louisiana Electric Company (CLECO). Entergy Services states 
    that the TSA sets out the transmission arrangements under which the 
    Entergy Operating Companies' will provide CLECO firm transmission 
    service under Entergy Services Transmission Service Tariff, in 
    connection with service by CLECO to the City of St. Martinville, 
    Louisiana.
        Comment date: June 5, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    24. Orange and Rockland Utilities, Inc.
    
    [Docket No. ER95-1026-000]
    
        Take notice that on May 9, 1995, Orange and Rockland Utilities, 
    Inc. (Orange and Rockland), tendered for filing as a rate schedule an 
    executed agreement dated November 11, 1994, between Orange and Rockland 
    and Enron Power Marketing, Inc. for the sale of interruptible power and 
    energy by and between Orange and Rockland and Enron Power Marketing, 
    Inc.
        The rate schedule provides for an economy reservation charge for 
    Orange and Rockland not to exceed $14.79/MWH scheduled and an energy 
    charge equal for the seller's marginal system cost.
        Orange and Rockland requests waiver of the notice requirements of 
    Sec. 35.3 of the Commission's regulations so that the proposed rate 
    schedule can be made effective April 15, 1995 in accordance with the 
    anticipated utilization by the parties.
        Orange and Rockland states that a copy of its filing was served on 
    Enron Power Marketing, Inc.
        Comment date: June 5, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    25. Orange and Rockland Utilities, Inc.
    
    [Docket No. ER95-1027-000]
    
        Take notice that on May 9, 1995, Orange and Rockland Utilities, 
    Inc. (Orange and Rockland), tendered for [[Page 28097]] filing as a 
    rate schedule an executed agreement dated December 1, 1994, between 
    Orange and Rockland and Long Island Lighting Company (LILCO) for the 
    sale of interruptible power and energy by Orange and Rockland to LILCO.
        The rate schedule provides for an economy reservation charge for 
    Orange and Rockland not to exceed $14.79/MWH scheduled and an energy 
    charge equal to the Orange and Rockland's marginal system cost.
        Orange and Rockland requests waiver of the notice requirements of 
    Sec. 35.3 of the Commission's Regulations so that the proposed rate 
    schedule can be made effective April 15, 1995 in accordance with the 
    anticipated utilization by the parties.
        Orange and Rockland states that a copy of its filing was served on 
    Long Island Lighting Company.
        Comment date: June 5, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    26. Consolidated Edison Company of New York, Inc.
    
    [Docket No. ER95-1028-000]
    
        Take notice that on May 9, 1995, Consolidated Edison Company of New 
    York, Inc. (Con Edison), tendered for filing an agreement with 
    Engelhard Power Marketing, Inc. (Engelhard) to provide for the sale of 
    energy and capacity. For energy sold by Con Edison the ceiling rate is 
    100 percent of the incremental energy cost plus up to 10 percent of the 
    SIC (where such 10 percent is limited to 1 mill per kWhr when the SIC 
    in the hour reflects a purchased power resource). The ceiling rate for 
    capacity sold by Con Edison is $7.70 per megawatt hour. All energy and 
    capacity sold by Engelhard will be at market-based rates.
        Con Edison states that a copy of this filing has been served by 
    mail upon Engelhard.
        Comment date: June 5, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    27. Pacific Gas and Electric Co.
    
    [Docket No. ER95-1029-000]
    
        Take notice that on May 9, 1995, Pacific Gas and Electric Company 
    (PG&E), tendered for filing a Power Scheduling Agreement dated May 1, 
    1995, (the Agreement), between the M-S-R Public Power Agency (M-S-R) 
    and PG&E. M-S-R is a joint exercise of powers agency organized under 
    California law with the Cities of Santa Clara and Redding and the 
    Modesto Irrigation District as its members. The Agreement enables M-S-R 
    to act as agent for its members for the purpose of scheduling certain 
    electric power into, out of, or through the PG&E control area.
        Copies of this filing have been served upon M-S-R and the 
    California Public Utilities Commission.
        Comment date: June 5, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    28. El Paso Electric Co.
    
    [Docket No. ES94-18-003]
    
        Take notice that on May 19, 1995, El Paso Electric Company (El 
    Paso) filed an application under section 204 of the Federal Power Act 
    seeking authorization through the remaining term of its Maricopa County 
    Adjustable Tender Pollution Control Revenue Bonds, 1994 Series A ($63.5 
    million principal amount):
         To enter into extensions of an existing letter of credit 
    issued by Citibank, N.A., or
         To enter into replacement letters of credit with the same 
    or different financial institutions, and
         To undertake any necessary and appropriate actions in 
    connection with any such extensions and replacements for the letter of 
    credit.
        Also, El Paso requests exemption from the Commission's competitive 
    bidding and negotiated placement regulations.
        Comment date: June 2, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    29. Peter W. Likins
    
    [Docket No. ID-2884-000]
    
        Take notice that on May 1, 1995, Peter W. Likins (Applicant) 
    tendered for filing an application under section 305(b) of the Federal 
    Power Act to hold the following positions:
    
    Trustee, Consolidated Edison Company of New York
    Director, Parker-Hannifin Corporation
    
        Comment date: June 5, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    Standard Paragraphs.
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 825 North Capitol Street, NE., Washington, DC 
    20426, in accordance with rules 211 and 214 of the Commission's rules 
    of practice and procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of this filing are on file with the 
    Commission and are available for public inspection.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 95-13082 Filed 5-26-95; 8:45 am]
    BILLING CODE 6717-01-P
    
    

Document Information

Published:
05/30/1995
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
95-13082
Dates:
June 14, 1995, in accordance with Standard Paragraph E at the end of this notice. The Commission will limit its consideration of comments to those that concern the adequacy or accuracy of the application. [[Page 28095]]
Pages:
28094-28097 (4 pages)
Docket Numbers:
Docket No. EG95-52-000, et al.
PDF File:
95-13082.pdf