94-13135. Availability of the Draft Environmental Assessment on the Proposed Building Re-Construction at Hanalei National Wildlife Refuge, Kauai, HI  

  • [Federal Register Volume 59, Number 103 (Tuesday, May 31, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-13135]
    
    
    [[Page Unknown]]
    
    [Federal Register: May 31, 1994]
    
    
    -----------------------------------------------------------------------
    
    
    DEPARTMENT OF THE INTERIOR
     
    
    Availability of the Draft Environmental Assessment on the 
    Proposed Building Re-Construction at Hanalei National Wildlife Refuge, 
    Kauai, HI
    
    AGENCY: Fish and Wildlife Service, Interior.
    
    ACTION: Notice of availability.
    
    -----------------------------------------------------------------------
    
    SUMMARY: This notice advises the public that the draft Environmental 
    Assessment (EA) on the proposed building re-construction at Hanalei 
    National Wildlife Refuge, Kauai, Hawaii, is available for public 
    review.
    
    WRITTEN COMMENTS INFORMATION: Interested agencies, organizations, and 
    individuals are encouraged to provide written comments to the U.S. Fish 
    and Wildlife Service (Service) within 30 days after publication of this 
    Notice. Address comments to the project leader as shown below.
    
    FOR FURTHER INFORMATION CONTACT:
    Jerry Leineck, Project Leader, Hawaiian and Pacific Island NWR Complex, 
    P.O. Box 50167, Honolulu, HI 96850, (808) 541-1201.
        Copies of the Draft EA have been provided to interested or affected 
    agencies and individuals. Those agencies and individuals not on the 
    Service's mailing list and wishing copies of the this Draft EA for 
    review should immediately contact the above individual.
    
    SUPPLEMENTARY INFORMATION: The U.S. Fish and Wildlife Service, 
    Department of the Interior, has prepared a Draft EA on its proposal to 
    rebuild facilities at Hanalei National Wildlife Refuge to replace those 
    lost during Hurricane Iniki.
        This action would re-construct vehicle and shop buildings needed to 
    protect vehicles and equipment. It would also provide a safe working 
    space for maintenance staff. Rebuilding the office and lab will support 
    refuge management activities. Replacement of the residence for a refuge 
    employee will provide 24 hour on call/on-site maintenance of ponds and 
    irrigation systems, improved law enforcement, visitor protection, and 
    protection for endangered waterbirds.
        The proposed action would not have a significant effect on the 
    human environment since it repairs and replaces facilities at the 
    existing sites to the approximate conditions and functions at the time 
    of the damage.
        The major alternatives under consideration that were analyzed and 
    evaluated during planning are:
        (1) Preferred alternative, construct a residence with attached 
    carport and an office/shop building at the existing headquarters site 
    and a reduced storage building at another on refuge site;
        (2) Construct a residence with detached garage, a vehicle storage 
    building, and a maintenance shop/office building at the existing site;
        (3) Construct all facilities at the Transfer Site;
        (4) Construct all facilities at the Impoundment D Site;
        (5) Construct all facilities at sites off refuge; and
        (6) No Action.
        Other government agencies and several members of the general public 
    contributed to the planning and evaluation of the proposal and to the 
    preparation of this draft EA. A series of public information meetings 
    and on-site visits were initiated beginning November 1992. The public 
    was invited to review designs and blueprints at public informational 
    meetings held in June 1993. Detailed information concerning 
    consultation and coordination is contained in section VI of the draft 
    EA.
        All interested agencies and individuals are urged to review and 
    provide comments on this Draft EA as soon as possible. All comments 
    received during the designated comment period will be considered in 
    preparation of the final EA for this action.
    
        Dated: May 24, 1994.
    Marvin L. Plenert,
    Regional Director, U.S. Fish and Wildlife Service.
    [FR Doc. 94-13135 Filed 5-27-94; 8:45 am]
    BILLING CODE 4310-55-M
    
    
    

Document Information

Published:
05/31/1994
Department:
Interior Department
Entry Type:
Uncategorized Document
Action:
Notice of availability.
Document Number:
94-13135
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: May 31, 1994