[Federal Register Volume 61, Number 106 (Friday, May 31, 1996)]
[Notices]
[Pages 27346-27347]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-13715]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-5470-1]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared May 13, 1996 Through May 17,
1996 pursuant to the Environmental Review Process (ERP), under Section
309 of the Clean Air Act and Section 102(2)(c) of the National
Environmental Policy Act as amended. Requests for copies of EPA
comments can be directed to the Office of Federal Activities at (202)
564-7167. An explanation of the ratings assigned to draft environmental
impact statements (EIS) was published in F.R. dated April 05, 1996 (61
F.R. 15251).
Draft EIS
ERP No. D-COE-E32076-NC Rating EC2, Cape Fear-Northeast Cape Fear
Rivers Feasibility Study for Deepening of the Wilmington Harbor Ship
Channel, Navigation Improvement, New Hanover and Brunswick Counties,
NC.
Summary: EPA expressed environmental concerns about the potential
adverse impacts associated with use of explosives to excavate the
enlarged channel and awaits the results of on-going studies to
determine the significance of this dredging technique.
ERP No. D-COE-K36116-CA Rating EC2, San Pedro Creek Section 205
Flood Control Project, Construction, Flood Protection, COME Section 10
and 404 Permits and Permits Approval, San Mateo County, CA.
Summary: EPA expressed environmental concerns over potential
impacts to riverain habitat, impacts to air quality, and potential
cumulative impacts of the project, including possible increased runoff
and siltation.
ERP No. D-FRC-L05215-OR Rating EO2, Leaburg-Walterville
Hydroelectric (FERC. No. 2496) Project, Issuance of New License
(Relicense), Funding and Land Trust Acquisition, McKenzie River, Lane
County, OR.
Summary: EPA expressed environmental objections over continued
impacts on fish and other aquatic life in the McKenzie River due to
project operation. In addition, EPA commented that the draft EIS did
not provide a comprehensive analysis of cumulative impacts, nor was the
no-action alternative appropriately characterize.
ERP No. D-USN-K11067-AZ Rating EC2, Yuma Training Range Complex
Management, Operation and Development, Marine Corps Air Station Yuma,
Goldwater Range, Yuma and La Paz Cos; and Chocolate Mountain Range,
Imperial and Riverside Counties, CA.
Summary: EPA expressed environmental concerns regarding
alternatives analysis, cumulative impacts issues, and biological
impacts.
ERP No. D-USN-K11069-CA Rating EC2, Port Hueneme Naval Civil
Engineering Laboratory (NCEL) Disposal and Reuse, Implementation,
Ventura County, CA.
Summary: EPA requested further information on air quality and
wetlands NEPA issues.
ERP No. DB-COE-E30032-FL Rating EC2, Palm Beach County Beach
Erosion Project, Updated Information concerning Shore Protection for
the Ocean Ridge Segment from the Martin County line to Lake Worth Inlet
and from the South Lake Worth Inlet to the Broward County Line, Palm
Beach, Martin and Broward Counties, FL.
Summary: EPA expressed environmental concerns regarding the long-
term consequences of this action and other beach nourishment projects
planned for the county's shoreline. The additional information derived
from the mitigation and subsequent monitoring plan will be necessary to
determine how this project fits into the larger issue of the
environmental consequences of proposed shoreline protection.
ERP No. DS-COE-E32192-NC Rating EC2, Wilmington Harbor Channel
Widening and Navigation Improvement, Updated Information, Cape Fear
River, Port of Wilmington, New Hanover and Brunswick Counties, NC.
Summary: EPA expressed environmental concerns about the potential
adverse impacts associated with use of explosives to excavate the
enlarged channel and seeks additional data on the long-term
consequences of these excavation techniques.
ERP No. DS-COE-E36169-FL Rating LO, Central and Southern Florida
Flood Control Project, Restoration of the Upper Kissimmee River Basin
through the Headwater Revitalization Project and the Lower Kissimmee
River Basin through the Level II Backfilling Plan, Implementation,
Updated Information, Glades, Osceda Highlands, Polk, Okeechobee and
Orange Counties, FL.
Summary: EPA had no objections to this proposal.
Final EIS
ERP No. F-COE-C36071-PR Rio Fajardo Flood Control Feasibility Study
for Flood Protection, Implementation, PR.
Summary: EPA had no objection to the proposed action.
[[Page 27347]]
ERP No. F-USA-K11059-CA Hamilton Army Airfield Disposal and Reuse,
Implementation, City of Novato, Marin County, CA.
Summary: EPA environmental concerns were mostly answered
satisfactorily in the Final EIS. One minor biological resources issue
remains unresolved.
Dated: May 28, 1996.
Katherine B. Biggs,
Associate Director, NEPA Compliance Division, Office of Federal
Activities.
[FR Doc. 96-13715 Filed 5-30-96; 8:45 am]
BILLING CODE 6560-50-P