[Federal Register Volume 60, Number 86 (Thursday, May 4, 1995)]
[Notices]
[Pages 22055-22056]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-10990]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER94-1612-002, et al.]
Destec Power Services, Inc., et al.; Electric Rate and Corporate
Regulation Filings
April 27, 1995.
Take notice that the following filings have been made with the
Commission:
1. Destec Power Services, Inc.
[Docket No. ER94-1612-002]
Take notice that on April 10, 1995, Destec Power Services, Inc.
tendered for filing a letter reporting no activity for the quarter
ending March 31, 1995.
2. Utility-2000 Power Corporation
[Docket No. ER95-187-001]
Take notice that on April 10, 1995, Utility-2000 Power Corporation
tendered for filing a letter reporting no activity for the quarter
ending March 31, 1995.
3. Industrial Gas & Electric Services Company
[Docket No. ER95-257-001]
Take notice that on April 3, 1995, Industrial Gas & Electric
Services Company tendered for filing its quarterly report in the above-
referenced docket, reporting no purchases or sales of electricity in
the quarter ending March 31, 1995.
4. Kaztex Energy Services, Inc.
[Docket No. ER95-295-001]
Take notice that on April 17, 1995, Kaztex Energy Services, Inc.
(KES) filed certain information as required by the Commission's
February 24, 1995, letter order in Docket No. ER95-295-000. Copies of
KES's informational filing are on file with the Commission and are
available for public inspection.
5. Rayburn Electric Cooperative, Inc.
[Docket No. ER95-898-000]
Take notice that on April 12, 1995, Rayburn Electric Cooperative,
Inc. (Rayburn Electric) tendered for filing its Application for
Authority to Change Rate. Rayburn Electric seeks to reduce its uniform,
system-wide rate to allow all of its members to share in the cost
savings projected by Rayburn Electric.
Comment date: May 11, 1995, in accordance with Standard Paragraph
(E) at the end of this notice.
6. LG&E Power Marketing Inc.
[Docket No. ER95-913-000]
Take notice that on April 13, 1995, LG&E Power Marketing Inc. (LPM)
tendered for filing a letter from the Executive Committee of the
Western Systems Power Pool (WSPP) indicating that LPM had completed all
the steps for pool membership. LPM requests that the Commission amend
the WSPP Agreement to include it as a member.
LPM requests an effective date of March 31, 1995, for the proposed
amendment. Accordingly, LPM requests waiver of the Commission's notice
requirements for good cause shown.
Copies of the filing were served upon the WSPP Executive Committee.
Comment date: May 11, 1995, in accordance with Standard Paragraph
(E) at the end of this notice.
7. Electric Power Clearinghouse
[Docket No. ER95-914-000]
Take notice that on April 11, 1995, Electric Power Clearinghouse
tendered for filing an application for authorization to do business as
a Power Marketer.
Comment date: May 11, 1995, in accordance with Standard Paragraph
(E) at the end of this notice.
8. Southwestern Electric Power Company
[Docket No. ER95-927-000]
Take notice that on April 19, 1995, Southwestern Electric Power
Company (SWEPCO), submitted for filing a Power Supply Agreement (PSA)
dated March 13, 1995, between SWEPCO and the City of Minden, Louisiana
(Minden). Pursuant to the PSA, SWEPCO will, effective May 1, 1995,
supply Minden's full requirements in excess of the power and energy
generated by Minden's own unit and Minden's hydro entitlement from the
Southwestern Power Administration.
SWEPCO seeks an effective date of May 1, 1995, and, accordingly,
seeks waiver of the Commission's notice requirements. SWEPCO served
copies of the filing on Minden and the Louisiana Public Service
Commission.
Comment date: May 11, 1995, in accordance with Standard Paragraph
(E) at the end of this notice.
9. Louisville Gas and Electric Company
[Docket No. ER95-928-000]
Take notice that on April 19, 1995, Louisville Gas and Electric
Company (Louisville), tendered for filing a new Interchange Agreement
between Public Service Electric and Gas Company (PSE&G) and Louisville.
The Interchange Agreement allows transactions between Louisville to
PSE&G.
A copy of the filing was served upon the Kentucky Public Service
Commission.
Comment date: May 11, 1995, in accordance with Standard Paragraph
(E) at the end of this notice.
10. Arizona Public Service Company
[Docket No. ER95-929-000]
Take notice that on April 19, 1995, Arizona Public Service Company
(APS) tendered for filing a Service Agreement under APS-FERC Electric
Tariff Original Volume No. 1 (APS Tariff) with the following entities.
Howell Power Systems
InterCoast Power Marketing Company
Rainbow Energy Marketing Corporation
A copy of this filing has been served on the above listed entities
and the Arizona Corporation Commission.
Comment date: May 11, 1995, in accordance with Standard Paragraph
(E) at the end of this notice.
11. Commonwealth Edison Company
[Docket No. ER95-930-000]
Take notice that on April 21, 1995, Commonwealth Edison Company
(ComEd), submitted a Service Agreement, dated March 16, 1995,
establishing Dairyland Power Cooperative (Dairyland) as a customer
under the terms of ComEd's Power Sales Tariff PS-1 (PS-1 Tariff). The
Commission has previously designated the PS-1 Tariff as FERC Electric
Tariff, Original Volume No. 2.
ComEd requests an effective date of March 16, 1995, and accordingly
seeks waiver of the Commission's requirements. [[Page 22056]]
Copies of this filing were served upon Dairyland and the Illinois
Commerce Commission.
Comment date: May 11, 1995, in accordance with Standard Paragraph
(E) at the end of this notice.
12. PECO Energy Company
[Docket No. ER95-931-000]
Take notice that on April 21, 1995, PECO Energy Company (PECO),
tendered for filing an Agreement between PECO and CINergy Services,
Incorporated (CINergy) dated February 14, 1995.
PECO states that the Agreement sets forth the terms and conditions
for the sale of system energy which it expects to have available for
sale from time to time and the purchase of which will be economically
advantageous to CINergy. In order to optimize the economic advantage to
both PECO and CINergy, PECO requests that the Commission waive its
customary notice period and permit the agreement to become effective on
April 24, 1995.
PECO states that a copy of this filing has been set to CINergy and
will be furnished to the Pennsylvania Public Utility Commission.
Comment date: May 11, 1995, in accordance with Standard Paragraph
(E) at the end of this notice.
13. Alabama Power Company
[Docket No. ER95-912-000]
Take notice that on April 18, 1995, Alabama Power Company tendered
for filing a Transmission Service Delivery Point Agreement dated
January 27, 1995, which reflects the addition of a delivery point to
Baldwin County Electric Membership Cooperative. This delivery point
will be served under the terms and conditions of the Agreement for
Transmission Service to Distribution Cooperative Member of Alabama
Electric Cooperative, Inc., dated August 28, 1980 (designated FERC Rate
Schedule No. 147). The parties request an effective date of July 4,
1995, for the addition of the delivery point.
Comment date: May 11, 1995, in accordance with Standard Paragraph
(E) at the end of this notice.
14. Northern States Power Company (Minnesota); Northern States
Power Company (Wisconsin)
[Docket No. ER95-915-000]
Take notice that on April 13, 1995, Northern States Power Company--
Minnesota (NSP-M) and Northern States Power Company--Wisconsin (NSP-W)
jointly tendered and requested the Commission to accept two
Transmission Service Agreements which provide for Limited and
Interruptible Transmission Service to Cenergy, Inc.
NSP requests that the Commission accept for filing both
Transmission Agreements effective on April 17, 1995. NSP requests a
waiver of the Commission's notice requirements pursuant to Part 35 of
the Commission's regulations so the Agreement may be accepted for
filing effective on the date requested.
Comment date: May 11, 1995, in accordance with Standard Paragraph
(E) at the end of this notice.
Standard Paragraphs
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 825 North Capitol Street, NE., Washington, DC
20426, in accordance with Rules 211 and 214 of the Commission's Rules
of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the
Commission and are available for public inspection
Lois D. Cashell,
Secretary.
[FR Doc. 95-10990 Filed 5-3-95; 8:45 am]
BILLING CODE 6717-01-M