04-10065. Office of Fossil Energy; Notice of Filings of Coal Capability Powerplant and Industrial Fuel Use Act  

  • Start Preamble

    AGENCY:

    Office of Fossil Energy, DOE.

    ACTION:

    Notice of filings.

    SUMMARY:

    The owners/operators of thirteen baseload electric powerplants have submitted coal capability self-certifications pursuant to section 201 of the Powerplant and Industrial Fuel Use Act of 1978 (FUA) and Department of Energy (DOE) regulations in 10 CFR 501.60.61.

    ADDRESSES:

    Copies of self-certification filings are available for public inspection, upon request, in the Office of Coal & Power Import/Export, Fossil Energy, Room 4G-039, FE-27, Forrestal Building, 1000 Independence Avenue, SW., Washington, DC 20585.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Ellen Russell at (202) 586-9624.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Title II of FUA, as amended (42 U.S.C. 8301 et seq.), provides that no new baseload electric powerplants may be constructed or operated without the capability to use coal or another alternate fuel as a primary energy source pursuant to FUA section 201(d), in order to meet the requirement of coal capability, the owner or operator of such facilities proposing to use natural gas or petroleum as its primary energy source shall certify to the Secretary of Energy (Secretary) prior to construction, or prior to operation as a base load electric powerplant, that such powerplant has the capability to use coal or another alternate fuel. Such certification establishes compliance with FUA section 201(a) as of the date filed with the Secretary. The Secretary is required to publish a notice in the Federal Register that a certification has been filed. The following owners/operators of proposed new baseload electric powerplants have filed self-certifications pursuant to FUA section 201(d) and in accordance with DOE regulations in 10 CFR 501.60, 61.

    Owner operatorCapacityPlant locationIn-service date
    Deer Park Energy Center, L.P950 MWDeer Park, TXJan. 2003.
    Riverside Energy Center, LLC600 MWBeloit, WIJune 2004.
    Riverview Energy Center, LLC45 MWPleasanton, CA1st Qtr. 2003.
    Reliant Energy Bighorn, LLC580 MWPrimm, NVJune 27, 2003
    Brookhaven Energy, L.P540 MWBrookhaven, NY1st Qtr. 2006.
    Plymouth Energy LLC307 MWPlymouth, WADec. 2006.
    South Carolina Electric & Gas Co.875 MWJasper County, S.C.May 1, 2004.
    Start Printed Page 24590
    Interstate Power & Light Co.565 MWCerro Gordo Cty, IowaJune 2004.
    Cottonwood Energy Company L.P1220 MWDeweyville, TXJuly 10, 2003.
    PacifiCorp—Generation525 MWMona, UtahJune 2005.
    Rocky Moutain Energy Ctr, LLC480 MWKeenesburg, COJune 2004.
    Fox Energy Company LLC235 MWKaukauna, WIJune 2005.
    MEP Pleasant Hill, LLC585 MWPleasant Hill, MIFeb. 27, 2002.
    Start Signature

    Issued in Washington, DC, on April 28, 2004.

    Anthony J. Como,

    Deputy Director, Electric Power Regulation, Office of Coal & Power Import/Export, Office of Coal & Power Systems, Office of Fossil Energy.

    End Signature End Supplemental Information

    [FR Doc. 04-10065 Filed 5-3-04; 8:45 am]

    BILLING CODE 6450-01-P

Document Information

Published:
05/04/2004
Department:
Energy Department
Entry Type:
Notice
Action:
Notice of filings.
Document Number:
04-10065
Pages:
24589-24590 (2 pages)
Docket Numbers:
Certification Notice-211
PDF File:
04-10065.pdf