2010-10497. Drawbridge Operation Regulation; CSX Railroad, Trout River, Mile 0.9, Jacksonville, FL  

  • Start Preamble

    AGENCY:

    Coast Guard, DHS.

    ACTION:

    Final rule.

    SUMMARY:

    The Coast Guard is changing the regulation governing the operation of the CSX Railroad Bridge across the Trout River, mile 0.9, Jacksonville, Florida. This rule will allow the bridge to operate using an automated system, without an onsite bridge tender. Currently, the bridge is required to open on signal from 6 a.m. until 10 p.m.; and from 10 p.m. until 6 a.m. the draw shall open on signal if at least 12 hours notice is given.

    DATES:

    This rule is effective June 4, 2010.

    ADDRESSES:

    Comments and related materials received from the public, as well as documents mentioned in this preamble as being available in the docket, are part of docket USCG-2009-0249 and are available online by going to http://www.regulations.gov,, inserting USCG-2009-0249 in the “Keyword” box, and then clicking “Search.” This material is also available for inspection or copying at the Docket Management Start Printed Page 24401Facility (M-30), U.S. Department of Transportation, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue, SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    If you have questions on this proposed rule, call or e-mail Mr. Michael Lieberum, Michael.b.lieberum@uscg.mil, Seventh Coast Guard District, Bridge Branch, 909 S.E. 1st Ave., Miami, FL 33131, telephone number 305-415-6744. If you have questions on viewing the docket, call Renee V. Wright, Program Manager, Docket Operations, telephone 202-366-9826.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Regulatory Information

    On June 4, 2009, we published a notice of proposed rulemaking (NPRM) entitled CSX Railroad, Trout River, mile 0.9, Jacksonville, FL in the Federal Register (74 FR 106). We received no comments on the proposed rule. No public meeting was requested, and none was held.

    Background and Purpose

    The bridge owner, CSX Railroad, has requested that the Coast Guard remove the existing regulations governing the operation of the CSX Railroad Bridge over the Trout River and allow the bridge to operate utilizing an automated system. The request is made because there are only four train transits per day that are short in duration. Under the proposed rule, the bridge would remain in the open position to vessel traffic at all times, closing only to accommodate train traffic.

    The CSX Railroad Bridge is located on the Trout River, mile 0.9, Jacksonville, Florida. The current regulation governing the operation of the CSX Railroad Bridge is published in 33 CFR 117.337 and requires the bridge to open on signal from 6 a.m. until 10 p.m.; and from 10 p.m. until 6 a.m. the draw shall open on signal if at least 12 hours notice is given.

    Regulatory Analyses

    We developed this rule after considering numerous statutes and executive orders related to rulemaking. Below we summarize our analyses based on 13 of these statutes or executive orders.

    Regulatory Planning and Review

    This rule is not a significant regulatory action under section 3(f) of Executive Order 12866, Regulatory Planning and Review, and does not require an assessment of potential costs and benefits under section 6(a)(3) of that Order. The Office of Management and Budget has not reviewed it under that Order. This rule will provide less restrictive vessel traffic flow as the bridge will be in the open position and only lowered when a train approaches the bridge.

    Small Entities

    Under the Regulatory Flexibility Act (5 U.S.C. 601-612), we have considered whether this rule would have a significant economic impact on a substantial number of small entities. The term “small entities” comprises small businesses, not-for-profit organizations that are independently owned and operated and are not dominant in their fields, and governmental jurisdictions with populations of less than 50,000.

    The Coast Guard certifies under 5 U.S.C. 605(b) that this rule will not have a significant economic impact on a substantial number of small entities.

    This rule will have less of an impact on small entities as the bridge will be in the open position and will be closed for short periods of time as trains transit across this bridge.

    Assistance for Small Entities

    Under section 213(a) of the Small Business Regulatory Enforcement Fairness Act of 1996 (Pub. L. 104-121), in the NPRM we offered to assist small entities in understanding the rule so that they could better evaluate its effects on them and participate in the rulemaking process.

    Collection of Information

    This rule calls for no new collection of information under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501-3520).

    Federalism

    A rule has implications for federalism under Executive Order 13132, Federalism, if it has a substantial direct effect on State or local governments and would either preempt State law or impose a substantial direct cost of compliance on them. We have analyzed this rule under that Order and have determined that it does not have implications for federalism.

    Unfunded Mandates Reform Act

    The Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531-1538) requires Federal agencies to assess the effects of their discretionary regulatory actions. In particular, the Act addresses actions that may result in the expenditure by a State, local, or tribal government, in the aggregate, or by the private sector of $100,000,000 or more in any one year. Though this rule will not result in such an expenditure, we do discuss the effects of this rule elsewhere in this preamble.

    Taking of Private Property

    This rule will not affect a taking of private property or otherwise have taking implications under Executive Order 12630, Governmental Actions and Interference with Constitutionally Protected Property Rights.

    Civil Justice Reform

    This rule meets applicable standards in sections 3(a) and 3(b)(2) of Executive Order 12988, Civil Justice Reform, to minimize litigation, eliminate ambiguity, and reduce burden.

    Protection of Children

    We have analyzed this rule under Executive Order 13045, Protection of Children from Environmental Health Risks and Safety Risks. This rule is not an economically significant rule and does not create an environmental risk to health or risk to safety that might disproportionately affect children.

    Indian Tribal Governments

    This rule does not have tribal implications under Executive Order 13175, Consultation and Coordination with Indian Tribal Governments, because it does not have a substantial direct effect on one or more Indian tribes, on the relationship between the Federal Government and Indian tribes, or on the distribution of power and responsibilities between the Federal Government and Indian tribes.

    Energy Effects

    We have analyzed this rule under Executive Order 13211, Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use. We have determined that it is not a “significant energy action” under that order because it is not a “significant regulatory action” under Executive Order 12866 and is not likely to have a significant adverse effect on the supply, distribution, or use of energy. The Administrator of the Office of Information and Regulatory Affairs has not designated it as a significant energy action. Therefore, it does not require a Statement of Energy Effects under Executive Order 13211.

    Technical Standards

    The National Technology Transfer and Advancement Act (NTTAA) (15 U.S.C. 272 note) directs agencies to use voluntary consensus standards in their regulatory activities unless the agency Start Printed Page 24402provides Congress, through the Office of Management and Budget, with an explanation of why using these standards would be inconsistent with applicable law or otherwise impractical. Voluntary consensus standards are technical standards (e.g., specifications of materials, performance, design, or operation; test methods; sampling procedures; and related management systems practices) that are developed or adopted by voluntary consensus standards bodies.

    This rule does not use technical standards. Therefore, we did not consider the use of voluntary consensus standards.

    Environment

    We have analyzed this rule under Department of Homeland Security Management Directive 023-01 and Commandant Instruction M16475.lD, which guides the Coast Guard in complying with the National Environmental Policy Act of 1969 (NEPA) (42 U.S.C. 4321-4370f), and have concluded that this action is one of a category of actions which do not individually or cumulatively have a significant effect on the human environment. This rule is categorically excluded, under figure 2-1, paragraph (32)(e), of the Instruction.

    Under figure 2-1, paragraph (32)(e), of the Instruction, an environmental analysis checklist and a categorical exclusion determination are not required for this rule.

    Start List of Subjects

    List of Subjects in 33 CFR Part 117

    • Bridges
    End List of Subjects Start Amendment Part

    For the reasons discussed in the preamble, the Coast Guard amends 33 CFR part 117 as follows:

    End Amendment Part Start Part

    PART 117—DRAWBRIDGE OPERATION REGULATIONS

    End Part Start Amendment Part

    1. The authority citation for part 117 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 33 U.S.C. 499; 33 CFR 1.05-1; Department of Homeland Security Delegation No. 0170.1.

    End Authority Start Amendment Part

    2. Revise § 117.337 as follows:

    End Amendment Part
    Trout River.

    The draw of the CSX Railroad Bridge across the Trout River, mile 0.9 at Jacksonville, operates as follows:

    (a) The bridge is not tended.

    (b) The draw is normally in the fully open position, displaying green lights to indicate that vessels may pass.

    (c) As a train approaches, provided the scanners do not detect a vessel under the draw, the lights change to flashing red and a horn continuously sounds while the draw closes. The draw remains closed until the train passes.

    (d) After the train clears the bridge, the lights continue to flash red and the horn again continuously sounds while the draw opens, until the draw is fully open and the lights return to green.

    Start Signature

    Dated: April 21, 2010.

    R.S. Branham,

    Rear Admiral, U.S. Coast Guard, Commander, Seventh Coast Guard District.

    End Signature End Supplemental Information

    [FR Doc. 2010-10497 Filed 5-4-10; 8:45 am]

    BILLING CODE 9110-04-P

Document Information

Comments Received:
0 Comments
Effective Date:
6/4/2010
Published:
05/05/2010
Department:
Coast Guard
Entry Type:
Rule
Action:
Final rule.
Document Number:
2010-10497
Dates:
This rule is effective June 4, 2010.
Pages:
24400-24402 (3 pages)
Docket Numbers:
Docket No. USCG-2009-0249
RINs:
1625-AA09: Drawbridge Regulations
RIN Links:
https://www.federalregister.gov/regulations/1625-AA09/drawbridge-regulations
Topics:
Bridges
PDF File:
2010-10497.pdf
CFR: (1)
33 CFR 117.337