99-11350. Williston Basin Interstate Pipeline Company, Notice of Application  

  • [Federal Register Volume 64, Number 87 (Thursday, May 6, 1999)]
    [Notices]
    [Pages 24386-24387]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-11350]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP99-366-000]
    
    
    Williston Basin Interstate Pipeline Company, Notice of 
    Application
    
    April 30, 1999.
        Take notice that on April 28, 1999, Williston Basin Interstate 
    Pipeline Company (Williston Basin), Post Office Box 1560, Bismarck, 
    North Dakota 58506-5601, filed in Docket No. CP99-366-000, an 
    application pursuant to Section 7(b) of the Natural Gas Act (NGA) for 
    permission and approval to abandon a farm tap, which includes the 
    plugging of the tap and the removal of the meter and regulator, in 
    Fallon
    
    [[Page 24387]]
    
    County, Montana, all as more fully set forth in the application on file 
    with the Federal Energy Regulatory Commission (Commission) and open to 
    public inspection. This filing may be viewed on the web at http://
    www.ferc.fed.us/online/rims.htm (call 202-208-2222 for assistance).
        Any person desiring to be heard or to make any protest with 
    reference to said application should on or before May 21, 1999, file 
    with the Federal Energy Regulatory Commission, Washington, D.C. 20426, 
    a motion to intervene or a protest in accordance with the requirements 
    of the Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
    385.211) and the Regulations under the NGA (18 CFR 157.10). All 
    protests filed with the Commission will be considered by it in 
    determining the appropriate action to be taken but will not serve to 
    make the Protestants parties to the proceeding. Any person wishing to 
    become a party to a proceeding or to participate as a party in any 
    hearing therein must file a motion to intervene in accordance with the 
    Commission's Rules.
        Take further notice that, pursuant to the authority contained in 
    and subject to the jurisdiction conferred upon the Federal Energy 
    Regulatory Commission by Sections 7 and 15 of the NGA and the 
    Commission's Rules of Practice and Procedure, a hearing will be held 
    without further notice before the Commission or its designee on this 
    application if no motion to intervene is filed within the time required 
    herein, if the Commission on its own review of the matter finds that a 
    grant of the certificate is required by the public convenience and 
    necessity. If a motion for leave to intervene is timely filed, or if 
    the Commission on its own motion believes that a formal hearing is 
    required, further notice of such hearing will be duly given.
        Under the procedure herein provided for, unless otherwise advised, 
    it will be unnecessary for Williston Basin Interstate Pipeline Company 
    to appear or be represented at the hearing.
    David P. Boergers,
    Secretary.
    [FR Doc. 99-11350 Filed 5-5-99; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
05/06/1999
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
99-11350
Pages:
24386-24387 (2 pages)
Docket Numbers:
Docket No. CP99-366-000
PDF File:
99-11350.pdf