97-11804. Kern River Gas Transmission Company; Notice of Proposed Changes in FERC Gas Tariff  

  • [Federal Register Volume 62, Number 88 (Wednesday, May 7, 1997)]
    [Notices]
    [Pages 24902-24903]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-11804]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. RP97-342-000]
    
    
    Kern River Gas Transmission Company; Notice of Proposed Changes 
    in FERC Gas Tariff
    
    May 1, 1997.
        Take notice that on April 28, 1997, Kern River Gas Transmission 
    (Kern River) tendered for filing as part of its FERC Gas Tariff, First 
    Revised Volume No. 1, the tariff sheets listed on Appendix A to the 
    filing, with a proposed effective date of May 29, 1997.
        Kern River states that the purpose of this filing is to propose 
    tariff changes that are needed as a result of Kern River's filing to 
    adopt the standardized business practices which were issued by the Gas 
    Industry Standards Board (GISB) and approved by the Commission. 
    Specifically, Kern River is proposing tariff revisions to: 1) Require 
    non-electronically submitted nominations to be submitted earlier than 
    electronically submitted nominations; 2) establish a time line for 
    intra-day nominations; and 3) formalize Kern River's existing pooling 
    policy as required by the Commission's March 6, 1997 Order (78 FERC 
    para. 61,251 (1997).) which directs Kern River to ``file a pooling 
    proposal under NGA Section 4 to comply with the GISB standards, and 
    include in its tariff the GISB provisions related to pooling''.
        Any person desiring to be heard or protest this filing should file 
    a motion to intervene or protest with the Federal Energy Regulatory 
    Commission, 888 First Street, N.E., Washington, DC 20426, in accordance 
    with Sections 385.211 of the Commission's Rules and Regulations. All 
    such motions or protests must be filed as provided in Section 154.210 
    of the Commission's Regulations. Protests will be considered by the 
    Commission in determining the appropriate action to be taken, but will 
    not serve to make protestants parties to the proceeding. Any person 
    wishing to become a party must file a motion to intervene. Copies of 
    this filing are on
    
    [[Page 24903]]
    
    file with the Commission and are available for public inspection in the 
    Public Reference Room.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 97-11804 Filed 5-6-97; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
05/07/1997
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
97-11804
Pages:
24902-24903 (2 pages)
Docket Numbers:
Docket No. RP97-342-000
PDF File:
97-11804.pdf