98-12173. Agency Information Collection Activities: Submission for OMB Review; Comment Request  

  • [Federal Register Volume 63, Number 88 (Thursday, May 7, 1998)]
    [Notices]
    [Pages 25238-25239]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-12173]
    
    
    -----------------------------------------------------------------------
    
    NUCLEAR REGULATORY COMMISSION
    
    
    Agency Information Collection Activities: Submission for OMB 
    Review; Comment Request
    
    AGENCY: U. S. Nuclear Regulatory Commission (NRC).
    
    ACTION: Notice of the OMB review of information collection and 
    solicitation of public comment.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The NRC has recently submitted to OMB for review the following 
    proposal for the collection of information under the provisions of the 
    Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). The NRC hereby 
    informs potential respondents that an agency may not conduct or 
    sponsor, and that a person is not required to respond to, a collection 
    of information unless it displays a currently valid OMB control number.
        1. Type of submission: Revision.
        2. The title of the information collection: ``An Approach for Using 
    Probabilistic Risk Assessment in Risk-informed Decisions on Plant-
    Specific Changes to the Current Licensing Basis,'' Regulatory Guides 
    RG-1.174 through RG-1.178.
        3. The form number if applicable: Not applicable.
        4. How often the collection is required: Use of the new risk-
    informed methodology for making changes in the licensing basis of 
    operating plants in the areas of inservice inspection (ISI), inservice 
    testing (IST), graded quality assurance (GQA), and technical 
    specifications (TS), is available to all licensees but is not required. 
    Licensees may make voluntary submittals when, and if, in their 
    judgment, it is to their advantage to do so (for example, to improve 
    plant safety, reduce costs, gain operating flexibility).
        5. Who will be required or asked to report: Licensees of nuclear 
    power plants may report when, and if, in their judgment, it is to their 
    advantage to do so.
        6. An estimate of the number of responses: ISI: 6, IST: 3, QA: 1, 
    TS: 20.
        7. The estimated number of annual respondents: ISI: 6, IST: 3, QA: 
    1, TS: 20.
        8. An estimate of the total number of hours needed annually to 
    complete the requirement or request (per respondent): ISI: 6,200, IST: 
    5,200, QA: 4,000, TS: 1,060.
        9. An indication of whether Section 3507(d), Pub. L. 104-13 
    applies: Not applicable.
        10. Abstract: In the specific areas of ISI, IST, GQA, and TS, a new 
    series of Regulatory Guides provides a risk-informed method for 
    licensees to use in requesting changes to their current licensing bases 
    (CLB). No changes or additions have been made to any rules or 
    regulations in conjunction with the issuance of this series of guides. 
    The new method will be a voluntary alternative to the 
    deterministically-based CLB change method previously used (which will 
    remain acceptable as an alternative to the new risk-informed method).
        The new risk-informed alternative method will allow licensees to 
    concentrate on plant equipment and operations that are most critically 
    important to plant safety so as to achieve a savings in total effort 
    and greater operating flexibility with an insignificant change in 
    overall safety. The guides specify the records, analyses, and documents 
    that licensees
    
    [[Page 25239]]
    
    are expected to prepare in support of risk-informed changes to their 
    CLB in the specified areas.
        A copy of the final supporting statement may be viewed free of 
    charge at the NRC Public Document Room, 2120 L Street, NW (lower 
    level), Washington, DC. OMB clearance requests are available at the NRC 
    worldwide web site (http://www.nrc.gov) under the FedWorld collection 
    link on the home page tool bar. The document will be available on the 
    NRC home page site for 60 days after the signature date of this notice.
        Comments and questions should be directed to the OMB reviewer by 
    June 8, 1998: Erik Godwin, Office of Information and Regulatory Affairs 
    (3150-0011), NEOB-10202, Office of Management and Budget, Washington, 
    DC 20503.
        Comments can also be submitted by telephone at (202) 395-3084.
        The NRC Clearance Officer is Brenda Jo. Shelton, 301-415-7233.
    
        Dated at Rockville, Maryland, this 1st day of May 1998.
    
        For the Nuclear Regulatory Commission.
    Brenda Jo. Shelton,
    NRC Clearance Officer, Office of the Chief Information Officer.
    [FR Doc. 98-12173 Filed 5-6-98; 8:45 am]
    BILLING CODE 7590-01-P
    
    
    

Document Information

Published:
05/07/1998
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Action:
Notice of the OMB review of information collection and solicitation of public comment.
Document Number:
98-12173
Pages:
25238-25239 (2 pages)
PDF File:
98-12173.pdf