2019-09292. Columbia Gulf Transmission, LLC; Notice of Application  

  • Start Preamble

    Take notice that on April 18, 2019, Columbia Gulf Transmission, LLC (Columbia Gulf), 700 Louisiana Street, Suite 700, Houston, Texas 77002, filed in the above referenced docket an application pursuant to section 7(c) and section 7(b) of the Natural Gas Act (NGA), and Part 157 of the Commission's regulations requesting abandoning authority, authorizing the replacement of: (i) Approximately 1,350 feet (ft.) of existing 30-inch-diameter pipeline of Mainline 100; (ii) approximately 1,300 ft. of existing 30-inch-diameter pipeline of Mainline 200, referred to as the Mainline 100 and Mainline 200 Replacement Project. All as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's website web at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or TYY, (202) 502-8659.

    Any questions concerning this application may be directed to Dave Hammel, U.S. Legal, Columbia Gulf Transmission, LLC, 700 Louisiana St, Houston, TX 77002-2700, by telephone at (832) 320-5861.

    Columbia Gulf requests pre-determination of rolled-in treatment of rates and surcharges in accordance with the Commission's Policy Statement in Docket No. PL99-3-000. The estimated cost of the project will be $18,919,720.

    Pursuant to section 157.9 of the Commission's rules (18 CFR 157.9), within 90 days of this Notice, the Commission staff will either: complete its environmental assessment (EA) and place it into the Commission's public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff's issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission's public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff's FEIS or EA.

    There are two ways to become involved in the Commission's review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission's Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit seven copies of filings made in the proceeding with the Commission and must mail a copy to the applicant and to every other party. Only parties to the proceeding can ask for court review of Commission orders in the proceeding.

    However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission's rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest.

    Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission's environmental mailing list, and will be notified of any meetings associated with the Commission's environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Start Printed Page 19912Commission and will not have the right to seek court review of the Commission's final order.

    The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the “eFiling” link at http://www.ferc.gov. Persons unable to file electronically should submit an original and 7 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street NE, Washington, DC 20426.

    Comment Date: May 22, 2019.

    Start Signature

    Dated: May 1, 2019.

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. 2019-09292 Filed 5-6-19; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
05/07/2019
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2019-09292
Dates:
May 22, 2019.
Pages:
19911-19912 (2 pages)
Docket Numbers:
Docket No. CP19-193-000
PDF File:
2019-09292.Pdf