01-11714. Drawbridge Operation Regulation; Massalina Bayou, Florida  

  • Start Preamble

    AGENCY:

    Coast Guard, DOT.

    ACTION:

    Notice of proposed rulemaking.

    SUMMARY:

    The Coast Guard is proposing a change to the regulation governing the operation of the Tarpon Dock bascule span drawbridge across Massalina Bayou, mile 0.0, at Panama City, Bay County, Florida. The proposed rule would allow the draw of the bridge to remain closed to navigation from 9 p.m. until 11 p.m. on July 4 of each year. This rule will facilitate movement of vehicular traffic associated with a fireworks display which is conducted annually on July 4. Presently the draw opens on signal at all times.

    DATES:

    Comments and related material must reach the Coast Guard on or before May 22, 2001.

    ADDRESSES:

    You may mail comments to Commander (ob), Eighth Coast Guard District, 501 Magazine Street, New Orleans, Louisiana 70130-3396, or deliver them to room 1313 at the same address between 7 a.m. and 3 p.m., Monday through Friday, except Federal holidays. The Commander, Eighth Coast Guard District, Bridge Administration Branch maintains the public docket for this rulemaking. Comments and material received from the public, as well as documents indicated in this preamble as being available in the docket, will become part of this docket and will be available for inspection or copying at the Bridge Administration Branch, Eighth Coast Guard District between 7 a.m. and 3 p.m., Monday through Friday, except Federal holidays.

    Start Further Info Start Printed Page 23641

    FOR FURTHER INFORMATION CONTACT:

    Phil Johnson, Bridge Administration Branch, 504-589-2965.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Request for Comments

    We encourage you to participate in this rulemaking by submitting comments and related material. If you do so, please include your name and address, identify the docket number for this rulemaking (CGD08-01-009), indicate the specific section of this document to which each comment applies, and give the reason for each comment. Please submit all comments and related material in an unbound format, no larger than 81/2 by 11 inches, suitable for copying. If you would like to know they reached us, please enclose a stamped, self-addressed postcard or envelope. We will consider all comments and material received during the comment period. We may change this proposed rule in view of them.

    Public Meeting

    We do not now plan to hold a public meeting. But you may submit a request for a meeting by writing to the Commander, Eighth Coast Guard District, Bridge Administration Branch at the address under ADDRESSES explaining why one would be beneficial. If we determine that one would aid this rulemaking, we will hold one at a time and place announced by a later notice in the Federal Register.

    Background and Purpose

    The City of Panama City, Florida requested a change in the drawbridge operating regulation, governing the operation of the Tarpon Dock bascule span drawbridge. The rule is needed to accommodate the additional volume of vehicular traffic that the fireworks display normally generates. This bridge closure has become an annual event in conjunction with the 4th of July fireworks celebration. The closure is for two hours and does not significantly affect marine traffic. The Tarpon Dock bascule span drawbridge across Massalina Bayou has a vertical clearance of 7 feet above mean high water in the closed-to-navigation position and unlimited in the open-to-navigation position. Navigation on the waterway consists primarily of commercial fishing vessels, sailing vessels and other recreational craft.

    Discussion of Proposed Rule

    This proposed rule would allow the bridge to remain closed to navigation from 9 p.m. until 11 p.m. on July 4 of each year. The closure of the bridge would affect vessel traffic for a two-hour period on one evening per year. This closure is necessary to accommodate an increase in volume of vehicular traffic, crossing the bridge resulting from the annual fireworks display, an event of public interest. The rule would allow the bridge to open during this period for a vessel in distress.

    Regulatory Evaluation

    This proposed rule is not a “significant regulatory action” under section 3(f) of Executive Order 12866 and does not require an assessment of potential costs and benefits under section 6(a)(3) of that Order. The Office of Management and Budget has not reviewed it under that Order. It is not significant under the regulatory policies and procedures of the Department of Transportation (DOT)(44 FR 11040, February 26, 1979).

    We expect the economic impact of this proposed rule to be so minimal that a full Regulatory Evaluation under paragraph 10e of the regulatory policies and procedures of DOT is unnecessary.

    Small Entities

    Under the Regulatory Flexibility Act (5 U.S.C. 601-612), we considered whether this proposed rule would have a significant economic impact on a substantial number of small entities. The term “small entities” comprises small businesses, not-for-profit organizations that are independently owned and operated and are not dominant in their fields, and governmental jurisdictions with populations of less than 50,000.

    The Coast Guard certifies under 5 U.S.C. 605(b) that this proposed rule would not have a significant economic impact on a substantial number of small entities. The small entities concerned with this proposed rule are the local commercial fishermen who transit the bridge. This proposed rule will only delay transiting the bridge for two hours on one evening per year.

    If you think that your business, organization, or governmental jurisdiction qualifies as a small entity and that this rule would have a significant economic impact on it, please submit a comment (see ADDRESSES) explaining why you think it qualifies and how and to what degree this rule would economically affect it.

    Assistance for Small Entities

    Under section 213(a) of the Small Business Regulatory Enforcement Fairness Act of 1996 (Pub. L. 104-121), we want to assist small entities in understanding this proposed rule so that they can better evaluate its effects on them and participate in the rulemaking. If the rule would affect your small business, organization, or governmental jurisdiction and you have questions concerning its provisions or options for compliance, please contact the Bridge Administration Branch, Eighth Coast Guard District at the address above.

    Collection of Information

    This proposed rule would call for no new collection of information under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501-3520.).

    Federalism

    We have analyzed this proposed rule under E.O. 13132 and have determined that this rule does not have implications for federalism under that Order.

    Unfunded Mandates Reform Act

    The Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531-1538) governs the issuance of Federal regulations that require unfunded mandates. An unfunded mandate is a regulation that requires a State, local, or tribal government or the private sector to incur direct costs without the Federal Government's having first provided the funds to pay those costs. This proposed rule would not impose an unfunded mandate.

    Taking of Private Property

    This proposed rule would not effect a taking of private property or otherwise have taking implications under Executive Order 12630, Governmental Actions and Interference with Constitutionally Protected Property Rights.

    Civil Justice Reform

    This proposed rule meets applicable standards in sections 3(a) and 3(b)(2) of Executive Order 12988, Civil Justice Reform, to minimize litigation, eliminate ambiguity, and reduce burden.

    Protection of Children

    We have analyzed this proposed rule under Eexecutive Order 13045, Protection of Children from Environmental Health Risks and Safety Risks. This rule is not an economically significant rule and does not concern an environmental risk to health or risk to safety that may disproportionately affect children.

    Environment

    We considered the environmental impact of this proposed rule and concluded that, under figure 2-1, paragraph (32)(e), of Commandant Instruction M16475.lC, this proposed rule is categorically excluded from Start Printed Page 23642further environmental documentation. This proposal will change an existing special drawbridge operating regulation promulgated by a Coast Guard Bridge Administration Program action. A “Categorical Exclusion Determination” is available in the docket where indicated under ADDRESSES.

    Start List of Subjects

    List of Subjects in 33 CFR Part 117

    • Bridges
    End List of Subjects

    For the reasons set out in the preamble, the Coast Guard proposes to amend Part 117 of Title 33, Code of Federal Regulations, as follows:

    Start Part

    PART 117—DRAWBRIDGE OPERATION REGULATIONS

    1. The authority citation for Part 117 continues to read as follows:

    Start Authority

    Authority: 33 U.S.C. 499; 49 CFR 1.46; 33 CFR 1.05-1(g); section 117.255 also issued under the authority of Pub. L. 102-587, 106 Stat. 5039.

    End Authority

    2. Section 117.301 is added to read as follows:

    Massalina Bayou.

    The draw of the Tarpon Dock bascule span bridge, Massalina Bayou, mile 0.0 at Panama City, shall open on signal; except that from 9 p.m. until 11 p.m. on July 4, each year, the draw need not open for the passage of vessels. The draw will open at any time for a vessel in distress.

    Start Signature

    Dated: April 13, 2001.

    Paul J. Pluta,

    Rear Admiral, U.S. Coast Guard, Commander, Eighth Coast Guard District.

    End Signature End Part End Supplemental Information

    [FR Doc. 01-11714 Filed 5-8-01; 8:45 am]

    BILLING CODE 4910-15-P

Document Information

Published:
05/09/2001
Department:
Coast Guard
Entry Type:
Proposed Rule
Action:
Notice of proposed rulemaking.
Document Number:
01-11714
Dates:
Comments and related material must reach the Coast Guard on or before May 22, 2001.
Pages:
23640-23642 (3 pages)
Docket Numbers:
CGD08-01-009
RINs:
2115-AE47: Drawbridge Regulations
RIN Links:
https://www.federalregister.gov/regulations/2115-AE47/drawbridge-regulations
Topics:
Bridges
PDF File:
01-11714.pdf
CFR: (1)
33 CFR 117.301