Home »
1995 Issues »
60 FR (06/01/1995) » 95-13309. Sonat Intrastate-Alabama Inc.; Notice of Petition for Rate Approval Pursuant to Section 284.123(b)(2) of the Commission's Regulations
95-13309. Sonat Intrastate-Alabama Inc.; Notice of Petition for Rate Approval Pursuant to Section 284.123(b)(2) of the Commission's Regulations
[Federal Register Volume 60, Number 105 (Thursday, June 1, 1995)]
[Notices]
[Page 28601]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-13309]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. PR95-12-000]
Sonat Intrastate-Alabama Inc.; Notice of Petition for Rate
Approval Pursuant to Section 284.123(b)(2) of the Commission's
Regulations
May 25, 1995.
Take notice that on May 22, 1995, Sonat Intrastate-Alabama Inc.
(SIA) filed in the captioned docket a petition pursuant to Section
284.123(b)(2) of the Federal Energy Regulatory Commission's
(Commission) Regulations under the Natural Gas Policy Act of 1978
(NGPA) for approval of a maximum systemwide rate for transporting
natural gas pursuant to Section 311 of the NGPA, all as more fully set
forth in the petition which is on file with the Commission and open to
public inspection.
SIA files this petition pursuant to the Commission's Letter Order
issued in Docket No. PR92-16-000 on May 6, 1994, requiring SIA to file
a Sec. 284.123(b)(2) application on or before May 20, 1995, to justify
SIA's existing systemwide transportation rate or a changed systemwide
rate. SIA proposes to retain its existing maximum systemwide
transportation rate of 29.4 cents per MMBtu for Section 311
transportation services. SIA requests the Commission to determine that
the rate proposed herein is a fair and equitable rate for performing
Section 311 transportation services.
Any person desiring to be heard or to make a protest with reference
to said application should file with the Federal Energy Regulatory
Commission, 825 North Capitol Street, N.E. Washington, D.C. 20426, a
petition to intervene or a protest in accordance with the requirements
of the Commission's Rules of Practice and Procedure (18 CFR 385.211 or
385.214). All such motions or protests should be filed on or before
June 9, 1995. All protests filed with the Commission will be considered
by it in determining the appropriate action to be taken but will not
serve to make the protestants parties to a proceeding. Any person
wishing to become a party to a proceeding or to participate as a party
in any hearing therein must file a petition to intervene in accordance
with the Commission's Rules.
Lois D. Cashell,
Secretary.
[FR Doc. 95-13309 Filed 5-31-95; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 06/01/1995
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 95-13309
- Pages:
- 28601-28601 (1 pages)
- Docket Numbers:
- Docket No. PR95-12-000
- PDF File:
-
95-13309.pdf