98-14383. American Ref-Fuel Company of Essex County, et al. Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 63, Number 104 (Monday, June 1, 1998)]
    [Notices]
    [Pages 29726-29730]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-14383]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. EG98-75-000, et al.]
    
    
    American Ref-Fuel Company of Essex County, et al. Electric Rate 
    and Corporate Regulation Filings
    
    May 26, 1998.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. American Ref-Fuel Company of Essex County
    
    [Docket No. EG98-75-000]
    
        Take notice that on May 14, 1998, American Ref-Fuel Company of 
    Essex County (ARC), a New Jersey general partnership, with its 
    principal place of business at c/o American Ref-Fuel Company, 15990 
    Barker's Landing, Suite 200, Houston, Texas 77079, filed with the 
    Federal Energy Regulatory Commission an application for determination 
    of exempt wholesale generator status pursuant to Part 365 of the 
    Commission's Regulations.
        ARC is engaged directly and exclusively in the business of owning 
    or operating, or both owning and operating, a municipal solid waste-
    fired small power production facility with a maximum net power 
    production capacity of approximately 69.6 MW which is an eligible 
    facility and selling electric energy solely at wholesale. All of the 
    facility's electric power net of the facility's operating electric 
    power is and will be purchased at wholesale by Public Service Electric 
    and Gas Company.
        Comment date: June 12, 1998, in accordance with Standard Paragraph 
    E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application.
    
    2. American Ref-Fuel Company of Hempstead
    
    [Docket No. EG98-76-000]
    
        Take notice that on May 14, 1998, American Ref-Fuel Company of 
    Hempstead (ARC), a New York general partnership, with its principal 
    place of business at c/o American Ref-Fuel Company, 15990 Barker's 
    Landing, Suite 200, Houston, Texas 77079, filed with the Federal Energy 
    Regulatory Commission an application for determination of exempt 
    wholesale generator status pursuant to Part 365 of the Commission's 
    Regulations.
        ARC is engaged directly and exclusively in the business of owning 
    or operating, or both owning and operating, a municipal solid waste-
    fired small power production facility with a maximum net power 
    production capacity of approximately 72.6 MW which is an eligible 
    facility and selling electric energy solely at wholesale. All of the 
    facility's electric power net of the facility's operating electric 
    power is and will be purchased at wholesale by Long Island Lighting 
    Company.
        Comment date: June 12, 1998, in accordance with Standard Paragraph 
    E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application.
    
    3. SEMASS Partnership
    
    [Docket No. EG98-77-000]
    
        Take notice that on May 14, 1998, SEMASS Partnership (SEMASS), a 
    Massachusetts limited partnership, with its principal place of business 
    at c/o American Ref-Fuel Company, 15990 Barker's Landing, Suite 200, 
    Houston, Texas 77079, filed with the Federal Energy Regulatory 
    Commission an application for determination of exempt wholesale 
    generator status pursuant to Part 365 of the Commission's Regulations.
        SEMASS is engaged directly and exclusively in the business of 
    owning or
    
    [[Page 29727]]
    
    operating, or both owning and operating, a municipal solid waste-fired 
    small power production facility with a maximum net power production 
    capacity of 80 MW which is an eligible facility and selling electric 
    energy solely at wholesale. All of the facility's electric power net of 
    the facility's operating electric power is and will be purchased at 
    wholesale by Commonwealth Electric Company.
        Comment date: June 12, 1998, in accordance with Standard Paragraph 
    E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application.
    
    4. Turlock Irrigation District v. Pacific Gas and Electric Co.
    
    [Docket No. EL98-48-000]
    
        Take notice that on May 14, 1998, Turlock Irrigation District 
    tendered for filing against Pacific Gas and Electric Company a 
    complaint and request for investigation and reduction of obligation 
    service and contract firm service rates.
        Comment date: June 25, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    5. Florida Power Corporation
    
    [Docket Nos. ER95-457-005 and ER95-469-003]
    
        Take notice that on May 5, 1998, Florida Power Corporation tendered 
    for filing a refund report for calender year 1997 related to the 
    recovery of Qualifying Facility Energy Payments from Florida Power 
    Corporation's wholesale full and partial requirements customers in 
    accordance with the Settlement Agreements approved in Docket Nos. ER95-
    465-000 and ER95-469-000.
        Comment date: June 8, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    6. Commonwealth Edison Company
    
    [Docket No. ER98-1900-000]
    
        Take notice that on May 20, 1998, Commonwealth Edison Company 
    (ComEd), submitted for filing a revised service agreement between ComEd 
    and Commonwealth Edison Company in its wholesale merchant function 
    (ComEd WMD).
        ComEd continues to seek an effective date of March 1, 1998.
        Copies of the amended filing were served on ComEd WMD and the 
    Illinois Commerce Commission.
        Comment date: June 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    7. LG&E Energy Marketing Inc.
    
    [Docket No. ER98-1981-001]
    
        Take notice that on May 20, 1998, LG&E Energy Marketing Inc. (LEM), 
    submitted a filing in compliance with LG&E Energy Marketing Inc., 83 
    FERC para. 61,130 (1998). As directed by the Order, LEM submitted a 
    revised Code of Conduct governing LEM's relationship with Louisville 
    Gas and Electric Company and Kentucky Utilities Company.
        Comment date: June 5, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    8. Washington Water Power
    
    [Docket No. ER98-2721-000]
    
        Take notice that on May 21, 1998, Washington Water Power, tendered 
    with the Federal Energy Regulatory Commission, pursuant to 18 CFR 
    Section 35.13, an amended filing of unexecuted Certificates of 
    Concurrence with California Independent System Operator and The 
    California Power Exchange that were not included with the previous 
    unexecuted Service Agreements filed under Docket No. ER98-2721-000.
        Comment date: June 10, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    9. Arizona Public Service Company
    
    [Docket No. ER98-2727-000]
    
        Take notice that on April 28, 1998, Arizona Public Service Company 
    (APS), tendered for filing a transaction report for the first quarter 
    of 1998 under APS's FERC Electric Tariff, Original Volume No. 3.
        A copy of this filing has been served on the Arizona Corporation 
    Commission.
        Comment date: June 5, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    10. Florida Power Corporation
    
    [Docket No. ER98-2758-000]
    
        Take notice that on May 20, 1998, Florida Power Corporation (FPC), 
    tendered for filing an amendment to the revisions to the capacity 
    charges, reservation fees and energy adders for various interchange 
    services initially filed by FPC on April 30, 1998 in the above-
    captioned docket.
        Comment date: June 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    11. Consolidated Edison Company of New York, Inc.
    
    [Docket No. ER98-2809-000]
    
        Take notice that on April 29, 1998, Consolidated Edison Company of 
    New York, Inc., tendered for filing a summary of the electric 
    exchanges, electric capacity, and electric other energy trading 
    activities under its FERC Electric Tariff Rate Schedule No. 2 for the 
    quarter ending March 31, 1998.
        Comment date: June 8, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    12. Southwestern Public Service Inc.
    
    [Docket No. ER98-2845-000]
    
        Take notice that on April 30, 1998, New Century Services Inc., on 
    behalf of Southwestern Public Service Company (Southwestern), submitted 
    a Quarterly Report under Southwestern's market-based sales tariff. The 
    report is for the period of January 1, 1998 through March 31, 1998.
        Comment date: June 8, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    13. Old Dominion Electric Cooperative
    
    [Docket No. ER97-4314-003]
    
        Take notice that on May 1, 1998, Old Dominion Electric Cooperative 
    tendered for filing its report of transactions for the first quarter 
    ending March 31, 1998.
        Comment date: June 8, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    14. Detroit Edison Company
    
    [Docket No. ER98-2868-000]
    
        Take notice that on May 1, 1998, the Detroit Edison Company 
    tendered for filing its report of transactions for the first quarter of 
    1998.
        Comment date: June 8, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    15. State Line Energy, L.L.C.
    
    [Docket No. ER98-2876-000]
    
        Take notice that on April 30, 1998, State Line Energy, L.L.C., 
    tendered for filing a summary of transaction activity for the quarter 
    ended March 31, 1998.
        Comment date: June 8, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    16. Western Resources Inc.
    
    [Docket No. ER98-2877-000]
    
        Take notice that on May 1, 1998, Western Resources Inc., tendered 
    for filing a summary of activity for the quarter ending March 31, 1998.
        Comment date: June 8, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    17. Atlantic City Electric Company
    
    [Docket No. ER98-2941-000]
    
        Take notice that on May 5, 1998, Atlantic City Electric Company 
    (AE),
    
    [[Page 29728]]
    
    tendered for filing its 1st quarter 1998 Summary Report of all AE 
    transactions made pursuant to the market-based rate power service 
    tariff, made effective by the Commission on April 29, 1996 in Docket 
    No. ER96-1361-000.
        Comment date: June 5, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    18. Carolina Power & Light Company
    
    [Docket No. ER98-2942-000]
    
        Take notice that on May 6, 1998, Carolina Power & Light Company 
    tendered for filing its Summary of Transactions during the first 
    quarter of 1998.
        Comment date: June 8, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    19. Central Illinois Light Company
    
    [Docket No. ER98-3057-000]
    
        Take notice that on May 20, 1998, Central Illinois Light Company 
    (CILCO), 300 Liberty Street, Peoria, Illinois 61202, tendered for 
    filing with the Commission a substitute Index of Customers under its 
    Coordination Sales Tariff and one service agreement for one new 
    customer, Entergy Power Marketing Corp. (EPMC).
        CILCO requested an effective date of April 22, 1998.
        Copies of the filing were served on the affected customer and the 
    Illinois Commerce Commission.
        Comment date: June 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    20. Enron Power Marketing, Inc.
    
    [Docket No. ER98-3058-000]
    
        Take notice that on May 20, 1998, Enron Power Marketing, Inc. 
    (EPMI), filed an amendment to its Long-Term Power Sale Agreement with 
    the Western Area Power Administration (Western Agreement). On December 
    23, 1997, the Commission authorized the transfer of the Western 
    Agreement from Portland General Electric Company to EPMI (81 FERC para. 
    61,374 (1997)). The proposed amendment would implement a rate decrease 
    and modify certain non-rate terms and conditions of the Western 
    Agreement.
        EPMI requests that the amendment become effective on the last to 
    occur of: (1) the first day of the month following the month in which 
    the Western Area Power Administration's commitment for certain 
    installment payments under the amendment has been satisfied or (2) 
    January 1, 1999.
        Comment date: June 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    21. Jersey Central Power & Light Company, Metropolitan Edison 
    Company, and Pennsylvania Electric Company
    
    [Docket No. ER98-3059-000]
    
        Take notice that on May 20, 1998, Jersey Central Power & Light 
    Company, Metropolitan Edison Company and Pennsylvania Electric Company 
    (each doing business and hereinafter collectively referred to as GPU 
    Energy), filed amendments to the GPU Power Pooling Agreement.
        GPU Energy has served copies of the filing on regulatory agencies 
    in New Jersey and Pennsylvania.
        Comment date: June 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    22. The Dayton Power and Light Company
    
    [Docket No. ER98-3060-000]
    
        Take notice that on May 20, 1998, The Dayton Power and Light 
    Company (Dayton), submitted service agreements establishing PP&L, Inc., 
    as customers under the terms of Dayton's Open Access Transmission 
    Tariff.
        Dayton requests an effective date of one day subsequent to this 
    filing for the service agreements. Accordingly, Dayton requests waiver 
    of the Commission's notice requirements.
        Copies of the this filing were served upon PP&L, Inc., and the 
    Public Utilities Commission of Ohio.
        Comment date: June 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    23. Commonwealth Edison Company
    
    [Docket No. ER98-3066-000]
    
        Take notice that on May 20, 1998, Commonwealth Edison Company 
    (ComEd), submitted for filing an unexecuted Service Agreement, 
    establishing the City of Dowagiac, Michigan (Dowagiac) as a customer 
    under the terms of ComEd's Power Sales and Reassignment of Transmission 
    Rights Tariff PSRT-1 (the PSRT-1 Tariff). The Commission has previously 
    designated the PSRT-1 Tariff as FERC Electric Tariff, First Revised 
    Volume No. 2.
        ComEd requests an effective date of March 1, 1998, and, 
    accordingly, seeks waiver of the Commission's notice requirements.
        Copies of this filing were served on Dowagiac and the Illinois 
    Commerce Commission.
        Comment date: June 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    24. Northern States Power Company (Minnesota) and Northern States 
    Power Company (Wisconsin)
    
    [Docket No. ER98-3067-000]
    
        Take notice that on May 20, 1998, Northern States Power Company 
    (Minnesota) and Northern States Power Company (Wisconsin) (jointly 
    NSP), tendered for filing a Non-Firm Point-to-Point Transmission 
    Service Agreement and a Short-Term Firm Transmission Service Agreement 
    between NSP and Northern/AES Energy, L.L.C.
        NSP requests that the Commission accept both the agreements 
    effective April 28, 1998, and requests waiver of the Commission's 
    notice requirements in order for the agreements to be accepted for 
    filing on the date requested.
        Comment date: June 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    25. Wisconsin Public Service Corporation
    
    [Docket No. ER98-3068-000]
    
        Take notice that on May 21, 1998, Wisconsin Public Service 
    Corporation tendered for filing an executed service agreement with 
    Upper Peninsula Power Co., under its Market-Based Rate Tariff.
        Comment date: June 10, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    26. Wisconsin Public Service Corporation
    
    [Docket No. ER98-3069-000]
    
        Take notice that on May 21, 1998, Wisconsin Public Service 
    Corporation tendered for filing an executed service agreement with 
    Cargill--Alliant, LLC under its Market-Based Rate Tariff.
        Comment date: June 10, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    27. Northern States Power Company and (Minnesota) Northern States 
    Power Company (Wisconsin)
    
    [Docket No. ER98-3070-000]
    
        Take notice that on May 21, 1998, Northern States Power Company 
    (Minnesota) and Northern States Power Company (Wisconsin) (jointly 
    NSP), tendered for filing a Non-Firm Point-to-Point Transmission 
    Service Agreement and a Short-Term Firm Transmission Service Agreement 
    between NSP and Granite Falls Municipal Light & Power.
        NSP requests that the Commission accept both the agreements 
    effective April 29, 1998, and requests waiver of the Commission's 
    notice requirements in order for the agreements to be accepted for 
    filing on the date requested.
    
    [[Page 29729]]
    
        Comment date: June 10, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    28. Northern States Power Company (Minnesota) and Northern States 
    Power Company (Wisconsin)
    
    [Docket No. ER98-3071-000]
    
        Take notice that on May 21, 1998, Northern States Power Company 
    (Minnesota) and Northern States Power Company (Wisconsin) (jointly 
    NSP), tendered for filing a Short-Term Firm Transmission Service 
    Agreement between NSP and Blue Earth Light & Water Department.
        NSP requests that the Commission accept the agreement effective 
    April 21, 1998, and requests waiver of the Commission's notice 
    requirements in order for the agreement to be accepted for filing on 
    the date requested.
        Comment date: June 10, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    29. Orange and Rockland Utilities, Inc.
    
    [Docket No. ER98-3072-000]
    
        Take notice that on May 21, 1998, Orange and Rockland Utilities, 
    Inc. (Orange and Rockland), filed a Service Agreement between Orange 
    and Rockland and SCANA Energy Marketing, Inc., (Customer). This Service 
    Agreement specifies that the Customer has agreed to the rates, terms 
    and conditions of Orange and Rockland Open Access Transmission Tariff 
    filed on July 9, 1996 in Docket No. OA96-210-000.
        Orange and Rockland requests waiver of the Commission's sixty-day 
    notice requirements and an effective date of April 22, 1998, for the 
    Service Agreement.
        Orange and Rockland has served copies of the filing on The New York 
    State Public Service Commission and on the Customer.
        Comment date: June 10, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    30. West Texas Utilities Company
    
    [Docket No. ER98-3073-000]
    
        Take notice that on May 21, 1998, West Texas Utilities Company 
    (WTU), submitted for filing an executed Remote Control Area Load 
    Agreement (the RCAL Agreement), dated December 19, 1997, between WTU, 
    Texas Utilities Electric Company (TU) and Rayburn Country Electric 
    Cooperative, Inc. (Rayburn), and Amendment Nos. 1 and 2 to the RCAL 
    Agreement. The RCAL Agreement will permit WTU to provide control area 
    services to Rayburn.
        WTU seeks an effective date of May 22, 1998, and accordingly, seeks 
    waiver of the Commission's notice requirements.
        WTU served copies of the filing on TU, Rayburn and the Public 
    Utility Commission of Texas. A copy of the filing is also available for 
    inspection at WTU's offices in Abilene, Texas.
        Comment date: June 10, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    31. Entergy Services, Inc.
    
    [Docket No. ER98-3074-000]
    
        Take notice that on May 21, 1998, Entergy Services, Inc. (Entergy 
    Services), on behalf of Entergy Mississippi, Inc. (Entergy 
    Mississippi), tendered for filing an Interconnection and Operating 
    Agreement between Entergy Mississippi and LSP Energy Limited 
    Partnership.
        Comment date: June 10, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    32. Entergy Services, Inc.
    
    [Docket No. ER98-3075-000]
    
        Take notice that on May 21, 1998, Entergy Services, Inc. (Entergy 
    Services), on behalf of Entergy Arkansas, Inc. (Entergy Arkansas), 
    submitted for filing the Fourth Amendment to the Power Agreement (PPA) 
    between Entergy Arkansas, Inc., and the City of North Little Rock, 
    Arkansas, dated May 1, 1998. Entergy Services states that the amendment 
    establishes the in-service date for a new point of delivery under the 
    PPA.
        Comment date: June 10, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    33. West Texas Utilities Company
    
    [Docket No. ER98-3076-000]
    
        Take notice that on May 21, 1998, West Texas Utilities Company 
    (WTU), submitted for filing Amendment No. 1 to the Denison Dam Pooling 
    Agreement between Tex-La Electric Cooperative of Texas, Inc. and 
    Rayburn Country Electric Cooperative, Inc. and West Texas Utilities 
    Company. Under the Agreement, WTU dispatches, schedules, receives and 
    backups power and energy from the Southwestern Power Administration's 
    (SWPA's), Denison Dam for the account of Tex-La and Rayburn.
        WTU seeks an effective date of May 22, 1998, and accordingly, seeks 
    waiver of the Commission's notice requirements.
        WTU served copies of the filing on Tex-La, Rayburn, SWPA and the 
    Public Utility Commission of Texas.
        Comment date: June 10, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    34. Northern Indiana Public Service Company
    
    [Docket No. ER98-3077-000]
    
        Take notice that on May 21, 1998, Northern Indiana Public Service 
    Company tendered for filing an executed Sales Service Agreement and an 
    executed Standard Transmission Service Agreement for Non-Firm Point-to 
    Point Transmission Service between Northern Indiana Public Service 
    Company and Merchant Energy Group of the Americas, Inc., (MEGA).
        Under the Transmission Service Agreement, Northern Indiana Public 
    Service Company will provide Point-to-Point Transmission Service to 
    MEGA pursuant to the Open-Access Transmission Tariff filed by Northern 
    Indiana Public Service Company in Docket No. OA96-47-000 and allowed to 
    become effective by the Commission. Under the Sales Service Agreement, 
    Northern Indiana Public Service Company will provide general purpose 
    energy and negotiated capacity to MEGA pursuant to the Wholesale Sales 
    Tariff filed by Northern Indiana Public Service Company in Docket No. 
    ER98-1222-000 as amended by the Commission's Order in Docket No. ER97-
    458-000 and allowed to become effective by the Commission. Northern 
    Indiana Public Service Company has requested that the Service 
    Agreements be allowed to become effective as of May 31, 1998.
        Copies of this filing have been sent to the Indiana Utility 
    Regulatory Commission and the Indiana Office of Utility Consumer 
    Counselor.
        Comment date: June 10, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    35. Northern Indiana Public Service Company
    
    [Docket No. ER98-3078-000]
    
        Take notice that on May 21, 1998, Northern Indiana Public Service 
    Company (Northern Indiana), filed a Service Agreement pursuant to its 
    Power Sales Tariff with Avista Energy, Inc., (Avista). Northern Indiana 
    has requested an effective date of May 30, 1998.
        Copies of this filing have been sent to Avista, to the Indiana 
    Utility Regulatory Commission, and to the Indiana Office of Utility 
    Consumer Counselor.
        Comment date: June 10, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    [[Page 29730]]
    
    36. Virginia Electric and Power Company
    
    [Docket No. ER98-3079-000]
    
        Take notice that on May 21, 1998, Virginia Electric and Power 
    Company (Virginia Power), tendered for filing a Service Agreement for 
    Non-Firm Point-to-Point Transmission Service with Merchant Energy Group 
    of the Americas, Inc. (MEGA), under the Open Access Transmission Tariff 
    to Eligible Purchasers dated July 14, 1997. Under the tendered Service 
    Agreement, Virginia Power will provide non-firm point-to-point service 
    to the Transmission Customers under the rates, terms and conditions of 
    the Open Access Transmission Tariff.
        Copies of the filing were served upon Merchant Energy Group of the 
    Americas, Inc. (MEGA), the Virginia State Corporation Commission and 
    the North Carolina Utilities Commission.
        Comment date: June 10, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    37. Virginia Electric and Power Company
    
    [Docket No. ER98-3080-000]
    
        Take notice that on May 21, 1998, Virginia Electric and Power 
    Company (Virginia Power), tendered for filing a Service Agreement for 
    Non-Firm Point-to-Point Transmission Service with Avista Energy, Inc., 
    under the Open Access Transmission Tariff to Eligible Purchasers dated 
    July 14, 1997. Under the tendered Service Agreement, Virginia Power 
    will provide non-firm point-to-point service to the Transmission 
    Customers under the rates, terms and conditions of the Open Access 
    Transmission Tariff.
        Copies of the filing were served upon Avista Energy, Inc., the 
    Virginia State Corporation Commission and the North Carolina Utilities 
    Commission.
        Comment date: June 10, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    38. Central Illinois Light Company
    
    [Docket No. ER98-3081-000]
    
        Take notice that on May 21, 1998, Central Illinois Light Company 
    (CILCO), 300 Liberty Street, Peoria, Illinois 61602, tendered for 
    filing with the Commission a substitute Index of Point-To-Point 
    Transmission Service Customers under its Open Access Transmission 
    Tariff and service agreements for two new customers, Amoco Energy 
    Trading Corporation and AYP Energy, Inc., and name change and 
    substitution filings for FirstEnergy Corp., FirstEnergy Trading and 
    Power Marketing, Inc., and Southern Company Energy Marketing L.P.
        CILCO requested an effective date of April 24, 1998.
        Copies of the filing were served on the affected customers and the 
    Illinois Commerce Commission.
        Comment date: June 10, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    39. PJM Interconnection, L.L.C.
    
    [Docket No. ER98-3082-000]
    
        Take notice that on May 21, 1998, PJM Interconnection, L.L.C. 
    (PJM), tendered for filing an Amendment to the Service Agreement for 
    Network Integration Transmission Service for Pennsylvania Retail 
    Electric Competition Pilot, entered into, by and between the Office of 
    the Interconnection of PJM and Pennsylvania Electric Company (Penelec), 
    so as to include service to Allegheny Electric Cooperative, Inc. 
    (Allegheny), with respect to the retail pilot programs of two of 
    Allegheny's member cooperatives.
        Copies of this filing were served upon Pennsylvania Electric 
    Company, Allegheny Electric Cooperative, Inc., and the Pennsylvania 
    Public Utility Commission.
        PJM requests an effective date of May 8, 1998, for the amendment to 
    the service agreement.
        Comment date: June 10, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    40. Wisconsin Electric Power Company
    
    [Docket No. ER98-3083-000]
    
        Take notice that on May 21, 1998, Wisconsin Electric Power Company 
    (Wisconsin Electric), tendered for filing an electric service agreement 
    under its Coordination Sales Tariff (FERC Electric Tariff, Original 
    Volume No. 2). Wisconsin Electric respectfully requests an effective 
    date May 22, 1998. Wisconsin Electric is authorized to state that 
    Merchant Energy Group of the Americas, Inc., joins in the requested 
    effective date.
        Copies of the filing have been served on Merchant Energy Group of 
    the Americas, Inc., the Michigan Public Service Commission, and the 
    Public Service Commission of Wisconsin.
        Comment date: June 10, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    41. Tennessee Power Company
    
    [Docket No. TX97-5-000]
    
        Take notice that on April 29, 1998, Tennessee Power Company 
    tendered for filing an amendment in the above-referenced docket.
        Comment date: June 5, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    Standard Paragraph
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426, 
    in accordance with Rules 211 and 214 of the Commission's Rules of 
    Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of these filings are on file with 
    the Commission and are available for public inspection.
    David P. Boergers,
    Acting Secretary.
    [FR Doc. 98-14383 Filed 5-29-98; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
06/01/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-14383
Dates:
June 12, 1998, in accordance with Standard Paragraph E at the end of this notice. The Commission will limit its consideration of comments to those that concern the adequacy or accuracy of the application.
Pages:
29726-29730 (5 pages)
Docket Numbers:
Docket No. EG98-75-000, et al.
PDF File:
98-14383.pdf