99-13789. Petition for Waiver of Compliance  

  • [Federal Register Volume 64, Number 104 (Tuesday, June 1, 1999)]
    [Notices]
    [Page 29406]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-13789]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF TRANSPORTATION
    
    Federal Railroad Administration
    
    
    Petition for Waiver of Compliance
    
        In accordance with 49 CFR 211.9 and 211.41, notice is hereby given 
    that the Federal Railroad Administration (FRA) has received a request 
    for a waiver of compliance with certain requirements of the Federal 
    safety laws and regulations. The petition is described below, including 
    the regulatory provisions involved, the nature of the relief being 
    requested and the petitioner's arguments in favour of relief.
    
    Mc Cloud Railway Company
    
    (Docket Number FRA-1998-4855)
    
        The Mc Cloud Railway Company (MCR) seeks a waiver of compliance 
    from 49 CFR 230.108 (b) (which requires that main air reservoirs shall 
    be hammer tested over its entire surface not less then once every 18 
    months) for steam locomotive number 25. MCR would like to substitute 
    ultrasonic testing of the reservoir in lieu of hammer testing. 
    Ultrasonic testing would be performed each time the locomotive is 
    shopped for general repairs, but not less frequently then once each 18 
    months. The railroad feels that ultrasonic testing will provide a more 
    accurate evaluation of the reservoir's condition than hammer testing.
        Interested parties are invited to participate in these proceedings 
    by submitting written views, data, or comments. FRA does not anticipate 
    scheduling a public hearing in connection with these proceedings since 
    the facts do not appear to warrant a hearing. If any interested party 
    desires an opportunity for oral comment, they should notify FRA, in 
    writing, before the end of the comment period and specify the basis for 
    their request.
        All communications concerning these proceedings should identify the 
    appropriate docket number (e.g., Waiver Petition Docket Number FRA-
    1998-4855) and must be submitted in triplicate to the Docket Clerk, DOT 
    Central Docket Management Facility, Room PL-401, Washington, DC 20590-
    0001. Communications received within 45 days from the publication of 
    this notice will be considered by FRA before final action is taken. 
    Comments received after that date will be considered as far as 
    practicable. All written communications concerning these proceedings 
    are available for examination during regular business hours (9 a.m.-5 
    p.m.) at DOT Central Docket Management Facility, Room PL-401 (Plaza 
    Level), 400 Seventh Street SW, Washington, DC. All documents in the 
    public docket are also available for inspection and copying on the 
    Internet at the docket facility's Web site at
    http://dms.dot.gov.
    
        Issued in Washington, DC on May 21, 1999.
    Grady C. Cothen, Jr.,
    Deputy Associate Administrator for Safety Standards and Program 
    Development.
    [FR Doc. 99-13789 Filed 5-28-99; 8:45 am]
    BILLING CODE 4910-06-P
    
    
    

Document Information

Published:
06/01/1999
Department:
Federal Railroad Administration
Entry Type:
Notice
Document Number:
99-13789
Pages:
29406-29406 (1 pages)
PDF File:
99-13789.pdf