96-14664. El Paso Natural Gas Company; Notice of Proposed Changes in FERC Gas Tariff
[Federal Register Volume 61, Number 113 (Tuesday, June 11, 1996)]
[Notices]
[Page 29542]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14664]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. RP96-254-000]
El Paso Natural Gas Company; Notice of Proposed Changes in FERC
Gas Tariff
June 5, 1996.
Take notice that on May 31, 1996, El Paso Natural Gas Company (El
Paso), tendered for filing as part of its FERC Gas Tariff, Second
Revised Volume No. 1-A, the following tariff sheets, to become
effective July 1, 1996:
Third Revised Sheet Nos. 30, 31, and 32
El Paso states that Section 31.4(b) of its tariff provides the
mechanism by which El Paso adjusts the interest calculated on the
unrecovered balance of its stranded investment cost in Washington Ranch
Storage Facility and then adjusts the Monthly Amortized Amount
allocated to each Shipper. El Paso states that the Tariff further
provides that El Paso will adjust its rates for any differences
resulting from the use of the estimated interest versus the actual
interest and such difference shall be added to or deducted from the
estimated interest for the upcoming six month period.
El Paso states that the Monthly Amortized Amount has been adjusted
to reflect the projected interest and the difference in the previously
estimated interest and actual interest utilizing the appropriate
interest rate calculated pursuant to Section 154.501(d)(1) of the
Commission's Regulations under the Natural Gas Act. El Paso states that
the projected interest was calculated on the remaining unrecovered
balance of the stranded investment costs. El Paso states that the
revised Washington Ranch Reservation Surcharges and resulting Monthly
Billed Amounts are shown on the tendered tariff sheets.
Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426,
in accordance with Sections 385.214 and 385.211 of the Commission's
Rules and Regulations. All such motions or protests must be filed as
provided in Section 154.210 of the Commission's Regulations. Protests
will be considered by the Commission in determining the appropriate
action to be taken, but will not serve to make protestants parties to
the proceeding. Any person wishing to become a party must file a motion
to intervene. Copies of this filing are on file with the Commission and
are available for public inspection in the Public Reference Room.
Lois D. Cashell,
Secretary.
[FR Doc. 96-14664 Filed 6-10-96; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 06/11/1996
- Department:
- Energy Department
- Entry Type:
- Notice
- Document Number:
- 96-14664
- Pages:
- 29542-29542 (1 pages)
- Docket Numbers:
- Docket No. RP96-254-000
- PDF File:
-
96-14664.pdf