[Federal Register Volume 61, Number 113 (Tuesday, June 11, 1996)]
[Notices]
[Pages 29548-29551]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14710]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. ER96-1086-001, et al.]
SCANA Energy Marketing Inc., et al.; Electric Rate and Corporate
Regulation Filings
June 5, 1996.
Take notice that the following filings have been made with the
Commission:
1. SCANA Energy Marketing, Inc.
[Docket No. ER96-1086-001]
Take notice that on May 28, 1996, SCANA Energy Marketing, Inc.
tendered for filing copies of its revised Code of Conduct in compliance
with the Commission's order issued on May 13, 1996 in Docket No. ER96-
1086-000.
Comment date: June 19, 1996, in accordance with Standard Paragraph
E at the end of this notice.
2. Western Systems Power Pool, Mesquite Energy Services Inc., Rig
Gas Inc., Vastar Power Marketing, Inc., ConAgra Energy Services,
Inc., Eastex Power Marketing, Inc., Federal Energy Sales, Inc.
[Docket No. ER91-195-024, Docket No. ER95-74-004, Docket No. ER95-480-
005, Docket No. ER95-1685-001, Docket No. ER95-1751-002, Docket No.
ER96-118-003, Docket No. ER96-918-001 (not consolidated)]
Take notice that the following informational filings have been made
with the Commission and are on file and available for inspection and
copying in the Commission's Public Reference Room:
On May 8, 1996, Western Systems Power Pool filed certain
information as required by the Commission's April 23, 1991, order in
Docket No. ER91-195-000.
On May 22, 1996, Mesquite Energy Services Inc. filed certain
information as required by the Commission's January 4, 1995, order in
Docket No. ER95-74-000.
On May 1, 1996, Rig Gas Inc. filed certain information as required
by the Commission's March 16, 1995, order in Docket No. ER95-480-000.
On May 15, 1996, Vastar Power Marketing, Inc. filed certain
information as required by the Commission's October 26, 1995, order in
Docket No. ER95-1685-000.
On May 24, 1996, ConAgra Energy Services, Inc. filed certain
information as required by the Commission's October 23, 1995, order in
Docket No. ER95-1751-000.
On May 15, 1996, Eastex Power Marketing, Inc. filed certain
information as required by the Commission's November 28, 1995, order in
Docket No. ER96-118-000.
On May 22, 1996, Federal Energy Sales, Inc. filed certain
information as required by the Commission's March 1, 1996, order in
Docket No. ER96-918-000.
3. AES Power, Inc., LG&E Power Marketing, Inc., Vastar Power
Marketing, Inc., Quantum Energy Resources, Inc.
[Docket No. ER94-890-009, Docket No. ER94-1188-004, Docket No. ER95-
1685-002, Docket No. ER96-947-001 (not consolidated)]
Take notice that the following informational filings have been made
with the Commission and are on file and available for inspection and
copying in the Commission's Public Reference Room:
On May 1, 1996, AES Power, Inc. filed certain information as
required by the Commission's April 8, 1994, order in Docket No. ER94-
890-000.
On May 1, 1996, LG&E Power Marketing, Inc. filed certain
information as required by the Commission's August 19, 1994, order in
Docket No. ER94-1188-000.
On May 15, 1996, Vastar Power Marketing, Inc. filed certain
information as required by the Commission's October 26, 1995, order in
Docket No. ER95-1685-000.
On May 22, 1996, Quantum Energy Resources, Inc. filed certain
information as required by the Commission's March 5, 1996, order in
Docket No. ER96-947-000.
4. Entergy Services, Inc.
[Docket Nos. ER96-838-000, ER96-839-000 and ER96-842-000]
Take notice that on May 17, 1996, Entergy Services, Inc. tendered
for filing an amendment in the above-referenced dockets.
Comment date: June 19, 1996, in accordance with Standard Paragraph
E at the end of this notice.
5. Allegheny Power Service Corporation on behalf of Monongahela
Power Co.; The Potomac Edison Company and West Penn Power Company
(Allegheny Power)
[Docket No. ER96-1049-001]
Take notice that on May 28, 1996, Allegheny Power Service
Corporation on behalf of Monongahela Power Company, The Potomac Edison
Company and West Penn Power Company (Allegheny Power) submitted a
compliance filing in order to comply with a Letter Order issued by the
Commission on May 3, 1996.
Comment date: June 19, 1996, in accordance with Standard Paragraph
E at the end of this notice.
6. Atlantic City Electric Company
[Docket No. ER96-1307-001]
Take notice that on May 29, 1996, Atlantic City Electric Company
tendered for filing its refund report in the above-referenced docket.
Comment date: June 19, 1996, in accordance with Standard Paragraph
E at the end of this notice.
7. Atlantic City Electric Company
[Docket No. ER96-1361-001]
Take notice that on May 31, 1996, Atlantic City Electric Company
tendered for filing changes to its market-based rate tariff.
Atlantic City Electric Company indicates that it has served the
filing on all parties in Docket No. ER96-1361-000 and on the New Jersey
Board of Public Utilities.
[[Page 29549]]
Comment date: June 19, 1996, in accordance with Standard Paragraph
E at the end of this notice.
8. Aquila Power Corporation
[Docket No. ER96-1366-001]
Take notice that on May 30, 1996, Aquila Power Corporation tendered
for filing revisions to its FERC Electric Rate Schedule No. 1 and its
Statement of Policy and Code of Conduct.
Comment date: June 19, 1996, in accordance with Standard Paragraph
E at the end of this notice.
9. New Energy Ventures, Inc.
[Docket No. ER96-1387-000]
Take notice that on May 29, 1996, New Energy Ventures, Inc.
tendered for filing an amendment in the above-referenced docket.
Comment date: June 19, 1996, in accordance with Standard Paragraph
E at the end of this notice.
10. Southwestern Public Service Company
[Docket No. ER96-1449-000]
Take notice that on May 14, 1996, Southwestern Public Service
Company tendered for filing a letter requesting cancellation of the
wholesale interruptible rate rider FERC Rate No. 113.
Comment date: June 19, 1996, in accordance with Standard Paragraph
E at the end of this notice.
11. Louisville Gas and Electric Co.
[Docket Nos. ER96-1646-000, ER96-1647-000, ER96-1648-000, ER96-1654-
000]
Take notice that Louisville Gas and Electric Company (LG&E),
tendered for filing on May 31, 1996, an amendment to its filings in the
above-referenced dockets. LG&E states that the purpose of the amendment
is to modify LG&E's Rate Schedule GSS to include two forms of service
agreements.
Comment date: June 19, 1996, in accordance with Standard Paragraph
E at the end of this notice.
12. Montana Power Company
[Docket No. ER96-1685-000]
Take notice that on May 29, 1996, Montana Power Company tendered
for filing an amendment in the above-referenced docket.
Comment date: June 19, 1996, in accordance with Standard Paragraph
E at the end of this notice.
13. Midwest Energy, Inc.
[Docket No. ER96-1791-000]
Take notice that May 14, 1996, Midwest Energy, Inc. tendered for
filing an amendment in the above-referenced docket.
Comment date: June 19, 1996, in accordance with Standard Paragraph
E at the end of this notice.
14. CPS Capital, Ltd.
[Docket No. ER96-1798-000]
Take notice that on May 28, 1996, CPS Capital, Ltd. tendered for
filing an amendment in the above-referenced docket.
Comment date: June 19, 1996, in accordance with Standard Paragraph
E at the end of this notice.
15. Florida Power & Light Company
[Docket No. ER96-1900-000]
Take notice that on May 23, 1996, Florida Power & Light Company
(FPL), tendered for filing proposed service agreements with Delhi
Energy Services, Inc. for transmission service under FPL's Transmission
Tariff No. 2 and FPL's Transmission Tariff No. 3.
FPL requests that the proposed service agreements be permitted to
become effective on June 1, 1996, or as soon thereafter as practicable.
FPL states that this filing is in accordance with Part 35 of the
Commission's Regulations.
Comment date: June 19, 1996, in accordance with Standard Paragraph
E at the end of this notice.
16. Madison Gas and Electric Company
[Docket No. ER96-1901-000]
Take notice that on May 23, 1996, Madison Gas and Electric Company
(MGE), tendered for filing a service agreement with Eastex Power
Marketing, Inc., Sonat Power Marketing, Inc., and TransCanada Power
Corporation under MGE's Power Sales Tariff. In addition, MGE filed
First Revised Sheet No. 23 of its Volume No. 2 to incorporate a minor
revision to the Form of Service Agreement. MGE requests an effective
date 60 days from the filing date.
Comment date: June 19, 1996, in accordance with Standard Paragraph
E at the end of this notice.
17. Northeast Utilities Service Company
[Docket No. ER96-1902-000]
Take notice that on May 23, 1996, Northeast Utilities Service
Company (NUSCO), on behalf of Public Service Company of New Hampshire
(PSNH), tendered for filing a Bulk Power Supply Service Agreement
(Agreement) to provide required service to PSNH Energy, Inc. (PSNH
Energy).
NUSCO requests that the rate schedule become effective on May 28,
1996, or such date as the SEC approves the formation of a retail
marketing affiliate to participate in the New Hampshire Pilot Program.
NUSCO states that copies of the rate schedule have been mailed or
delivered to the parties to the Agreement and the affected state
utility commissions.
Comment date: June 19, 1996, in accordance with Standard Paragraph
E at the end of this notice.
18. Florida Power & Light Company
[Docket No. ER96-1903-000]
Take notice that on May 23, 1996, Florida Power & Light Company
(FPL), tendered for filing a Long Term Firm Transmission Service
Agreement For Stanton Unit Two Between FPL And The Florida Municipal
Power Agency. That Agreement is filed under Transmission Tariff No. 1
of Florida Power & Light Company For Long-Term Transmission Service.
FPL proposed to make the Agreement effective June 1, 1996.
Comment date: June 19, 1996, in accordance with Standard Paragraph
E at the end of this notice.
19. Florida Power & Light Company
[Docket No. ER96-1904-000]
Take notice that on May 23, 1996, Florida Power & Light Company
(FPL), tendered for filing proposed service agreements with Federal
Energy Sales Inc. for transmission service under FPL's Transmission
Tariff No. 2 and FPL's Transmission Tariff No. 3.
FPL requests that the proposed service agreements be permitted to
become effective on June 1, 1996, or as soon thereafter as practicable.
FPL states that this filing is in accordance with Part 35 of the
Commission's Regulations.
Comment date: June 19, 1996, in accordance with Standard Paragraph
E at the end of this notice.
20. Southwestern Public Service Company
[Docket No. ER96-1905-000]
Take notice that on May 23,1996, Southwestern Public Service
Company (SPS), filed with the Commission an amendment to SPS's Rate
Schedule in effect with Public Service Company of Oklahoma (Customer).
SPS indicates that the purpose of the filing is to harmonize its
emergency service rates with industry practice and Commission guidance.
SPS asks that the revised rate be made effective as of June 1, 1996.
SPS states that copies of the amendment have been served on
Customer.
Comment date: June 19, 1996, in accordance with Standard Paragraph
E at the end of this notice.
[[Page 29550]]
21. Southwestern Public Service Company
[Docket No. ER96-1906-000]
Take notice that on May 23, 1996, Southwestern Public Service
Company (SPS) filed with the Commission an amendment to SPS Rate
Schedule FERC No. 78 with WestPlains Energy Co. (Customer). SPS
indicates that the purpose of the filing is to harmonize its emergency
service rates with industry practice and Commission guidance. SPS asks
that the revised rate be made effective as of June 1, 1996.
SPS states that copies of the amendment have been served on
Customer.
Comment date: June 19, 1996, in accordance with Standard Paragraph
E at the end of this notice.
22. Southwestern Public Service Company
[Docket No. ER96-1907-000]
Take notice that on May 23, 1996, Southwestern Public Service
Company (SPS), filed with the Commission an amendment to SPS Rate
Schedule FERC No. 58 in effect with West Texas Utilities Co.
(Customer). SPS indicates that the purpose of the filing is to
harmonize its emergency service rates with industry practice and
Commission guidance. SPS asks that the revised rate be made effective
as of June 1, 1996.
SPS states that copies of the amendment have been served on
Customer.
Comment date: June 19, 1996, in accordance with Standard Paragraph
E at the end of this notice.
23. Southwestern Public Service Company
[Docket No. ER96-1908-000]
Take notice that on May 23, 1996, Southwestern Public Service
Company (SPS), filed with the Commission an amendment to SPS Rate
Schedule FERC No. 102 with Public Service Company of New Mexico
(Customer). SPS indicates that the purpose of the filing is to
harmonize its emergency service rates with industry practice and
Commission guidance. SPS asks that the revised rate be made effective
as of June 1, 1996.
SPS states that copies of the amendment have been served on
Customer.
Comment date: June 19, 1996, in accordance with Standard Paragraph
E at the end of this notice.
24. Southwestern Public Service Company
[Docket No. ER96-1909-000]
Take notice that on May 23, 1996, Southwestern Public Service
Company (SPS), filed with the Commission an amendment to SPS Rate
Schedule FERC No. 107 with Texas-New Mexico Power Company (Customer).
SPS indicates that the purpose of the filing is to harmonize its
emergency service rates with industry practice and Commission guidance.
SPS asks that the revised rate be made effective as of June 1, 1996.
SPS states that copies of the amendment have been served on
Customer.
Comment date: June 19, 1996, in accordance with Standard Paragraph
E at the end of this notice.
25. Southwestern Public Service Company
[Docket No. ER96-1910-000]
Take notice that on May 23, 1996, Southwestern Public Service
Company (SPS), filed with the Commission an amendment to SPS Rate
Schedule FERC No. 104 with El Paso Electric Company (Customer). SPS
indicates that the purpose of the filing is to harmonize its emergency
service rates with industry practice and Commission guidance. SPS asks
that the revised rate be made effective as of June 1, 1996.
SPS states that copies of the amendment have been served on
Customer.
Comment date: June 19, 1996, in accordance with Standard Paragraph
E at the end of this notice.
26. Duke Power Company
[Docket No. ER96-1911-000]
Take notice that on May 24, 1996, Duke Power Company (Duke),
tendered for filing the following: (1) Service Agreement for Market
Rate (Schedule MR) Sales between Duke and Delmarva Power & Light
Company; (2) Service Agreement for Market Rate (Schedule MR) Sales
between Duke and Wisconsin Power & Light Company; (3) Service Agreement
for Market Rate (Schedule MR) Sales between Duke and UtiliCorp United,
Inc., and (4) Service Agreement for Market Rate (Schedule MR) Sales
between Duke and Commonwealth Edison Company.
Comment date: June 19, 1996, in accordance with Standard Paragraph
E at the end of this notice.
27. Consumers Power Company
[Docket No. ER96-1912-000]
Take notice that on May 24, 1996, Consumers Power Company
(Consumers), tendered for filing a Supplemental Agreement No. 3 which
modifies the Service Agreement for Limited Term, Pre-Scheduled
Interruptible Wholesale Electric Service to the City of Holland.
Copies of the filing were served upon the Michigan Public Service
Commission and the City of Holland.
Comment date: June 19, 1996, in accordance with Standard Paragraph
E at the end of this notice.
28. Kansas City Power & Light Company
[Docket No. ER96-1913-000]
Take notice that on May 24, 1996, Kansas City Power & Light Company
(KCPL), tendered for filing a Service Agreement dated April 30, 1996,
between KCPL and Western Power Services, Inc. (WPS). KCPL proposes an
effective date of April 10, 1996, and requests waiver of the
Commission's notice requirement. This Agreement provides for the rates
and charges for Non-Firm Transmission Service between KCPL and WPS.
In its filing, KCPL states that the rates included in the above-
mentioned Service Agreement are KCPL's rates and charges which were
conditionally accepted for filing by the Commission in Docket No. ER94-
1045-000.
Comment date: June 19, 1996, in accordance with Standard Paragraph
E at the end of this notice.
29. Florida Power Corporation
[Docket No. ER96-1914-000]
Take notice that on May 24, 1996, Florida Power Corporation (FPC),
tendered for filing a contract for the provision of interchange service
between itself and CNG Power Services Corporation. The contract
provides for service under Schedule J, Negotiated Interchange Service
and OS, Opportunity Sales.
FPC requests Commission waiver of the 60-day notice requirement in
order to allow the contract to become effective as a rate schedule on
May 28, 1996. Waiver is appropriate because this filing provides for
rates under the Schedule OS that are lower than the rates for Schedule
OS which have been previously accepted for filing.
Comment date: June 19, 1996, in accordance with Standard Paragraph
E at the end of this notice.
Standard Paragraph
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426,
in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in
[[Page 29551]]
determining the appropriate action to be taken, but will not serve to
make protestants parties to the proceeding. Any person wishing to
become a party must file a motion to intervene. Copies of this filing
are on file with the Commission and are available for public
inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 96-14710 Filed 6-10-96; 8:45 am]
BILLING CODE 6717-01-P