97-15276. Record of Decision for the Environmental Impact Statement/ Environmental Impact Report (EIS/EIR) for Proposed Combined-Forces Training Activities, New Equipment Utilization, and Range Modernization Program at Camp Roberts Army National ...  

  • [Federal Register Volume 62, Number 112 (Wednesday, June 11, 1997)]
    [Notices]
    [Pages 31798-31799]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-15276]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF DEFENSE
    
    Department of the Army
    
    
    Record of Decision for the Environmental Impact Statement/
    Environmental Impact Report (EIS/EIR) for Proposed Combined-Forces 
    Training Activities, New Equipment Utilization, and Range Modernization 
    Program at Camp Roberts Army National Guard Training Site, California
    
    AGENCY: Department of the Army, DoD.
    
    ACTION: Notice of Availability.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The Record of Decision (ROD) was signed on May 1, 1997.
        The decision made in the ROD was to implement the proposed action 
    and a series of mitigation measures to minimize the environmental 
    impacts of this action. The proposed action consists of three 
    components: combined-forces training with two brigades of personnel and 
    associated equipment, new equipment utilization, and a range 
    modernization program.
    
    [[Page 31799]]
    
        The combined-forces training component would consist of increasing 
    the intensity of training from a typical maximum of approximately 5,300 
    soldiers to approximately 10,600 soldiers during an annual training 
    period at Camp Roberts. Four new types of equipment would be introduced 
    at Camp Roberts as part of the proposed action: the M1 Abrams series of 
    tanks would replace the M60 series tanks, Bradley Fighting Vehicles 
    would replace the M113 series armored personnel carriers, the Multiple-
    Launch Rocket System would replace all but two of the M110 8-inch 
    howitzers, and the AH-64 series Apache helicopters would replace the 
    Cobra helicopters. The range modernization program component would be 
    composed of both upgrading existing ranges and constructing new ranges.
        Copies: Copies of the ROD will be mailed to individuals who 
    participated in the public scoping process. Copies will also be sent to 
    Federal, state, regional, and local agencies; interested organizations 
    and agencies; and public libraries. Individuals not currently on the 
    mailing list may obtain a copy by request.
    
    FOR FURTHER INFORMATION CONTACT:
    Lieutenant Colonel William Parsonage, EIS/EIR Project Officer. Camp 
    Roberts Army National Guard Training Site, Camp Roberts, CA 93451-5000; 
    telephone (805) 238-8207.
    
        Dated: June 6, 1997.
    Raymond J. Fatz,
    Deputy Assistant Secretary of the Army, (Environment, Safety, and 
    Occupational Health) OASA (I,L&E).
    [FR Doc. 97-15276 Filed 6-10-97; 8:45 am]
    BILLING CODE 3710-08-M
    
    
    

Document Information

Published:
06/11/1997
Department:
Army Department
Entry Type:
Notice
Action:
Notice of Availability.
Document Number:
97-15276
Pages:
31798-31799 (2 pages)
PDF File:
97-15276.pdf