[Federal Register Volume 63, Number 112 (Thursday, June 11, 1998)]
[Notices]
[Pages 31987-31988]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-15525]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application Tendered for Filing With the Commission
June 5, 1998.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Major New License (Tendering Notice).
b. Project No.: 2651-006.
c. Date filed: May 19, 1998.
d. Applicant: Indiana Michigan Power Company.
e. Name of Project: Elkhart Hydroelectric Project.
f. Location: In the City of Elkhart, Concord Township, Elkhart
County, Indiana, on the St. Joseph River 77 miles upstream from
confluence with Lake Michigan.
g. Filed Pursuant to: Federal Power Act, 16 USC 791(a)-825(r).
h. Applicant Contact: J.R. Jones, Senior Vice President, Fossil &
Hydro Production, American Electric Power Service Corporation, 1
Riverside Plaza, Columbus, Ohio 43215, (614) 223-1801.
i. FERC Contact: Edward R. Meyer, (202) 208-7998.
j. Brief Description of Project: The proposed project would consist
of: (1) a 300-foot-long by 14-foot-high concrete spillway, the crest of
which bears 11, 25-foot-wide by 10.5-foot-high Tainter gates separated
by 2.5-foot-wide piers;
[[Page 31988]]
(2) an approximately 100-foot-long by 80-foot-wide brick powerhouse
attached to the spillway on the south bank of the St. Joseph River
having 3 horizontal shaft 4-Francis turbines (2 camelback pairs) with a
3.44 megawatts installed capacity; (3) 6, 9-foot six-inch diameter
concrete draft tube tunnels transitioning to 10-foot-high 6-foot-wide
openings; and (4) other appurtenances.
k. With this notice, we are initiating consultation with the
Indiana State Historic Preservation Officer (SHPO), as required by
Sec. 106, National Historic Preservation Act, and the regulations of
the Advisory Council on Historic Preservation, 36 CFR 800.4.
l. Under Section 4.32(b)(7) of the Commission's regulations (18 CFR
4.32(b)(7)), if any resource agency, SHPO, Indian Tribe, or person
believes that the applicant should conduct an additional scientific
study to form an adequate, factual basis for a complete analysis of
this application on its merits, they must file a request for the study
with the Commission, together with justification for such request, not
later than 60 days after the application is filed, and must serve a
copy of the request on the applicant.
David P. Boergers,
Acting Secretary.
[FR Doc. 98-15525 Filed 6-16-98; 8:45 am]
BILLING CODE 6717-01-M