99-14905. Environmental Impact Statements and Regulations; Availability of EPA Comments  

  • [Federal Register Volume 64, Number 112 (Friday, June 11, 1999)]
    [Notices]
    [Pages 31571-31572]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-14905]
    
    
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    
    [ER-FRL-6243-6]
    
    
    Environmental Impact Statements and Regulations; Availability of 
    EPA Comments
    
        Availability of EPA comments prepared May 17, 1999 through May 21, 
    1999 pursuant to the Environmental Review Process (ERP), under Section 
    309 of the Clean Air Act and Section 102(2)(c) of the National 
    Environmental Policy Act as amended. Requests for copies of EPA 
    comments can be directed to the Office of Federal Activities at (202) 
    564-7167.
        An explanation of the ratings assigned to draft environmental 
    impact statements (EISs) was published in FR dated April 09, 1999 (64 
    FR 17362).
    
    Draft EISs
    
        ERP No. D-BLM-G02008-NM Rating EC2, Bistil/De-Na-Zin Wilderness Oil 
    and Gas Development, To Drill 13 Oil and Gas Wells on Two Leases, 
    Permit to Drill and Right-of-Way Permit, San Juan County, NM.
        Summary: EPA expressed environmental concerns due to potential 
    impacts to the wilderness area. EPA requested that BLM consider 
    selection of Alternative A as the agency preferred alternative. 
    However, EPA would not object to the selection of the No Action 
    Alternative, if chosen.
        ERP No. D-COE-E39048-FL Rating LO, Alligator Chain of Lakes and 
    Lake Gentry Extreme Drawdown and Habitat Enhancement Project, Implement 
    Aquatic Habitat Enhancement, Osceola County, FL.
    
    [[Page 31572]]
    
        Summary: EPA had no objections to the proposed drawdown of the 
    Alligator Chain and Lake Gentry in order to promote fisheries 
    production and recreational opportunties.
        ERP No. D-FAA-D51026-00 Rating EC2, Potomac Consolidated Terminal 
    (PCT) Radar Approach Control Facility (TRACON), To consolidated four 
    TRACON in Baltimore-Washington Metro Terminal Area, Possible Site is 
    Vint Hill Farms, VA, DC and MD.
        Summary: EPA expressed environmental concern regarding the proposed 
    action as it relates to future air traffic actions. EPA requested 
    clarification of this issue.
        ERP No. D-FAA-F51044-OH Rating EO2, Toledo Express Airport (TOL), 
    Proposed Noise Compatibility Plan Air Traffic Actions and Proposed 
    Aviation Related Industrial Development, Airport Layout Plan and 
    Funding, Lucas County, OH.
        Summary: EPA expressed environmental objections due to potentially 
    significant noise impacts. EPA expressed detailed comments regarding 
    the generic nature of the DEIS and the lack of interagency coordination 
    along with detailed comments on noise, wetlands and supporting data.
    
    Final EISs
    
        ERP No. F-BOP-D80028-WV Preston County Federal Correctional 
    Facility, Construction, Preston County, WV.
        Summary: EPA expressed environmental concerns regarding potential 
    wetland impacts that should be avoided. Mitigation measures will be 
    required for wetland impacts that cannot be avoided.
        ERP No. F-BOP-D81030-WV Ohio and Tyler Counties Federal 
    Correctional Facility, Construction and Operation, Three Possible 
    Sites: Wheeling-Ohio County Airport Industrial Park, Fort Henry and 
    Iver Flats, Ohio and Tyler Counties, WV.
        Summary: EPA expressed environmental concerns due to potential 
    wetlands impacts. Mitigation measures will be required for wetland 
    impacts (building or road placement) that cannot be avoided. EPA 
    concurs generally with the decisions presented in this document and 
    continues to encourage early delineation of the wetlands to allow the 
    facility design to preferably avoid or minimize the wetlands impacts.
        ERP No. F-TVA-E39038-TN Columbia Dam Component of the Duck River 
    Project, Implementation, Use of Lands Acquired, Possible COE Section 
    404 Permit, Maury County, TN.
        Summary: EPA expressed environmental concerns regarding the 
    proposed reuse of lands and the attendant pollution potential 
    associated with development. EPA also expressed concern about the 
    development of the Fountain Creek Reservoir for water supply from a 
    potential wetlands inundation and development perspective.
    
        Dated: June 8, 1999.
    Ken Mittelholtz,
    Environmental Protection Specialist, Office of Federal Activities.
    [FR Doc. 99-14905 Filed 6-10-99; 8:45 am]
    BILLING CODE 6560-50-U
    
    
    

Document Information

Published:
06/11/1999
Department:
Environmental Protection Agency
Entry Type:
Notice
Document Number:
99-14905
Pages:
31571-31572 (2 pages)
Docket Numbers:
ER-FRL-6243-6
PDF File:
99-14905.pdf