[Federal Register Volume 63, Number 113 (Friday, June 12, 1998)]
[Notices]
[Page 32207]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-15758]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-5492-5]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or (202) 564-7153. Weekly receipt of
Environmental Impact Statements Filed June 1, 1998 Through June 5, 1998
Pursuant to 40 CFR 1506.9.
EIS No. 980208, Draft EIS, AFS, AK, Sea Level Harvest Timber Sale,
Implemention, Tongass National Forest, Ketchikan Ranger District, U.S.
Coast Guard Permit, NPDES Permit and COE Section 10 and 404 Permit,
Revillagigedo (Revilla) Island/Cleveland Peninsula, AK, Due: August 7,
1998, Contact: Peter Griffin (907) 228-4131.
EIS No. 980209, Final EIS, FHW, CA, I-805 Nobel Drive Interchange and
Extension Project, Improvements, between Nobel Drive and Miramar Road/
LaJolla Village Drive and the extension of Nobel Drive from Shoreline
Drive to Miramar Road, in the City of San Diego, San Diego County, CA,
Due: July 13, 1998, Contact: G. Glenn Clinton (916) 498-5037.
EIS No. 980210, Final EIS, JUS, CA, Service Processing Center (SPC) for
Detainees, Construction and Operation, Possible Sites, Stockton and
Tracy Sites, San Joaquin Counties, CA, Due: July 13, 1998, Contact:
William A. Kopitz (202) 307-1877.
EIS No. 980211, Final EIS, AFS, CA, Payen, Pass Creek and English Range
Allotments, Grazing Land Management Plan, Implementation, Tahoe
National Forest, Sierraville Ranger District, Sierra and Nevada
Counties, CA, Due: July 13, 1998, Contact: Fred Kent (530) 994-3401.
EIS No. 980212, Final Supplement, AFS, OR, Summit Fire Recovery Forest
Restoration Project, Implementation, Malheur National Forest, Long
Creek Ranger District, Grant County, OR, Due: July 13, 1998, Contact:
Michael Hutchins (541) 575-3000.
EIS No. 980213, Final EIS, BOP, DC, District of Columbia, Department of
Corrections (DCDC), Felony Inmate Population, Implementation,
Contracting Private Correctional Facilities for Housing of Inmate
Population, United States Capitol, City of Washington, D.C., Due: July
13, 1990, Contact: David D. Dorworth (202) 514-6470.
EIS No. 980214, Final EIS, FHW, PA, US 222 Corridor Design Location
Study, Improvements from Breingsville to the I-78 Interchange, Funding,
Lower and Upper Macungie Township, Lehigh County, PA, Due: July 13,
1998, Contact: Ronald W. Carmichael (717) 221-3461.
EIS No. 980215, Draft EIS, USA, AZ, Fort Huachuca Real Property Master
Planning, Approval of Land Use and Real Estate Investment Strategies,
Cochise County, AZ, Due: July 27, 1998, Contact: Gregory Brewer (703)
693-4583.
EIS No. 980216, Final EIS, COE, CA, Yuba River Basin Investigation
Study, Flood Protection, Also Portions of the Feather River Basin below
Oroville Dam, City of Maryville Yuba County, CA, Due: July 13, 1998,
Contact: Jack Rinck (916) 557-6715.
EIS No. 980217, Draft EIS, DOC, PR, VI, Corals and Reef Associated
Plants and Invertebrates, Fishery Management Plan, Amendment I Marine
Conservation District (MCD), Exclusive Economic Zone (EEZ), Puerto
Islands and U.S. Virgin Islands, PR and VI, Due: July 27, 1998,
Contact: Andrew J. Kemmerer (813) 570-5305.
EIS No. 980218, Draft EIS, COE, AK, Beaufort Sea Oil and Gas
Development Northstar Project, Implementation, NPDES Permit, Sea
Island, Alaskan Beaufort Sea, Offshore Marine Environment and Onshore
Northslope of Alaskan Coastal Plain, AK, Due: July 27, 1998, Contact:
Ms. Terry Carpenter (907) 753-2712.
EIS No. 980219, Final EIS, AFS, MT, Bighorn Sheep Range and China Basin
Salvage Project, Wildlife Habitat Enhancement Activities and Watershed
Restoration Activities, Kootenai National Forest, Libby Ranger
District, Lincoln County, MT, Due: July 13, 1998, Contact: Kirsten
Kaiser (406) 293-7773.
EIS No. 980220, Legislative Draft EIS, USN, NV, Fallon Naval Air
Station, Renewal of the B-20 Land Withdrawal, City of Fallon, Churchill
County, NV, Due: August 3, 1998, Contact: Sam Dennis (650) 244-3007.
EIS No. 980221, Draft EIS, USA, IN, Newport Chemical Depot,
Construction and Operation, Pilot Testing of Neutralization/
Supercritical Water Oxidation of VX Agent, Vermillion County, IN, Due:
July 27, 1998, Contact: Matt Hurlburt (410) 612-7207.
EIS No. 980222, Draft EIS, GSA, NY, Governors Island Disposition of
Surplus Federal Real Property, Implementation, Upper New York Bay, NY,
Due: July 27, 1998, Contact: Peter A. Sneed (212) 264-3581.
EIS No. 980223, Draft EIS, NPS, MT, Interagency Bison Management Plan
for State of Montana and Yellowstone National Park, Implementation,
Maintain a wild, Free Ranging Population, Address the risk of
Brucellosis Transmission, Park and Gallatin Counties, MT, Due: October
1, 1998, Contact: Sarah Bransom (303) 969-2310.
EIS No. 980224, Final EIS, COE, GA, Brunswick Harbor Deepening Federal
Navigation Project, Improvements, Brunswick, Glynn County, GA, Due:
July 13, 1998, Contact: William G. Bailey (912) 652-5781.
Dated: June 9, 1998.
Ken Mittelholtz,
Environmental Specialist, NEPA Compliance Division, Office of Federal
Activities.
[FR Doc. 98-15758 Filed 6-11-98; 8:45 am]
BILLING CODE 6560-50-U