97-15622. Environmental Impact Statements and Regulations; Availability of EPA Comments  

  • [Federal Register Volume 62, Number 114 (Friday, June 13, 1997)]
    [Notices]
    [Page 32321]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-15622]
    
    
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    
    [ER-FRL-5481-5]
    
    
    Environmental Impact Statements and Regulations; Availability of 
    EPA Comments
    
        Availability of EPA comments prepared May 26, 1997 Through May 30, 
    1997 pursuant to the Environmental Review Process (ERP), under Section 
    309 of the Clean Air Act and Section 102(2)(c) of the National 
    Environmental Policy Act as amended. Requests for copies of EPA 
    comments can be directed to the Office of Federal Activities at (202) 
    564-7167.
        An explanation of the ratings assigned to draft environmental 
    impact statements (EISs) was published in FR dated April 04, 1997 (62 
    FR 16154).
    
    Draft EISs
    
        ERP No. D-DOA-K36119-HI Rating EC2, Waimea-Paauilo Watershed 
    Project, To Alleviate the Agricultural Water Shortage, Watershed 
    Protection and Flood Prevention, COE Section 404 Permit. Hawaii County, 
    HI.
        Summary: EPA expressed environmental concern regarding the lack of 
    an adequate discussion of purpose and need. EPA requested that the 
    final document fully describe the purpose and need and evaluate an 
    additional alternative which includes the Kauahi reservoir and 
    irrigation distribution system, but omits the stockwater distribution 
    system.
        ERP No. D-DOE-L36109-00 Rating LO, Watershed Management Program 
    Standards and Guidelines, Implementation, ID, NV, MT, OR, WA and WY.
        Summary: Our abbreviated review has revealed no EPA concerns on 
    this project.
        ERP No. D-DOI-J28019-UT Rating EO2, Upalco Unit/Uinta Basin 
    Replacement Project, Water Supply Management, Approvals and Permits 
    Issuance, Duchesne and Uintah Counties, UT.
        SUMMARY: EPA expressed environmental objection over the lack of an 
    effective portrayal of the cumulative impacts to the aquatic resources, 
    especially in light of past significant impacts to the aquatic systems 
    of the project. EPA recommended that the Final EIS more clearly 
    acknowledge the impacts of additional depletions on water quality. EPA 
    also expressed environmental concern with the lack of detail concerning 
    impact documentation and mitigation for the proposed wetland impacts 
    and recommended that the Final EIS better document how and where the 
    mitigation will occur.
        ERP No. D-DOI-J39026-UT Rating EO2, Uintah Unit Replacement 
    Project, Implementation, Central Utah Water Conservancy District, 
    Approval of Several Permits, Duchesne and Uintah Counties, UT.
        Summary: EPA expressed environmental objection over the lack of an 
    effective portrayal of the cumulative impacts to the aquatic resources, 
    especially in light of past significant impacts to the aquatic systems 
    of the project. EPA recommended that the Final EIS more clearly 
    acknowledge the impacts of additional depletions on water quality. EPA 
    also expressed environmental concern with the lack of detail concerning 
    impact documentation and mitigation for the proposed wetland impacts 
    and recommended that the Final EIS better document how and where the 
    mitigation will occur.
        ERP No. D-UAF-K11080-CA Rating EC2, Programmatic EIS--McClellan Air 
    Force Base (AFB) Disposal and Reuse Including Rezoning of the Main 
    Base, Implementation, Federal Permits, Licenses or Entitlements, 
    Sacramento County, CA.
        Summary: EPA expressed environmental concerns with the project 
    description and water and biological resources. In particular 
    groundwater overdraft.
        ERP No. D-USN-C11013-NY Rating EC2, Naval Weapons Industrial 
    Reserve Plant Calverton Disposal and Reuse, Implementation, Towns of 
    Riverhead and Brookhaven on Long Island, Suffolk County, NY.
        Summary: EPA expressed environmental concerns related to wetlands, 
    ground water, site contamination and remediation, endangered and 
    threatened species, cultural resources and environmental justice.
        ERP No. DS-NAS-A12040-00 Rating EC2, Cassini Spacecraft Exploration 
    Mission to Explore the Planet Saturn and its Moons, Implementation.
        Summary: EPA expressed environmental concerns that the radiological 
    does estimates were presented in the document without sufficient 
    information regarding key underlying assumptions used to make those 
    estimates.
    
    Final EISs
    
        ERP No. F-COE-C35011-00 Newark Bay Confined Disposal Facility 
    (NBCDF), Construction, Dredged Material Disposal Site, NY and NJ.
        Summary: Although the Final EIS addressed many of the concerns 
    expressed by EPA during the review of the Draft EIS, EPA remains 
    concerned that the preferred alternative may not represent the least 
    environmentally damaging practicable alternative. In addition, EPA 
    expressed concern over the proposed cap monitoring program and 
    requested that formal coordination with applicable federal and state 
    agencies occur prior to issuance of a permit to address those concerns.
        ERP No. F-FTA-G40143-TX North Central Corridor Light Rail Transit 
    (LRT) Extension, Transportation Improvements, Funding, NPDES Permit and 
    COE Section 404 Permit, Dallas and Collin Counties, TX.
        Summary: Review of the Final EIS has been completed and the project 
    found to be satisfactory. No formal comment letter was sent to the 
    preparing agency.
        ERP No. F-NOA-C90016-NJ Mullica River-Great Bay National Estuarine 
    Research Reserve Establishment, Site Designation and Plan Implemention, 
    Ocean, Atlantic and Burlington Counties, NJ.
        Summary: EPA had no objections to the implementation of the 
    proposed project. Based upon our review of the FEIS, our concerns have 
    been adequately addressed.
        ERP No. F-SCS-K36115-HI Upcountry Maui Watershed, Implementation, 
    To Address Agricultural Water Shortage, COE Section 404 Permit, Makawao 
    District, Island of Maui, Maui County, HI.
        Summary: Review of the Final EIS was not deemed necessary. No 
    formal comment letter was sent to the preparing agency.
    
        Dated: June 10, 1997.
    William D. Dickerson,
    Director, NEPA Compliance Division, Office of Federal Activities.
    [FR Doc. 97-15622 Filed 6-12-97; 8:45 am]
    BILLING CODE 6560-50-P
    
    
    

Document Information

Published:
06/13/1997
Department:
Environmental Protection Agency
Entry Type:
Notice
Document Number:
97-15622
Pages:
32321-32321 (1 pages)
Docket Numbers:
ER-FRL-5481-5
PDF File:
97-15622.pdf