    DEPARTMENT OF ENERGY
    [Case No. F-069]
    
     
    
    Energy Conservation Program for Consumer Products: Decision and 
    Order Granting a Waiver From the Furnace Test Procedure to DMO 
    Industries
    
    AGENCY: Office of Energy Efficiency and Renewable Energy, Department of 
    Energy.
    
    ACTION: Decision and order.
    
    -----------------------------------------------------------------------
    
    SUMMARY: Notice is given of the Decision and Order (Case No. F-069) 
    granting a Waiver to DMO Industries (DMO) from the existing Department 
    of Energy (DOE) test procedure for furnaces. The Department is granting 
    DMO's Petition for Waiver regarding blower time delay in calculation of 
    Annual Fuel Utilization Efficiency (AFUE) for its HDS series gas 
    furnaces.
    
    FOR FURTHER INFORMATION CONTACT:
    
    Cyrus H. Nasseri, U.S. Department of Energy, Office of Energy 
    Efficiency and Renewable Energy, Mail Station EE-431, Forrestal 
    Building, 1000 Independence Avenue, SW., Washington, DC 20585, (202) 
    586-9138
    Eugene Margolis, Esq., U.S. Department of Energy, Office of General 
    Counsel, Mail Station GC-72, Forrestal Building, 1000 Independence 
    Avenue, SW., Washington, DC 20585, (202) 586-9507
    
    SUPPLEMENTARY INFORMATION: In accordance with 10 CFR 430.27(g), notice 
    is hereby given of the issuance of the Decision and Order as set out 
    below. In the Decision and Order, DMO has been granted a Waiver for its 
    HDS series gas furnaces, permitting the company to use an alternate 
    test method in determining AFUE.
    
        Issued in Washington, DC, June 6, 1994.
    Christine A. Ervin,
    Assistant Secretary, Energy Efficiency and Renewable Energy.
    
    Decision and Order
    
        In the Matter of: DMO Industries. (Case No. F-069)
    
    Background
    
        The Energy Conservation Program for Consumer Products (other than 
    automobiles) was established pursuant to the Energy Policy and 
    Conservation Act (EPCA), Public Law 94-163, 89 Stat. 917, as amended by 
    the National Energy Conservation Policy Act (NECPA), Public Law 95-619, 
    92 Stat. 3266, the National Appliance Energy Conservation Act of 1987 
    (NAECA), Public Law 100-12, the National Appliance Energy Conservation 
    Amendments of 1988 (NAECA 1988), Public Law 100-357, and the Energy 
    Policy Act of 1992 (EPAct), Public Law 102-486, 106 Stat. 2776, which 
    requires DOE to prescribe standardized test procedures to measure the 
    energy consumption of certain consumer products, including furnaces. 
    The intent of the test procedures is to provide a comparable measure of 
    energy consumption that will assist consumers in making purchasing 
    decisions. These test procedures appear at 10 CFR Part 430, subpart B.
        The Department amended the prescribed test procedures by adding 10 
    CFR 430.27 to create a waiver process. 45 FR 64108, September 26, 1980. 
    Thereafter, DOE further amended its appliance test procedure waiver 
    process to allow the Assistant Secretary for Energy Efficiency and 
    Renewable Energy (Assistant Secretary) to grant an Interim Waiver from 
    test procedure requirements to manufacturers that have petitioned DOE 
    for a waiver of such prescribed test procedures. 51 FR 42823, November 
    26, 1986.
        The waiver process allows the Assistant Secretary to waive 
    temporarily test procedures for a particular basic model when a 
    petitioner shows that the basic model contains one or more design 
    characteristics which prevent testing according to the prescribed test 
    procedures or when the prescribed test procedures may evaluate the 
    basic model in a manner so unrepresentative of its true energy 
    consumption as to provide materially inaccurate comparative data. 
    Waivers generally remain in effect until final test procedure 
    amendments become effective, resolving the problem that is the subject 
    of the waiver.
        The Interim Waiver provisions added by the 1986 amendment allow the 
    Assistant Secretary to grant an Interim Waiver when it is determined 
    that the applicant will experience economic hardship if the Application 
    for Interim Waiver is denied, if it appears likely that the Petition 
    for Waiver will be granted, and/or the Assistant Secretary determines 
    that it would be desirable for public policy reasons to grant immediate 
    relief pending a determination on the Petition for Waiver. An Interim 
    Waiver remains in effect for a period of 180 days or until DOE issues 
    its determination on the Petition for Waiver, whichever is sooner, and 
    may be extended for an additional 180 days, if necessary.
        DMO filed a ``Petition for Waiver,'' dated March 4, 1994, in 
    accordance with section 430.27 of 10 CFR Part 430. The Department 
    published in the Federal Register on May 3, 1994, DMO's petition and 
    solicited comments, data and information respecting the petition. 59 FR 
    22844. DMO also filed an ``Application for Interim Waiver'' under 
    section 430.27(g) which DOE granted on April 20, 1994. 59 FR 22844, May 
    3, 1994.
        No comments were received concerning either the ``Petition for 
    Waiver'' or the ``Interim Waiver.'' The Department consulted with The 
    Federal Trade Commission (FTC) concerning the DMO Petition. The FTC did 
    not have any objections to the issuance of the waiver to DMO.
    
    Assertions and Determinations
    
        DMO's Petition seeks a waiver from the DOE test provisions that 
    require a 1.5-minute time delay between the ignition of the burner and 
    the starting of the circulating air blower. DMO requests the allowance 
    to test using a 30-second blower time delay when testing its HDS series 
    gas furnaces. DMO states that since the 30-second delay is indicative 
    of how these models actually operate and since such a delay results in 
    an increase in AFUE of 2.0 percentage points for HDS series gas 
    furnaces, the petition should be granted.
        Under specific circumstances, the DOE test procedure contains 
    exceptions which allow testing with blower delay times of less than the 
    prescribed 1.5-minute delay. DMO indicates that it is unable to take 
    advantage of any of these exceptions for its HDS series gas furnaces.
        Since the blower controls incorporated on the DMO furnaces are 
    designed to impose a 30-second blower delay in every instance of start 
    up, and since the current provisions do not specifically address this 
    type of control, DOE agrees that a waiver should be granted to allow 
    the 30-second blower time delay when testing the HDS series gas 
    furnaces. Accordingly, with regard to testing the HDS series gas 
    furnaces, today's Decision and Order exempts DMO from the existing 
    provisions regarding blower controls and allows testing with the 30-
    second delay.
        It is, therefore, ordered that:
        (1) The ``Petition for Waiver'' filed by DMO Industries (Case No. 
    F-069) is hereby granted as set forth in paragraph (2) below, subject 
    to the provisions of paragraphs (3), (4), and (5).
        (2) Notwithstanding any contrary provisions of Appendix N of 10 CFR 
    Part 430, Subpart B, DMO Industries, shall be permitted to test its HDS 
    series gas furnaces on the basis of the test procedure specified in 10 
    CFR Part 430, with modifications set forth below:
        (i) Section 3.0 of Appendix N is deleted and replaced with the 
    following paragraph:
    
        3.0  Test Procedure. Testing and measurements shall be as 
    specified in section 9 in ANSI/ASHRAE Standard 103-82 with the 
    exception of sections 9.2.2, 9.3.1, and 9.3.2, and the inclusion of 
    the following additional procedures:
    
        (ii) Add a new paragraph 3.10 to Appendix N as follows:
    
        3.10  Gas- and Oil-Fueled Central Furnaces. The following 
    paragraph is in lieu of the requirement specified in section 9.3.1 
    of ANSI/ASHRAE Standard 103-82. After equilibrium conditions are 
    achieved following the cool-down test and the required measurements 
    performed, turn on the furnace and measure the flue gas temperature, 
    using the thermocouple grid described above, at 0.5 and 2.5 minutes 
    after the main burner(s) comes on. After the burner start-up, delay 
    the blower start-up by 1.5 minutes (t-), unless: (1) The furnace 
    employs a single motor to drive the power burner and the indoor air 
    circulating blower, in which case the burner and blower shall be 
    started together; or (2) the furnace is designed to operate using an 
    unvarying delay time that is other than 1.5 minutes, in which case 
    the fan control shall be permitted to start the blower; or (3) the 
    delay time results in the activation of a temperature safety device 
    which shuts off the burner, in which case the fan control shall be 
    permitted to start the blower. In the latter case, if the fan 
    control is adjustable, set it to start the blower at the highest 
    temperature. If the fan control is permitted to start the blower, 
    measure time delay, (t-), using a stopwatch. Record the measured 
    temperatures. During the heat-up test for oil-fueled furnaces, 
    maintain the draft in the flue pipe within 0.01 inch of 
    water column of the manufacturer's recommended on-period draft.
    
        (iii) With the exception of the modifications set forth above, DMO 
    Industries shall comply in all respects with the test procedures 
    specified in Appendix N of 10 CFR Part 430, Subpart B.
        (3) The Waiver shall remain in effect from the date of issuance of 
    this Order until DOE prescribes final test procedures appropriate to 
    the HDS series gas furnaces manufactured by DMO Industries
        (4) This Waiver is based upon the presumed validity of statements, 
    allegations, and documentary materials submitted by the petitioner. 
    This Waiver may be revoked or modified at any time upon a determination 
    that the factual basis underlying the petition is incorrect.
        (5) Effective June 6, 1994, this Waiver supersedes the Interim 
    Waiver granted the DMO Industries on April 20, 1994. 59 FR 22844, May 
    3, 1994 (Case No. F-069).
    
        Issued In Washington, DC, June 6, 1994.
    Christine A. Ervin,
    Assistant Secretary, Energy Efficiency and Renewable Energy.
    [FR Doc. 94-14433 Filed 6-13-94; 8:45 am]
    BILLING CODE 6450-01-P
    
    
    

Document Information

Published:
06/14/1994
Department:
Energy Department
Entry Type:
Uncategorized Document
Action:
Decision and order.
Document Number:
94-14433
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: June 14, 1994, Case No. F-069