94-14494. Panhandle Eastern Pipe Line Company; Amended Filing of FERC Gas Tariff  

  • [Federal Register Volume 59, Number 114 (Wednesday, June 15, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-14494]
    
    
    [[Page Unknown]]
    
    [Federal Register: June 15, 1994]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. RP94-231-001]
    
     
    
    Panhandle Eastern Pipe Line Company; Amended Filing of FERC Gas 
    Tariff
    
    June 9, 1994.
        Take notice that on June 6, 1994, Panhandle Eastern Pipe Line 
    Company (Panhandle) tendered for filing the following substitute tariff 
    sheets to its FERC Gas Tariff, First Revised Volume No. 1, pertaining 
    to the flow through mechanism for the recovery of Dakota Gasification 
    Transition Costs billed to Panhandle by ANR Pipeline Company (ANR). 
    Panhandle proposes that the substitute tariff sheets become effective 
    June 1, 1994:
    
    Substitute Second Revised Sheet No. 11
    Substitute Second Revised Sheet No. 12
    Substitute Second Revised Sheet No. 13
    Substitute First Revised Sheet No. 14
    
        The Commission approved the implementation of a mechanism to flow 
    through the Dakota Gasification Transition Costs, subject to refund and 
    subject to the ultimate disposition of proceedings in Docket No. RP94-
    150-000, by order dated May 27, 1994. Panhandle states that the 
    substitute tariff sheets should be accepted for filing because 
    Panhandle has not actually been billed for the transition costs by ANR 
    for the first quarter. Consequently, the substitute tariff sheets 
    reduce the surcharge associated with the Dakota Gasification Transition 
    Costs to zero. Panhandle also states that it reserves its right to file 
    subsequently under Section 18.11 of the General Terms and Conditions of 
    its Tariff to implement the flow through cost recovery mechanism as may 
    be necessary in the future.
        Panhandle requests that the Commission grant all necessary waivers 
    of the Regulations so as to place the instant substitute tariff sheets 
    and attendant surcharge into effect on June 1, 1994.
        Panhandle states that a copy of this tariff filing is being served 
    on all affected customers and state commissions.
        Any person desiring to protest the said filing should file a 
    protest with the Federal Energy Regulatory Commission, 825 North 
    Capitol Street, NE., Washington, DC, 20426, in accordance with Section 
    385.211 of the Commission's Rules and Regulations. All such protests 
    should be filed on or before June 16, 1994. Protests will be considered 
    by the Commission in determining the appropriate action to be taken, 
    but will not serve to make the protestants parties to the proceeding. 
    Copies of this filing are on file with the Commission and are available 
    for public inspection in the public reference room.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 94-14494 Filed 6-14-94; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
06/15/1994
Department:
Energy Department
Entry Type:
Uncategorized Document
Document Number:
94-14494
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: June 15, 1994, Docket No. RP94-231-001